{"id":2984511,"date":"2026-10-13T15:00:37","date_gmt":"2026-10-13T22:00:37","guid":{"rendered":"https:\/\/www.esri.com\/arcgis-blog\/?post_type=blog&#038;p=2984511"},"modified":"2026-10-13T15:48:33","modified_gmt":"2026-10-13T22:48:33","slug":"from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis","status":"publish","type":"blog","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis","title":{"rendered":"From Plan to Verification: An Electric Utility As-Built Workflow with ArcGIS"},"author":263392,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","format":"standard","meta":{"_acf_changed":false,"_searchwp_excluded":""},"categories":[25741,23261],"tags":[27971,757121,35461],"industry":[],"product":[679821,515312,774772,760392],"class_list":["post-2984511","blog","type-blog","status-publish","format-standard","hentry","category-electric-gas","category-field-mobility","tag-editing","tag-field-workflow","tag-utility-network","product-field-maps","product-utility-network","product-web-editor","product-workflow-manager"],"acf":{"authors":[{"ID":426969,"user_firstname":"Jessica","user_lastname":"Gooch","nickname":"Jessica Gooch","user_nicename":"jgooch","display_name":"Jess Gooch","user_email":"jgooch@esri.com","user_url":"","user_registered":"2025-12-09 18:10:37","user_description":"Jess is a Solution Engineer on the Infrastructure team with a focus on the Utility Network.  She lives in Southern NH where she enjoys paddleboarding in the summer and snowboarding in the winter.","user_avatar":"<img data-del=\"avatar\" src='https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2025\/12\/1730550919117-213x200.jpg' class='avatar pp-user-avatar avatar-96 photo ' height='96' width='96'\/>"},{"ID":67691,"user_firstname":"Mike","user_lastname":"Hirschheimer","nickname":"Mike Hirschheimer","user_nicename":"mhirschheimer","display_name":"Michael Hirschheimer","user_email":"mhirschheimer@esri.com","user_url":"","user_registered":"2020-07-21 14:49:54","user_description":"Mike Hirschheimer is a Senior Solution Engineer on the Infrastructure team with a focus on the Utility Network.   He is a big sports fan who enjoys watching NFL games and playing disc golf &amp; pickleball.","user_avatar":"<img data-del=\"avatar\" src='https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2025\/12\/meh2025-213x200.jpg' class='avatar pp-user-avatar avatar-96 photo ' height='96' width='96'\/>"},{"ID":263392,"user_firstname":"Albert","user_lastname":"Schelin","nickname":"Albert Schelin","user_nicename":"aschelin","display_name":"Albert Schelin","user_email":"ASchelin@esri.com","user_url":"","user_registered":"2021-08-12 21:11:17","user_description":"Albert is a Product Marketing Manager at Esri, promoting ArcGIS Web Editor and ArcGIS Data Pipelines. When he isn't promoting Esri's products, you can find him enjoying a cup of single origin light roast coffee at a local coffee shop.","user_avatar":"<img data-del=\"avatar\" src='https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2025\/02\/albert-schelin-3z7a7057-213x200.jpg' class='avatar pp-user-avatar avatar-96 photo ' height='96' width='96'\/>"}],"short_description":"Track an electric utility meter install from plan to field verification using Workflow Manager, Web Editor, and Field Maps Tasks.","flexible_content":[{"acf_fc_layout":"content","content":"<p>Every electric utility organization begins with a mission: to deliver safe, reliable power to homes, businesses, and communities.<\/p>\n<p>Each project that a utility undertakes, whether it is a large substation project, a new subdivision, or a single service line and meter installation needs to be planned, tracked and verified to meet that mission.<\/p>\n<p>The journey starts in the design phase, where engineers use advanced tools to plan the layout of power lines, structures, transformers, and other critical assets. They consider factors like load forecasts, risks, regulatory requirements, and future growth.<\/p>\n<p>The goal is to create a system that is efficient, resilient, and cost-effective.<\/p>\n<p>To meet this goal, electric utilities need a way to track the end-to-end process- from documenting the project plan to designing the new assets all the way through the construction and verification phases.<\/p>\n<p>Once the design is approved, the construction team installs all the components and connects the assets according to the plan. However, there are times when the design needs to be modified for unexpected obstacles like rocks, underground utilities, property boundaries and more. Adjustments are made in the field and redlined on the design plan.<\/p>\n<p>The as-built process takes the design and what was built and verifies what actually was installed. This information can take weeks to months to get back into GIS, which is a critical step for safety, maintenance and future upgrades. Ensuring the data gets into the GIS quickly and accurately is vital for many reasons including operational efficiency, outage management, regulatory compliance, planning and analysis, and more.<\/p>\n<p>In this blog, we will explore how a utility can take advantage of Esri technology to track a new service meter installation from plan, to design, to construction and verification of what was built in the field.<\/p>\n<h2><strong>Quick Links<\/strong><\/h2>\n<p>Jump to a section in this blog using the links below.<\/p>\n<ul>\n<li style=\"list-style-type: none\">\n<ul>\n<li><a href=\"#using\" rel=\"noopener\">Using ArcGIS Workflow Manager, ArcGIS Web Editor and ArcGIS Field Maps Tasks for an Electric As-Built workflow.<\/a><\/li>\n<li><a href=\"#overview\" rel=\"noopener\">Project Overview<\/a><\/li>\n<li><a href=\"#manage\" rel=\"noopener\">Manage Projects<\/a><\/li>\n<li><a href=\"#kickoff\" rel=\"noopener\">Kickoff and Project Set up \u2013 Manager<\/a><\/li>\n<li><a href=\"#desktop\" rel=\"noopener\">Desktop Design \u2013 Engineer<\/a><\/li>\n<li><a href=\"#construction\" rel=\"noopener\">Construction Occurs<\/a><\/li>\n<li><a href=\"#verification\" rel=\"noopener\">Verification of built assets<\/a><\/li>\n<li><a href=\"#qaqc\" rel=\"noopener\">QAQC \u2013 GIS Analyst<\/a><\/li>\n<li><a href=\"#wrapup\" rel=\"noopener\">Wrap-Up<\/a><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<h1 id=\"using\"><\/h1>\n<h2><strong>Using ArcGIS Workflow Manager, ArcGIS Web Editor and ArcGIS Field Maps Tasks for an Electric As-Built workflow.<\/strong><\/h2>\n<p>Using <a href=\"https:\/\/www.esri.com\/en-us\/arcgis\/products\/arcgis-workflow-manager\/overview\" target=\"_blank\" rel=\"noopener\">ArcGIS Workflow Manager<\/a> helps an organization keep track of all of their projects, and follow them through each phase, all while documenting each step along the way.<\/p>\n<p>This workflow walks users through a new meter installation from job creation to job completion. This includes creating a project area, updating details of the project, adding documents, and assigning an engineer to add the new assets using ArcGIS Web Editor.<\/p>\n<p>Once the new features have been created, the features are constructed and a task in ArcGIS Field Maps is created to verify the meter installation location. Finally, QAQC of the new assets takes place and the job is completed.<\/p>\n<h1 id=\"overview\"><\/h1>\n<h2><strong>Project Overview<\/strong><\/h2>\n<h3><strong>Workflow Manager Diagram 1 \u2013 New Meter Installation<\/strong><\/h3>\n<p>In our workflow, we have two job templates (with their own sets of steps and assignments) that we will be using to perform and track the work. The parent job template will walk the user through the creation of the new Meter Installation project, assigning an engineer to add the new assets into the GIS, and then walk through the construction steps. Once construction has been completed, the workflow will create a child job using the second job template to assign a mobile worker to go and do a new meter verification task. While this is being performed, the parent job will be placed on hold waiting for the task to be completed. Once the new meter install has been verified, the job is routed through a QAQC process in ArcGIS Pro.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984838,"id":2984838,"title":"Screenshot 2026-10-13 125454","filename":"Screenshot-2026-10-13-125454.png","filesize":100057,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Screenshot-2026-10-13-125454.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/screenshot-2026-10-13-125454","alt":"","author":"263392","description":"","caption":"","name":"screenshot-2026-10-13-125454","status":"inherit","uploaded_to":2984511,"date":"2026-10-13 16:56:34","modified":"2026-10-13 16:56:34","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":1463,"height":643,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Screenshot-2026-10-13-125454-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Screenshot-2026-10-13-125454.png","medium-width":464,"medium-height":204,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Screenshot-2026-10-13-125454.png","medium_large-width":768,"medium_large-height":338,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Screenshot-2026-10-13-125454.png","large-width":1463,"large-height":643,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Screenshot-2026-10-13-125454.png","1536x1536-width":1463,"1536x1536-height":643,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Screenshot-2026-10-13-125454.png","2048x2048-width":1463,"2048x2048-height":643,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Screenshot-2026-10-13-125454-826x363.png","card_image-width":826,"card_image-height":363,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Screenshot-2026-10-13-125454.png","wide_image-width":1463,"wide_image-height":643}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<h3><strong>Workflow Manager Diagram 2 \u2013 Verification of New Meter Build<\/strong><\/h3>\n<p>This child job consists of steps to create a New Meter Verification task* in ArcGIS Field Maps and assigns it so the field worker sees it in their list of work. Once the task is completed, this job will close, and the parent job will resume carrying out the remaining job steps.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984596,"id":2984596,"title":"Picture2","filename":"Picture2.png","filesize":25889,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture2.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture2-121","alt":"","author":"263392","description":"","caption":"","name":"picture2-121","status":"inherit","uploaded_to":2984511,"date":"2026-10-09 23:53:46","modified":"2026-10-09 23:53:46","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":135,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture2-213x135.png","thumbnail-width":213,"thumbnail-height":135,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture2.png","medium-width":464,"medium-height":80,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture2.png","medium_large-width":768,"medium_large-height":133,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture2.png","large-width":780,"large-height":135,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture2.png","1536x1536-width":780,"1536x1536-height":135,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture2.png","2048x2048-width":780,"2048x2048-height":135,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture2.png","card_image-width":780,"card_image-height":135,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture2.png","wide_image-width":780,"wide_image-height":135}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>*New in ArcGIS Online and coming soon to ArcGIS Enterprise is the new <a href=\"https:\/\/doc.arcgis.com\/en\/workflow-manager\/latest\/help\/create-field-maps-task.htm\" target=\"_blank\" rel=\"noopener\">Create Field Maps Task<\/a> step<\/p>\n<h3 id=\"manage\"><\/h3>\n<h2><strong>Manage Projects<\/strong><\/h2>\n<p>In the Workflow Manager web app, we can view and manage all of the jobs that are a part of our Meter Installation project. On the Manage page, we can easily view the list of jobs that have been created, see the assignee, job name, priority, due date, and more.<\/p>\n<p>If we open the panel on the right hand side we can also view details about the job, project, and the field task information.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984597,"id":2984597,"title":"Picture3","filename":"Picture3.png","filesize":99689,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture3.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture3-106","alt":"","author":"263392","description":"","caption":"","name":"picture3-106","status":"inherit","uploaded_to":2984511,"date":"2026-10-09 23:55:17","modified":"2026-10-09 23:55:17","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":563,"height":260,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture3-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture3.png","medium-width":464,"medium-height":214,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture3.png","medium_large-width":563,"medium_large-height":260,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture3.png","large-width":563,"large-height":260,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture3.png","1536x1536-width":563,"1536x1536-height":260,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture3.png","2048x2048-width":563,"2048x2048-height":260,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture3.png","card_image-width":563,"card_image-height":260,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture3.png","wide_image-width":563,"wide_image-height":260}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>The Job details are set in the Design page under the Profile tab of the New Meter Installation job template.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984598,"id":2984598,"title":"Picture4","filename":"Picture4.png","filesize":45078,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture4.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture4-98","alt":"","author":"263392","description":"","caption":"","name":"picture4-98","status":"inherit","uploaded_to":2984511,"date":"2026-10-09 23:55:58","modified":"2026-10-09 23:55:58","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":430,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture4-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture4.png","medium-width":464,"medium-height":256,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture4.png","medium_large-width":768,"medium_large-height":423,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture4.png","large-width":780,"large-height":430,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture4.png","1536x1536-width":780,"1536x1536-height":430,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture4.png","2048x2048-width":780,"2048x2048-height":430,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture4.png","card_image-width":780,"card_image-height":430,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture4.png","wide_image-width":780,"wide_image-height":430}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>And the Project Details are set under the Extended Properties tab.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984599,"id":2984599,"title":"Picture5","filename":"Picture5.png","filesize":66787,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture5.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture5-83","alt":"","author":"263392","description":"","caption":"","name":"picture5-83","status":"inherit","uploaded_to":2984511,"date":"2026-10-09 23:57:22","modified":"2026-10-09 23:57:22","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":435,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture5-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture5.png","medium-width":464,"medium-height":259,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture5.png","medium_large-width":768,"medium_large-height":428,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture5.png","large-width":780,"large-height":435,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture5.png","1536x1536-width":780,"1536x1536-height":435,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture5.png","2048x2048-width":780,"2048x2048-height":435,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture5.png","card_image-width":780,"card_image-height":435,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture5.png","wide_image-width":780,"wide_image-height":435}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"image","image":{"ID":2984600,"id":2984600,"title":"Picture6","filename":"Picture6.png","filesize":60363,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture6.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture6-75","alt":"","author":"263392","description":"","caption":"","name":"picture6-75","status":"inherit","uploaded_to":2984511,"date":"2026-10-09 23:57:48","modified":"2026-10-09 23:57:48","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":403,"height":668,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture6-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture6.png","medium-width":157,"medium-height":261,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture6.png","medium_large-width":403,"medium_large-height":668,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture6.png","large-width":403,"large-height":668,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture6.png","1536x1536-width":403,"1536x1536-height":668,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture6.png","2048x2048-width":403,"2048x2048-height":668,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture6-281x465.png","card_image-width":281,"card_image-height":465,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture6.png","wide_image-width":403,"wide_image-height":668}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>Let\u2019s create a new Meter Installation and Verification job in Workflow Manager!<\/p>\n<h1 id=\"kickoff\"><\/h1>\n<h2><strong>Kickoff and Project Set up &#8211; Manager<\/strong><\/h2>\n<p>The first step in this job is to set up the new project and create it.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984840,"id":2984840,"title":"Screenshot 2026-10-13 red","filename":"Screenshot-2026-10-13-red.png","filesize":107316,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Screenshot-2026-10-13-red.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/screenshot-2026-10-13-red","alt":"","author":"263392","description":"","caption":"","name":"screenshot-2026-10-13-red","status":"inherit","uploaded_to":2984511,"date":"2026-10-13 17:03:55","modified":"2026-10-13 17:03:55","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":1463,"height":643,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Screenshot-2026-10-13-red-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Screenshot-2026-10-13-red.png","medium-width":464,"medium-height":204,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Screenshot-2026-10-13-red.png","medium_large-width":768,"medium_large-height":338,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Screenshot-2026-10-13-red.png","large-width":1463,"large-height":643,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Screenshot-2026-10-13-red.png","1536x1536-width":1463,"1536x1536-height":643,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Screenshot-2026-10-13-red.png","2048x2048-width":1463,"2048x2048-height":643,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Screenshot-2026-10-13-red-826x363.png","card_image-width":826,"card_image-height":363,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Screenshot-2026-10-13-red.png","wide_image-width":1463,"wide_image-height":643}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>Opening the Work page, we click on New Meter Installation. This creates a new job, JOB_135. We will follow this job throughout the workflow. On the right-hand side, we see all of the important details of the job and the project.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984603,"id":2984603,"title":"Picture8","filename":"Picture8.png","filesize":80810,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture8.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture8-50","alt":"","author":"263392","description":"","caption":"","name":"picture8-50","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:01:57","modified":"2026-10-10 00:01:57","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":440,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture8-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture8.png","medium-width":464,"medium-height":261,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture8.png","medium_large-width":768,"medium_large-height":433,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture8.png","large-width":780,"large-height":440,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture8.png","1536x1536-width":780,"1536x1536-height":440,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture8.png","2048x2048-width":780,"2048x2048-height":440,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture8.png","card_image-width":780,"card_image-height":440,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture8.png","wide_image-width":780,"wide_image-height":440}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>We outlined earlier, where the Job and Project details are set up.<\/p>\n<h3><strong>Kicking off the New Meter Installation Job<\/strong><\/h3>\n<p>We are now ready to begin the job, and we start with the Project Kickoff step.<\/p>\n<p>When we first start a job, we need to go to My Group Jobs to find the job because as we can see by the W this job is not assigned to a person, but to a group. To begin the job, we need to click the start button to move on to the next step.<\/p>\n<h3><strong>Create a project area<\/strong><\/h3>\n<p>Once the kickoff step has been run, the job gets assigned and the Create Project Area step is now active.<\/p>\n<p>When creating a project area you can either select a parcel on the map or draw in a polygon. In this case, we will select the parcel that is associated with the new meter installation and create the job area.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984604,"id":2984604,"title":"Picture9","filename":"Picture9.png","filesize":76814,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture9.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture9-44","alt":"","author":"263392","description":"","caption":"","name":"picture9-44","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:03:11","modified":"2026-10-10 00:03:11","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":240,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture9-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture9.png","medium-width":464,"medium-height":143,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture9.png","medium_large-width":768,"medium_large-height":236,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture9.png","large-width":780,"large-height":240,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture9.png","1536x1536-width":780,"1536x1536-height":240,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture9.png","2048x2048-width":780,"2048x2048-height":240,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture9.png","card_image-width":780,"card_image-height":240,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture9.png","wide_image-width":780,"wide_image-height":240}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>Using the select tool, we select the parcel where we need to add a new meter and click Proceed.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984606,"id":2984606,"title":"Picture10","filename":"Picture10.png","filesize":82707,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture10.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture10-44","alt":"","author":"263392","description":"","caption":"","name":"picture10-44","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:05:29","modified":"2026-10-10 00:05:29","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":238,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture10-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture10.png","medium-width":464,"medium-height":142,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture10.png","medium_large-width":768,"medium_large-height":234,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture10.png","large-width":780,"large-height":238,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture10.png","1536x1536-width":780,"1536x1536-height":238,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture10.png","2048x2048-width":780,"2048x2048-height":238,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture10.png","card_image-width":780,"card_image-height":238,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture10.png","wide_image-width":780,"wide_image-height":238}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>The next step is to verify or update the project details. If changes are needed, we can update, and if things are ready, we can click proceed.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984607,"id":2984607,"title":"Picture11","filename":"Picture11.png","filesize":45158,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture11.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture11-36","alt":"","author":"263392","description":"","caption":"","name":"picture11-36","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:06:31","modified":"2026-10-10 00:06:31","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":400,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture11-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture11.png","medium-width":464,"medium-height":238,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture11.png","medium_large-width":768,"medium_large-height":394,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture11.png","large-width":780,"large-height":400,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture11.png","1536x1536-width":780,"1536x1536-height":400,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture11.png","2048x2048-width":780,"2048x2048-height":400,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture11.png","card_image-width":780,"card_image-height":400,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture11.png","wide_image-width":780,"wide_image-height":400}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>The next step allows the user to add any important documentation to the workflow. We have set up this step to allow for PDF documents to be attached. We click the Browse button to navigate to my document, which in this case is a PDF meter plan.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984609,"id":2984609,"title":"Picture12","filename":"Picture12.png","filesize":15682,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture12.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture12-35","alt":"","author":"263392","description":"","caption":"","name":"picture12-35","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:09:07","modified":"2026-10-10 00:09:07","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":130,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture12-213x130.png","thumbnail-width":213,"thumbnail-height":130,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture12.png","medium-width":464,"medium-height":77,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture12.png","medium_large-width":768,"medium_large-height":128,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture12.png","large-width":780,"large-height":130,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture12.png","1536x1536-width":780,"1536x1536-height":130,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture12.png","2048x2048-width":780,"2048x2048-height":130,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture12.png","card_image-width":780,"card_image-height":130,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture12.png","wide_image-width":780,"wide_image-height":130}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>And then click Proceed.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984610,"id":2984610,"title":"Picture13","filename":"Picture13.png","filesize":20302,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture13.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture13-31","alt":"","author":"263392","description":"","caption":"","name":"picture13-31","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:09:27","modified":"2026-10-10 00:09:27","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":145,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture13-213x145.png","thumbnail-width":213,"thumbnail-height":145,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture13.png","medium-width":464,"medium-height":86,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture13.png","medium_large-width":768,"medium_large-height":143,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture13.png","large-width":780,"large-height":145,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture13.png","1536x1536-width":780,"1536x1536-height":145,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture13.png","2048x2048-width":780,"2048x2048-height":145,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture13.png","card_image-width":780,"card_image-height":145,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture13.png","wide_image-width":780,"wide_image-height":145}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>Any document that is attached to the job can be accessed in the Job Details under the attachments button pane at any time.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984611,"id":2984611,"title":"Picture14","filename":"Picture14.png","filesize":12910,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture14.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture14-25","alt":"","author":"263392","description":"","caption":"","name":"picture14-25","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:09:53","modified":"2026-10-10 00:09:53","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":405,"height":300,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture14-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture14.png","medium-width":352,"medium-height":261,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture14.png","medium_large-width":405,"medium_large-height":300,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture14.png","large-width":405,"large-height":300,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture14.png","1536x1536-width":405,"1536x1536-height":300,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture14.png","2048x2048-width":405,"2048x2048-height":300,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture14.png","card_image-width":405,"card_image-height":300,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture14.png","wide_image-width":405,"wide_image-height":300}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>Once validated that the required documents have been attached, we can move on to the next phase of the project which is the Desktop Design.<\/p>\n<h1 id=\"desktop\"><\/h1>\n<h2><strong>Desktop Design &#8211; Engineer <\/strong><\/h2>\n"},{"acf_fc_layout":"image","image":{"ID":2984613,"id":2984613,"title":"Picture15","filename":"Picture15.png","filesize":45253,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture15.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture15-16","alt":"","author":"263392","description":"","caption":"","name":"picture15-16","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:11:21","modified":"2026-10-10 00:11:21","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":490,"height":220,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture15-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture15.png","medium-width":464,"medium-height":208,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture15.png","medium_large-width":490,"medium_large-height":220,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture15.png","large-width":490,"large-height":220,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture15.png","1536x1536-width":490,"1536x1536-height":220,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture15.png","2048x2048-width":490,"2048x2048-height":220,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture15.png","card_image-width":490,"card_image-height":220,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture15.png","wide_image-width":490,"wide_image-height":220}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>As these Meter Installation projects have multiple phases and can take weeks to months to complete, being able to identify which phase any given job is in is very important. At this stage we will be moving from the Project Kickoff phase to the Desktop Design Phase.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984614,"id":2984614,"title":"Picture16","filename":"Picture16.png","filesize":26775,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture16.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture16-17","alt":"","author":"263392","description":"","caption":"","name":"picture16-17","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:11:48","modified":"2026-10-10 00:11:48","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":195,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture16-213x195.png","thumbnail-width":213,"thumbnail-height":195,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture16.png","medium-width":464,"medium-height":116,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture16.png","medium_large-width":768,"medium_large-height":192,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture16.png","large-width":780,"large-height":195,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture16.png","1536x1536-width":780,"1536x1536-height":195,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture16.png","2048x2048-width":780,"2048x2048-height":195,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture16.png","card_image-width":780,"card_image-height":195,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture16.png","wide_image-width":780,"wide_image-height":195}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>Let\u2019s choose the project phase Desktop Design and click proceed.<\/p>\n<p>We now need to assign an engineer to add the new meter design. Once this job gets assigned to the engineer, they will then see this in their list of jobs to be completed.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984615,"id":2984615,"title":"Picture17","filename":"Picture17.png","filesize":22385,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture17.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture17-15","alt":"","author":"263392","description":"","caption":"","name":"picture17-15","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:12:33","modified":"2026-10-10 00:12:33","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":150,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture17-213x150.png","thumbnail-width":213,"thumbnail-height":150,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture17.png","medium-width":464,"medium-height":89,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture17.png","medium_large-width":768,"medium_large-height":148,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture17.png","large-width":780,"large-height":150,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture17.png","1536x1536-width":780,"1536x1536-height":150,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture17.png","2048x2048-width":780,"2048x2048-height":150,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture17.png","card_image-width":780,"card_image-height":150,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture17.png","wide_image-width":780,"wide_image-height":150}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>Use Web Editor to create the new features.<\/p>\n<p>Next, we open the ArcGIS Web Editor to the map where the Engineer will then be able to add in the new meter and service line.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984616,"id":2984616,"title":"Picture18","filename":"Picture18.png","filesize":11197,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture18.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture18-19","alt":"","author":"263392","description":"","caption":"","name":"picture18-19","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:13:05","modified":"2026-10-10 00:13:05","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":60,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture18-213x60.png","thumbnail-width":213,"thumbnail-height":60,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture18.png","medium-width":464,"medium-height":36,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture18.png","medium_large-width":768,"medium_large-height":59,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture18.png","large-width":780,"large-height":60,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture18.png","1536x1536-width":780,"1536x1536-height":60,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture18.png","2048x2048-width":780,"2048x2048-height":60,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture18.png","card_image-width":780,"card_image-height":60,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture18.png","wide_image-width":780,"wide_image-height":60}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"image","image":{"ID":2984617,"id":2984617,"title":"Picture19","filename":"Picture19.png","filesize":193105,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture19.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture19-12","alt":"","author":"263392","description":"","caption":"","name":"picture19-12","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:13:23","modified":"2026-10-10 00:13:23","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":415,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture19-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture19.png","medium-width":464,"medium-height":247,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture19.png","medium_large-width":768,"medium_large-height":409,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture19.png","large-width":780,"large-height":415,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture19.png","1536x1536-width":780,"1536x1536-height":415,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture19.png","2048x2048-width":780,"2048x2048-height":415,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture19.png","card_image-width":780,"card_image-height":415,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture19.png","wide_image-width":780,"wide_image-height":415}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>This step has been configured to open our editing map by using the Open Web Page step to link to ArcGIS Web Editor* and editing map.<\/p>\n<p>*In this workflow we are linking directly to ArcGIS Web Editor and map, you could also create an ArcGIS Instant App using the <a href=\"https:\/\/doc.arcgis.com\/en\/instant-apps\/latest\/create-apps\/web-editor.htm\" target=\"_blank\" rel=\"noopener\">Web Editor Template<\/a> in ArcGIS Online and ArcGIS Enterprise 12.1.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984618,"id":2984618,"title":"Picture20","filename":"Picture20.png","filesize":382227,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture20.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture20-10","alt":"","author":"263392","description":"","caption":"","name":"picture20-10","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:15:44","modified":"2026-10-10 00:15:44","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":440,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture20-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture20.png","medium-width":464,"medium-height":261,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture20.png","medium_large-width":768,"medium_large-height":433,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture20.png","large-width":780,"large-height":440,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture20.png","1536x1536-width":780,"1536x1536-height":440,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture20.png","2048x2048-width":780,"2048x2048-height":440,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture20.png","card_image-width":780,"card_image-height":440,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture20.png","wide_image-width":780,"wide_image-height":440}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>The Engineer will now use this application to add in the new meter and service line.<\/p>\n<p>We can see what version of our database we are editing in \u2013 as seen here by the title<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984619,"id":2984619,"title":"Picture21","filename":"Picture21.png","filesize":8711,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture21.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture21-13","alt":"","author":"263392","description":"","caption":"","name":"picture21-13","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:16:36","modified":"2026-10-10 00:16:36","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":550,"height":60,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture21-213x60.png","thumbnail-width":213,"thumbnail-height":60,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture21.png","medium-width":464,"medium-height":51,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture21.png","medium_large-width":550,"medium_large-height":60,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture21.png","large-width":550,"large-height":60,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture21.png","1536x1536-width":550,"1536x1536-height":60,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture21.png","2048x2048-width":550,"2048x2048-height":60,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture21.png","card_image-width":550,"card_image-height":60,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture21.png","wide_image-width":550,"wide_image-height":60}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>As it is best practice to not edit in Default, we can switch to and editing version:<\/p>\n<p>Click where it says sde.DEFAULT and then search for the version you want to use; in this case it will be the WFM_WebEditing version.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984621,"id":2984621,"title":"Picture22","filename":"Picture22.png","filesize":31224,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture22.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture22-8","alt":"","author":"263392","description":"","caption":"","name":"picture22-8","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:17:30","modified":"2026-10-10 00:17:30","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":690,"height":275,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture22-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture22.png","medium-width":464,"medium-height":185,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture22.png","medium_large-width":690,"medium_large-height":275,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture22.png","large-width":690,"large-height":275,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture22.png","1536x1536-width":690,"1536x1536-height":275,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture22.png","2048x2048-width":690,"2048x2048-height":275,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture22.png","card_image-width":690,"card_image-height":275,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture22.png","wide_image-width":690,"wide_image-height":275}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>Now we are ready to edit.<\/p>\n<p>First, we\u2019ll zoom into the job location.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984622,"id":2984622,"title":"Picture23","filename":"Picture23.png","filesize":154817,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture23.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture23-10","alt":"","author":"263392","description":"","caption":"","name":"picture23-10","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:18:08","modified":"2026-10-10 00:18:08","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":430,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture23-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture23.png","medium-width":464,"medium-height":256,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture23.png","medium_large-width":768,"medium_large-height":423,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture23.png","large-width":780,"large-height":430,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture23.png","1536x1536-width":780,"1536x1536-height":430,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture23.png","2048x2048-width":780,"2048x2048-height":430,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture23.png","card_image-width":780,"card_image-height":430,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture23.png","wide_image-width":780,"wide_image-height":430}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>Next, Let\u2019s enable snapping.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984623,"id":2984623,"title":"Picture24","filename":"Picture24.png","filesize":69175,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture24.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture24-6","alt":"","author":"263392","description":"","caption":"","name":"picture24-6","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:18:37","modified":"2026-10-10 00:18:37","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":405,"height":553,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture24-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture24.png","medium-width":191,"medium-height":261,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture24.png","medium_large-width":405,"medium_large-height":553,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture24.png","large-width":405,"large-height":553,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture24.png","1536x1536-width":405,"1536x1536-height":553,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture24.png","2048x2048-width":405,"2048x2048-height":553,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture24-341x465.png","card_image-width":341,"card_image-height":465,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture24.png","wide_image-width":405,"wide_image-height":553}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>This web map has been configured with Group Templates to make editing and adding in repeating features easier. We click the Create button and search for the editing template we want to use.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984624,"id":2984624,"title":"Picture25","filename":"Picture25.png","filesize":8541,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture25.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture25-5","alt":"","author":"263392","description":"","caption":"","name":"picture25-5","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:19:19","modified":"2026-10-10 00:19:19","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":445,"height":70,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture25-213x70.png","thumbnail-width":213,"thumbnail-height":70,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture25.png","medium-width":445,"medium-height":70,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture25.png","medium_large-width":445,"medium_large-height":70,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture25.png","large-width":445,"large-height":70,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture25.png","1536x1536-width":445,"1536x1536-height":70,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture25.png","2048x2048-width":445,"2048x2048-height":70,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture25.png","card_image-width":445,"card_image-height":70,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture25.png","wide_image-width":445,"wide_image-height":70}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p style=\"padding-left: 40px\">1. Search for the editing template to be used.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984625,"id":2984625,"title":"Picture26","filename":"Picture26.png","filesize":25205,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture26.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture26-7","alt":"","author":"263392","description":"","caption":"","name":"picture26-7","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:19:42","modified":"2026-10-10 00:19:42","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":295,"height":390,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture26-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture26.png","medium-width":197,"medium-height":261,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture26.png","medium_large-width":295,"medium_large-height":390,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture26.png","large-width":295,"large-height":390,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture26.png","1536x1536-width":295,"1536x1536-height":390,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture26.png","2048x2048-width":295,"2048x2048-height":390,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture26.png","card_image-width":295,"card_image-height":390,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture26.png","wide_image-width":295,"wide_image-height":390}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p style=\"padding-left: 40px\">2. Draw the new service by snapping to the transformer and drawing the line to the corner of the house.<\/p>\n<p style=\"padding-left: 40px\">3. Update attributes of each feature \u2013 in this case there are two features. As this is a Utility Network, we have updated the Lifecycle Status and the Construction Status to be Proposed, Design.<\/p>\n<p style=\"padding-left: 40px\">4. Click Create All.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984626,"id":2984626,"title":"Picture27","filename":"Picture27.png","filesize":160207,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture27.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture27-5","alt":"","author":"263392","description":"","caption":"","name":"picture27-5","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:21:07","modified":"2026-10-10 00:21:07","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":435,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture27-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture27.png","medium-width":464,"medium-height":259,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture27.png","medium_large-width":768,"medium_large-height":428,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture27.png","large-width":780,"large-height":435,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture27.png","1536x1536-width":780,"1536x1536-height":435,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture27.png","2048x2048-width":780,"2048x2048-height":435,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture27.png","card_image-width":780,"card_image-height":435,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture27.png","wide_image-width":780,"wide_image-height":435}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>Validate the Edits and save.<\/p>\n<p style=\"padding-left: 40px\">5. Open the Utility Network toolbar.<\/p>\n<p style=\"padding-left: 40px\">6. Click Validate Edits.<\/p>\n<p style=\"padding-left: 40px\">7. Click Save Edits.<\/p>\n<p style=\"padding-left: 40px\">8. Click Finish to move to the next phase of the Workflow Manager project.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984627,"id":2984627,"title":"Picture28","filename":"Picture28.png","filesize":208364,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture28.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture28-6","alt":"","author":"263392","description":"","caption":"","name":"picture28-6","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:22:31","modified":"2026-10-10 00:22:31","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":410,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture28-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture28.png","medium-width":464,"medium-height":244,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture28.png","medium_large-width":768,"medium_large-height":404,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture28.png","large-width":780,"large-height":410,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture28.png","1536x1536-width":780,"1536x1536-height":410,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture28.png","2048x2048-width":780,"2048x2048-height":410,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture28.png","card_image-width":780,"card_image-height":410,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture28.png","wide_image-width":780,"wide_image-height":410}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>Now that the design has been completed, the job moves on to the Construction phase, where the workflow asks to double-check that you are ready to move on. In this case, we would click Yes \u2013 Move on to Construction Phase.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984628,"id":2984628,"title":"Picture29","filename":"Picture29.png","filesize":18164,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture29.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture29-6","alt":"","author":"263392","description":"","caption":"","name":"picture29-6","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:23:12","modified":"2026-10-10 00:23:12","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":130,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture29-213x130.png","thumbnail-width":213,"thumbnail-height":130,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture29.png","medium-width":464,"medium-height":77,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture29.png","medium_large-width":768,"medium_large-height":128,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture29.png","large-width":780,"large-height":130,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture29.png","1536x1536-width":780,"1536x1536-height":130,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture29.png","2048x2048-width":780,"2048x2048-height":130,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture29.png","card_image-width":780,"card_image-height":130,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture29.png","wide_image-width":780,"wide_image-height":130}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<h1 id=\"construction\"><\/h1>\n<h2><strong>Construction Occurs <\/strong><\/h2>\n"},{"acf_fc_layout":"image","image":{"ID":2984630,"id":2984630,"title":"Picture30","filename":"Picture30.png","filesize":52233,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture30.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture30-5","alt":"","author":"263392","description":"","caption":"","name":"picture30-5","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:26:01","modified":"2026-10-10 00:26:01","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":535,"height":240,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture30-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture30.png","medium-width":464,"medium-height":208,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture30.png","medium_large-width":535,"medium_large-height":240,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture30.png","large-width":535,"large-height":240,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture30.png","1536x1536-width":535,"1536x1536-height":240,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture30.png","2048x2048-width":535,"2048x2048-height":240,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture30.png","card_image-width":535,"card_image-height":240,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture30.png","wide_image-width":535,"wide_image-height":240}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>Seeing that construction of utility projects typically occur over a period of time, tracking each phase of work is vital to a utility organization. This type of data can be tracked in a dashboard for visibility across teams and key stakeholders. Because we are tracking progress over time, it is important to always keep the phase of the project updated. We are again asked to update the phase in the next step.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984631,"id":2984631,"title":"Picture31","filename":"Picture31.png","filesize":8997,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture31.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture31-14","alt":"","author":"263392","description":"","caption":"","name":"picture31-14","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:26:23","modified":"2026-10-10 00:26:23","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":60,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture31-213x60.png","thumbnail-width":213,"thumbnail-height":60,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture31.png","medium-width":464,"medium-height":36,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture31.png","medium_large-width":768,"medium_large-height":59,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture31.png","large-width":780,"large-height":60,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture31.png","1536x1536-width":780,"1536x1536-height":60,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture31.png","2048x2048-width":780,"2048x2048-height":60,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture31.png","card_image-width":780,"card_image-height":60,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture31.png","wide_image-width":780,"wide_image-height":60}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"image","image":{"ID":2984632,"id":2984632,"title":"Picture32","filename":"Picture32.png","filesize":19726,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture32.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture32-9","alt":"","author":"263392","description":"","caption":"","name":"picture32-9","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:26:33","modified":"2026-10-10 00:26:33","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":130,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture32-213x130.png","thumbnail-width":213,"thumbnail-height":130,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture32.png","medium-width":464,"medium-height":77,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture32.png","medium_large-width":768,"medium_large-height":128,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture32.png","large-width":780,"large-height":130,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture32.png","1536x1536-width":780,"1536x1536-height":130,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture32.png","2048x2048-width":780,"2048x2048-height":130,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture32.png","card_image-width":780,"card_image-height":130,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture32.png","wide_image-width":780,"wide_image-height":130}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>During construction of the new assets the team follows the design that was given to them. When installing new assets, sometimes the design vs. what is built changes. This could be due to an obstacle in the way such as a rock, tree, or ledge or it could be a property boundary or some other unforeseen thing on site. This is why the next step is critical.<\/p>\n<p>Once construction has been completed, which could take days to weeks or longer the workflow needs to proceed to the As-Built phase for the field work and verification process.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984633,"id":2984633,"title":"Picture33","filename":"Picture33.png","filesize":16043,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture33.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture33-6","alt":"","author":"263392","description":"","caption":"","name":"picture33-6","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:27:22","modified":"2026-10-10 00:27:22","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":133,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture33-213x133.png","thumbnail-width":213,"thumbnail-height":133,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture33.png","medium-width":464,"medium-height":79,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture33.png","medium_large-width":768,"medium_large-height":131,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture33.png","large-width":780,"large-height":133,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture33.png","1536x1536-width":780,"1536x1536-height":133,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture33.png","2048x2048-width":780,"2048x2048-height":133,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture33.png","card_image-width":780,"card_image-height":133,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture33.png","wide_image-width":780,"wide_image-height":133}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<h1 id=\"verification\"><\/h1>\n<h2><strong>Verification of built assets<\/strong><\/h2>\n"},{"acf_fc_layout":"image","image":{"ID":2984634,"id":2984634,"title":"Picture34","filename":"Picture34.png","filesize":19589,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture34.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture34-8","alt":"","author":"263392","description":"","caption":"","name":"picture34-8","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:29:04","modified":"2026-10-10 00:29:04","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":135,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture34-213x135.png","thumbnail-width":213,"thumbnail-height":135,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture34.png","medium-width":464,"medium-height":80,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture34.png","medium_large-width":768,"medium_large-height":133,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture34.png","large-width":780,"large-height":135,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture34.png","1536x1536-width":780,"1536x1536-height":135,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture34.png","2048x2048-width":780,"2048x2048-height":135,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture34.png","card_image-width":780,"card_image-height":135,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture34.png","wide_image-width":780,"wide_image-height":135}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>In this stage the workflow uses a child workflow diagram that will create an ArcGIS Field Maps task. While that task is being completed, the parent workflow is on hold, waiting for the child workflow to be completed.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984635,"id":2984635,"title":"Picture35","filename":"Picture35.png","filesize":10817,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture35.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture35-7","alt":"","author":"263392","description":"","caption":"","name":"picture35-7","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:29:21","modified":"2026-10-10 00:29:21","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":65,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture35-213x65.png","thumbnail-width":213,"thumbnail-height":65,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture35.png","medium-width":464,"medium-height":39,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture35.png","medium_large-width":768,"medium_large-height":64,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture35.png","large-width":780,"large-height":65,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture35.png","1536x1536-width":780,"1536x1536-height":65,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture35.png","2048x2048-width":780,"2048x2048-height":65,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture35.png","card_image-width":780,"card_image-height":65,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture35.png","wide_image-width":780,"wide_image-height":65}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>This is done inside the \u201cCreating new job for As-Built Survey\u201d step.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984636,"id":2984636,"title":"Picture36","filename":"Picture36.png","filesize":31869,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture36.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture36-8","alt":"","author":"263392","description":"","caption":"","name":"picture36-8","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:29:44","modified":"2026-10-10 00:29:44","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":158,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture36-213x158.png","thumbnail-width":213,"thumbnail-height":158,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture36.png","medium-width":464,"medium-height":94,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture36.png","medium_large-width":768,"medium_large-height":156,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture36.png","large-width":780,"large-height":158,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture36.png","1536x1536-width":780,"1536x1536-height":158,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture36.png","2048x2048-width":780,"2048x2048-height":158,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture36.png","card_image-width":780,"card_image-height":158,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture36.png","wide_image-width":780,"wide_image-height":158}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"image","image":{"ID":2984637,"id":2984637,"title":"Picture37","filename":"Picture37.png","filesize":25569,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture37.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture37-11","alt":"","author":"263392","description":"","caption":"","name":"picture37-11","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:30:47","modified":"2026-10-10 00:30:47","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":145,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture37-213x145.png","thumbnail-width":213,"thumbnail-height":145,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture37.png","medium-width":464,"medium-height":86,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture37.png","medium_large-width":768,"medium_large-height":143,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture37.png","large-width":780,"large-height":145,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture37.png","1536x1536-width":780,"1536x1536-height":145,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture37.png","2048x2048-width":780,"2048x2048-height":145,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture37.png","card_image-width":780,"card_image-height":145,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture37.png","wide_image-width":780,"wide_image-height":145}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"image","image":{"ID":2984638,"id":2984638,"title":"Picture38","filename":"Picture38.png","filesize":41628,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture38.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture38-11","alt":"","author":"263392","description":"","caption":"","name":"picture38-11","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:31:07","modified":"2026-10-10 00:31:07","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":395,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture38-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture38.png","medium-width":464,"medium-height":235,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture38.png","medium_large-width":768,"medium_large-height":389,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture38.png","large-width":780,"large-height":395,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture38.png","1536x1536-width":780,"1536x1536-height":395,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture38.png","2048x2048-width":780,"2048x2048-height":395,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture38.png","card_image-width":780,"card_image-height":395,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture38.png","wide_image-width":780,"wide_image-height":395}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"image","image":{"ID":2984639,"id":2984639,"title":"Picture39","filename":"Picture39.png","filesize":29126,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture39.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture39-11","alt":"","author":"263392","description":"","caption":"","name":"picture39-11","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:31:15","modified":"2026-10-10 00:31:15","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":160,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture39-213x160.png","thumbnail-width":213,"thumbnail-height":160,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture39.png","medium-width":464,"medium-height":95,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture39.png","medium_large-width":768,"medium_large-height":158,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture39.png","large-width":780,"large-height":160,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture39.png","1536x1536-width":780,"1536x1536-height":160,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture39.png","2048x2048-width":780,"2048x2048-height":160,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture39.png","card_image-width":780,"card_image-height":160,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture39.png","wide_image-width":780,"wide_image-height":160}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<h3><strong>Field Verification\u2013 Mobile Worker<\/strong><\/h3>\n<p>Once the new task has been created, the field worker can use ArcGIS Field Maps to access their list of tasks that need to be completed.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984640,"id":2984640,"title":"AsBuiltGIF-40","filename":"AsBuiltGIF-40.gif","filesize":49599969,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/AsBuiltGIF-40.gif","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/asbuiltgif-40","alt":"","author":"263392","description":"","caption":"","name":"asbuiltgif-40","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:33:55","modified":"2026-10-10 00:33:55","menu_order":0,"mime_type":"image\/gif","type":"image","subtype":"gif","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":1342,"height":778,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/AsBuiltGIF-40-213x200.gif","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/AsBuiltGIF-40.gif","medium-width":450,"medium-height":261,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/AsBuiltGIF-40.gif","medium_large-width":768,"medium_large-height":445,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/AsBuiltGIF-40.gif","large-width":1342,"large-height":778,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/AsBuiltGIF-40.gif","1536x1536-width":1342,"1536x1536-height":778,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/AsBuiltGIF-40.gif","2048x2048-width":1342,"2048x2048-height":778,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/AsBuiltGIF-40-802x465.gif","card_image-width":802,"card_image-height":465,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/AsBuiltGIF-40.gif","wide_image-width":1342,"wide_image-height":778}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p><span data-contrast=\"auto\">The field worker now can verify the design of the new meter installation with the as-built location where the construction team placed the new meter and service.\u00a0<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Using the app, the field worker has identified that the location of the as-built is different than the design and can indicate that on the map.\u00a0<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n"},{"acf_fc_layout":"content","content":"<p>Now that the as-built location has been identified as needing to be relocated, the field technician clicks Finish, and the task disappears from the list.<\/p>\n<p>The Verification workflow is dependent on the task status to change to Complete. Once that happened, the job will automatically close and the hold will be released on the parent job.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984642,"id":2984642,"title":"Picture41","filename":"Picture41.png","filesize":23226,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture41.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture41-4","alt":"","author":"263392","description":"","caption":"","name":"picture41-4","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:36:30","modified":"2026-10-10 00:36:30","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":170,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture41-213x170.png","thumbnail-width":213,"thumbnail-height":170,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture41.png","medium-width":464,"medium-height":101,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture41.png","medium_large-width":768,"medium_large-height":167,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture41.png","large-width":780,"large-height":170,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture41.png","1536x1536-width":780,"1536x1536-height":170,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture41.png","2048x2048-width":780,"2048x2048-height":170,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture41.png","card_image-width":780,"card_image-height":170,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture41.png","wide_image-width":780,"wide_image-height":170}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"image","image":{"ID":2984643,"id":2984643,"title":"Picture42","filename":"Picture42.png","filesize":28235,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture42.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture42-6","alt":"","author":"263392","description":"","caption":"","name":"picture42-6","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:37:47","modified":"2026-10-10 00:37:47","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":155,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture42-213x155.png","thumbnail-width":213,"thumbnail-height":155,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture42.png","medium-width":464,"medium-height":92,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture42.png","medium_large-width":768,"medium_large-height":153,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture42.png","large-width":780,"large-height":155,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture42.png","1536x1536-width":780,"1536x1536-height":155,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture42.png","2048x2048-width":780,"2048x2048-height":155,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture42.png","card_image-width":780,"card_image-height":155,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture42.png","wide_image-width":780,"wide_image-height":155}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<h1 id=\"qaqc\"><\/h1>\n<h2><strong>QAQC \u2013 GIS Analyst<\/strong><\/h2>\n<p>The final step before moving the new features into the GIS is to QAQC the edits and the field verification process.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984644,"id":2984644,"title":"Picture43","filename":"Picture43.png","filesize":7120,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture43.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture43-4","alt":"","author":"263392","description":"","caption":"","name":"picture43-4","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:38:35","modified":"2026-10-10 00:38:35","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":55,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture43-213x55.png","thumbnail-width":213,"thumbnail-height":55,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture43.png","medium-width":464,"medium-height":33,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture43.png","medium_large-width":768,"medium_large-height":54,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture43.png","large-width":780,"large-height":55,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture43.png","1536x1536-width":780,"1536x1536-height":55,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture43.png","2048x2048-width":780,"2048x2048-height":55,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture43.png","card_image-width":780,"card_image-height":55,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture43.png","wide_image-width":780,"wide_image-height":55}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>As part of the QAQC process, the GIS Analyst will open the next step in the process, which will provide the user with the Web Editor again. In order to view the new assets and complete the workflow we need to change the version from sde.DEFAULT back to the editing version.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984645,"id":2984645,"title":"Picture44","filename":"Picture44.png","filesize":131252,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture44.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture44-4","alt":"","author":"263392","description":"","caption":"","name":"picture44-4","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:38:59","modified":"2026-10-10 00:38:59","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":600,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture44-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture44.png","medium-width":339,"medium-height":261,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture44.png","medium_large-width":768,"medium_large-height":591,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture44.png","large-width":780,"large-height":600,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture44.png","1536x1536-width":780,"1536x1536-height":600,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture44.png","2048x2048-width":780,"2048x2048-height":600,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture44-605x465.png","card_image-width":605,"card_image-height":465,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture44.png","wide_image-width":780,"wide_image-height":600}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"image","image":{"ID":2984646,"id":2984646,"title":"Picture45","filename":"Picture45.png","filesize":136866,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture45.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture45-5","alt":"","author":"263392","description":"","caption":"","name":"picture45-5","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:39:27","modified":"2026-10-10 00:39:27","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":595,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture45-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture45.png","medium-width":342,"medium-height":261,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture45.png","medium_large-width":768,"medium_large-height":586,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture45.png","large-width":780,"large-height":595,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture45.png","1536x1536-width":780,"1536x1536-height":595,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture45.png","2048x2048-width":780,"2048x2048-height":595,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture45-610x465.png","card_image-width":610,"card_image-height":465,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture45.png","wide_image-width":780,"wide_image-height":595}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>First we need to update the attributes of the line and service meter and their location to add them to the network.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984647,"id":2984647,"title":"Picture46","filename":"Picture46.png","filesize":204810,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture46.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture46-4","alt":"","author":"263392","description":"","caption":"","name":"picture46-4","status":"inherit","uploaded_to":2984511,"date":"2026-10-10 00:39:57","modified":"2026-10-10 00:39:57","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":650,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture46-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture46.png","medium-width":313,"medium-height":261,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture46.png","medium_large-width":768,"medium_large-height":640,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture46.png","large-width":780,"large-height":650,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture46.png","1536x1536-width":780,"1536x1536-height":650,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture46.png","2048x2048-width":780,"2048x2048-height":650,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture46-558x465.png","card_image-width":558,"card_image-height":465,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture46.png","wide_image-width":780,"wide_image-height":650}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p><span data-contrast=\"auto\">Then, we need to move the assets to the location of the as-built verification.<\/span><\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984732,"id":2984732,"title":"Picture47a","filename":"Picture47a.png","filesize":114982,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47a.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture47a","alt":"","author":"263392","description":"","caption":"","name":"picture47a","status":"inherit","uploaded_to":2984511,"date":"2026-10-12 17:11:29","modified":"2026-10-12 17:11:29","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":460,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47a-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47a.png","medium-width":443,"medium-height":261,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47a.png","medium_large-width":768,"medium_large-height":453,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47a.png","large-width":780,"large-height":460,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47a.png","1536x1536-width":780,"1536x1536-height":460,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47a.png","2048x2048-width":780,"2048x2048-height":460,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47a.png","card_image-width":780,"card_image-height":460,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47a.png","wide_image-width":780,"wide_image-height":460}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p><span data-contrast=\"auto\">And validate our edits.\u00a0<\/span><\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984733,"id":2984733,"title":"Picture47b","filename":"Picture47b.png","filesize":136006,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47b.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture47b","alt":"","author":"263392","description":"","caption":"","name":"picture47b","status":"inherit","uploaded_to":2984511,"date":"2026-10-12 17:12:13","modified":"2026-10-12 17:12:13","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":465,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47b-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47b.png","medium-width":438,"medium-height":261,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47b.png","medium_large-width":768,"medium_large-height":458,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47b.png","large-width":780,"large-height":465,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47b.png","1536x1536-width":780,"1536x1536-height":465,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47b.png","2048x2048-width":780,"2048x2048-height":465,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47b.png","card_image-width":780,"card_image-height":465,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47b.png","wide_image-width":780,"wide_image-height":465}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"image","image":{"ID":2984735,"id":2984735,"title":"Picture47c","filename":"Picture47c.png","filesize":127159,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47c.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture47c","alt":"","author":"263392","description":"","caption":"","name":"picture47c","status":"inherit","uploaded_to":2984511,"date":"2026-10-12 17:13:03","modified":"2026-10-12 17:13:03","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":445,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47c-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47c.png","medium-width":457,"medium-height":261,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47c.png","medium_large-width":768,"medium_large-height":438,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47c.png","large-width":780,"large-height":445,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47c.png","1536x1536-width":780,"1536x1536-height":445,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47c.png","2048x2048-width":780,"2048x2048-height":445,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47c.png","card_image-width":780,"card_image-height":445,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture47c.png","wide_image-width":780,"wide_image-height":445}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>Finally, to check for connectivity we will run a network trace downstream from the transformer to ensure connectivity.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984727,"id":2984727,"title":"Picture49","filename":"Picture49.png","filesize":44759,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture49.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture49-7","alt":"","author":"263392","description":"","caption":"","name":"picture49-7","status":"inherit","uploaded_to":2984511,"date":"2026-10-12 16:57:27","modified":"2026-10-12 16:57:27","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":283,"height":945,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture49-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture49.png","medium-width":78,"medium-height":261,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture49.png","medium_large-width":283,"medium_large-height":945,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture49.png","large-width":283,"large-height":945,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture49.png","1536x1536-width":283,"1536x1536-height":945,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture49.png","2048x2048-width":283,"2048x2048-height":945,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture49-139x465.png","card_image-width":139,"card_image-height":465,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture49.png","wide_image-width":283,"wide_image-height":945}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"image","image":{"ID":2984725,"id":2984725,"title":"Picture50","filename":"Picture50.png","filesize":187087,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture50.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture50-5","alt":"","author":"263392","description":"","caption":"","name":"picture50-5","status":"inherit","uploaded_to":2984511,"date":"2026-10-12 16:57:03","modified":"2026-10-12 16:57:03","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":440,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture50-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture50.png","medium-width":464,"medium-height":261,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture50.png","medium_large-width":768,"medium_large-height":433,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture50.png","large-width":780,"large-height":440,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture50.png","1536x1536-width":780,"1536x1536-height":440,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture50.png","2048x2048-width":780,"2048x2048-height":440,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture50.png","card_image-width":780,"card_image-height":440,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture50.png","wide_image-width":780,"wide_image-height":440}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>Now that we have finished our QAQC we can click the Finish button for this step.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984723,"id":2984723,"title":"Picture51","filename":"Picture51.png","filesize":70421,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture51.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture51-7","alt":"","author":"263392","description":"","caption":"","name":"picture51-7","status":"inherit","uploaded_to":2984511,"date":"2026-10-12 16:56:25","modified":"2026-10-12 16:56:25","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":403,"height":1010,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture51-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture51.png","medium-width":104,"medium-height":261,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture51.png","medium_large-width":403,"medium_large-height":1010,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture51.png","large-width":403,"large-height":1010,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture51.png","1536x1536-width":403,"1536x1536-height":1010,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture51.png","2048x2048-width":403,"2048x2048-height":1010,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture51-186x465.png","card_image-width":186,"card_image-height":465,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture51.png","wide_image-width":403,"wide_image-height":1010}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>We verify that the as-built design and QAQC are done for this job.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984722,"id":2984722,"title":"Picture52","filename":"Picture52.png","filesize":29940,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture52.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture52-5","alt":"","author":"263392","description":"","caption":"","name":"picture52-5","status":"inherit","uploaded_to":2984511,"date":"2026-10-12 16:55:40","modified":"2026-10-12 16:55:40","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":225,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture52-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture52.png","medium-width":464,"medium-height":134,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture52.png","medium_large-width":768,"medium_large-height":222,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture52.png","large-width":780,"large-height":225,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture52.png","1536x1536-width":780,"1536x1536-height":225,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture52.png","2048x2048-width":780,"2048x2048-height":225,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture52.png","card_image-width":780,"card_image-height":225,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture52.png","wide_image-width":780,"wide_image-height":225}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>We change the phase to complete.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984721,"id":2984721,"title":"Picture53","filename":"Picture53.png","filesize":34391,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture53.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture53-4","alt":"","author":"263392","description":"","caption":"","name":"picture53-4","status":"inherit","uploaded_to":2984511,"date":"2026-10-12 16:55:15","modified":"2026-10-12 16:55:15","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":233,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture53-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture53.png","medium-width":464,"medium-height":139,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture53.png","medium_large-width":768,"medium_large-height":229,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture53.png","large-width":780,"large-height":233,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture53.png","1536x1536-width":780,"1536x1536-height":233,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture53.png","2048x2048-width":780,"2048x2048-height":233,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture53.png","card_image-width":780,"card_image-height":233,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture53.png","wide_image-width":780,"wide_image-height":233}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>Now, the job has been completed.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984720,"id":2984720,"title":"Picture54","filename":"Picture54.png","filesize":25374,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture54.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture54-4","alt":"","author":"263392","description":"","caption":"","name":"picture54-4","status":"inherit","uploaded_to":2984511,"date":"2026-10-12 16:53:58","modified":"2026-10-12 16:53:58","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":220,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture54-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture54.png","medium-width":464,"medium-height":131,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture54.png","medium_large-width":768,"medium_large-height":217,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture54.png","large-width":780,"large-height":220,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture54.png","1536x1536-width":780,"1536x1536-height":220,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture54.png","2048x2048-width":780,"2048x2048-height":220,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture54.png","card_image-width":780,"card_image-height":220,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture54.png","wide_image-width":780,"wide_image-height":220}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p>Click Dismiss job and it is removed from the list.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":2984718,"id":2984718,"title":"Picture55","filename":"Picture55.png","filesize":8304,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture55.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\/picture55-5","alt":"","author":"263392","description":"","caption":"","name":"picture55-5","status":"inherit","uploaded_to":2984511,"date":"2026-10-12 16:52:38","modified":"2026-10-12 16:52:38","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":780,"height":75,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture55-213x75.png","thumbnail-width":213,"thumbnail-height":75,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture55.png","medium-width":464,"medium-height":45,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture55.png","medium_large-width":768,"medium_large-height":74,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture55.png","large-width":780,"large-height":75,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture55.png","1536x1536-width":780,"1536x1536-height":75,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture55.png","2048x2048-width":780,"2048x2048-height":75,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture55.png","card_image-width":780,"card_image-height":75,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Picture55.png","wide_image-width":780,"wide_image-height":75}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<h1 id=\"wrapup\"><\/h1>\n<h2><strong>Wrap-Up<\/strong><\/h2>\n<p>This workflow demonstrates how <a href=\"https:\/\/www.esri.com\/en-us\/arcgis\/products\/arcgis-workflow-manager\/overview\" target=\"_blank\" rel=\"noopener\">ArcGIS Workflow Manager<\/a>, <a href=\"https:\/\/www.esri.com\/en-us\/arcgis\/products\/arcgis-web-editor\" target=\"_blank\" rel=\"noopener\">ArcGIS Web Editor<\/a>, and <a href=\"https:\/\/www.esri.com\/en-us\/arcgis\/products\/arcgis-field-maps\/overview\" target=\"_blank\" rel=\"noopener\">ArcGIS Field Maps<\/a>\u00a0can work together to support an electric utility as-built process from project kickoff through final QAQC. By tracking each phase of work, assigning responsibilities, attaching supporting documentation, and coordinating office and field activities, utilities gain better visibility into project status and can reduce the time it takes to move verified as-built information back into GIS.<\/p>\n<p>For the new meter installation example, the workflow connects the manager, engineer, mobile worker, and GIS analyst through a repeatable process. The project area is created, the design is completed in a versioned web editing environment, construction progress is tracked, field verification captures any difference between the design and what was built, and QAQC confirms the assets are ready to become part of the operational network. The result is a more accountable, transparent, and efficient process for maintaining accurate utility data.<\/p>\n<p>For more information on ArcGIS Workflow Manager, check out this <a href=\"https:\/\/www.esri.com\/arcgis-blog\/products\/workflow-manager\/data-management\/arcgis-workflow-manager-resources\" target=\"_blank\" rel=\"noopener\">resources<\/a> page.<\/p>\n"}],"related_articles":"","show_article_image":false,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2026\/10\/Designs-8.png","wide_image":false},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.9 (Yoast SEO v25.9) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>An Electric Utility As-Built Workflow with ArcGIS<\/title>\n<meta name=\"description\" content=\"Track an electric utility meter install from plan to field verification using Workflow Manager, Web Editor, and Field Maps Tasks.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"From Plan to Verification: An Electric Utility As-Built Workflow with ArcGIS\" \/>\n<meta property=\"og:description\" content=\"Track an electric utility meter install from plan to field verification using Workflow Manager, Web Editor, and Field Maps Tasks.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\" \/>\n<meta property=\"og:site_name\" content=\"ArcGIS Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/esrigis\/\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-13T22:48:33+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ESRI\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"22 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":[\"Article\",\"BlogPosting\"],\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\"},\"author\":{\"name\":\"Albert Schelin\",\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/#\/schema\/person\/2eaf9da342b5ff555e91ca273ebc381d\"},\"headline\":\"From Plan to Verification: An Electric Utility As-Built Workflow with ArcGIS\",\"datePublished\":\"2026-10-13T22:00:37+00:00\",\"dateModified\":\"2026-10-13T22:48:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\"},\"wordCount\":11,\"publisher\":{\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/#organization\"},\"keywords\":[\"editing\",\"field workflow\",\"utility network\"],\"articleSection\":[\"Electric &amp; Gas Utilities\",\"Field Operations\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\",\"url\":\"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\",\"name\":\"An Electric Utility As-Built Workflow with ArcGIS\",\"isPartOf\":{\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/#website\"},\"datePublished\":\"2026-10-13T22:00:37+00:00\",\"dateModified\":\"2026-10-13T22:48:33+00:00\",\"description\":\"Track an electric utility meter install from plan to field verification using Workflow Manager, Web Editor, and Field Maps Tasks.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.esri.com\/arcgis-blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"From Plan to Verification: An Electric Utility As-Built Workflow with ArcGIS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/#website\",\"url\":\"https:\/\/www.esri.com\/arcgis-blog\/\",\"name\":\"ArcGIS Blog\",\"description\":\"Get insider info from Esri product teams\",\"publisher\":{\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.esri.com\/arcgis-blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/#organization\",\"name\":\"Esri\",\"url\":\"https:\/\/www.esri.com\/arcgis-blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2018\/04\/Esri.png\",\"contentUrl\":\"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2018\/04\/Esri.png\",\"width\":400,\"height\":400,\"caption\":\"Esri\"},\"image\":{\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/esrigis\/\",\"https:\/\/x.com\/ESRI\",\"https:\/\/www.linkedin.com\/company\/5311\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/#\/schema\/person\/2eaf9da342b5ff555e91ca273ebc381d\",\"name\":\"Albert Schelin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2025\/02\/albert-schelin-3z7a7057-213x200.jpg\",\"contentUrl\":\"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2025\/02\/albert-schelin-3z7a7057-213x200.jpg\",\"caption\":\"Albert Schelin\"},\"description\":\"Albert is a Product Marketing Manager at Esri, promoting ArcGIS Web Editor and ArcGIS Data Pipelines. When he isn't promoting Esri's products, you can find him enjoying a cup of single origin light roast coffee at a local coffee shop.\",\"url\":\"https:\/\/www.esri.com\/arcgis-blog\/author\/aschelin\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"An Electric Utility As-Built Workflow with ArcGIS","description":"Track an electric utility meter install from plan to field verification using Workflow Manager, Web Editor, and Field Maps Tasks.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis","og_locale":"en_US","og_type":"article","og_title":"From Plan to Verification: An Electric Utility As-Built Workflow with ArcGIS","og_description":"Track an electric utility meter install from plan to field verification using Workflow Manager, Web Editor, and Field Maps Tasks.","og_url":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis","og_site_name":"ArcGIS Blog","article_publisher":"https:\/\/www.facebook.com\/esrigis\/","article_modified_time":"2026-10-13T22:48:33+00:00","twitter_card":"summary_large_image","twitter_site":"@ESRI","twitter_misc":{"Est. reading time":"22 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":["Article","BlogPosting"],"@id":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis#article","isPartOf":{"@id":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis"},"author":{"name":"Albert Schelin","@id":"https:\/\/www.esri.com\/arcgis-blog\/#\/schema\/person\/2eaf9da342b5ff555e91ca273ebc381d"},"headline":"From Plan to Verification: An Electric Utility As-Built Workflow with ArcGIS","datePublished":"2026-10-13T22:00:37+00:00","dateModified":"2026-10-13T22:48:33+00:00","mainEntityOfPage":{"@id":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis"},"wordCount":11,"publisher":{"@id":"https:\/\/www.esri.com\/arcgis-blog\/#organization"},"keywords":["editing","field workflow","utility network"],"articleSection":["Electric &amp; Gas Utilities","Field Operations"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis","url":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis","name":"An Electric Utility As-Built Workflow with ArcGIS","isPartOf":{"@id":"https:\/\/www.esri.com\/arcgis-blog\/#website"},"datePublished":"2026-10-13T22:00:37+00:00","dateModified":"2026-10-13T22:48:33+00:00","description":"Track an electric utility meter install from plan to field verification using Workflow Manager, Web Editor, and Field Maps Tasks.","breadcrumb":{"@id":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.esri.com\/arcgis-blog\/"},{"@type":"ListItem","position":2,"name":"From Plan to Verification: An Electric Utility As-Built Workflow with ArcGIS"}]},{"@type":"WebSite","@id":"https:\/\/www.esri.com\/arcgis-blog\/#website","url":"https:\/\/www.esri.com\/arcgis-blog\/","name":"ArcGIS Blog","description":"Get insider info from Esri product teams","publisher":{"@id":"https:\/\/www.esri.com\/arcgis-blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.esri.com\/arcgis-blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.esri.com\/arcgis-blog\/#organization","name":"Esri","url":"https:\/\/www.esri.com\/arcgis-blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esri.com\/arcgis-blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2018\/04\/Esri.png","contentUrl":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2018\/04\/Esri.png","width":400,"height":400,"caption":"Esri"},"image":{"@id":"https:\/\/www.esri.com\/arcgis-blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/esrigis\/","https:\/\/x.com\/ESRI","https:\/\/www.linkedin.com\/company\/5311\/"]},{"@type":"Person","@id":"https:\/\/www.esri.com\/arcgis-blog\/#\/schema\/person\/2eaf9da342b5ff555e91ca273ebc381d","name":"Albert Schelin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esri.com\/arcgis-blog\/#\/schema\/person\/image\/","url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2025\/02\/albert-schelin-3z7a7057-213x200.jpg","contentUrl":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2025\/02\/albert-schelin-3z7a7057-213x200.jpg","caption":"Albert Schelin"},"description":"Albert is a Product Marketing Manager at Esri, promoting ArcGIS Web Editor and ArcGIS Data Pipelines. When he isn't promoting Esri's products, you can find him enjoying a cup of single origin light roast coffee at a local coffee shop.","url":"https:\/\/www.esri.com\/arcgis-blog\/author\/aschelin"}]}},"text_date":"October 13, 2026","author_name":"Multiple Authors","author_page":"https:\/\/www.esri.com\/arcgis-blog\/products\/utility-network\/electric-gas\/from-plan-to-verification-an-electric-utility-as-built-workflow-with-arcgis","custom_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2025\/08\/Newsroom-Keyart-Wide-1920-x-1080.jpg","primary_product":"ArcGIS Utility Network","tag_data":[{"term_id":27971,"name":"editing","slug":"editing","term_group":0,"term_taxonomy_id":27971,"taxonomy":"post_tag","description":"","parent":0,"count":180,"filter":"raw"},{"term_id":757121,"name":"field workflow","slug":"field-workflow","term_group":0,"term_taxonomy_id":757121,"taxonomy":"post_tag","description":"","parent":0,"count":2,"filter":"raw"},{"term_id":35461,"name":"utility network","slug":"utility-network","term_group":0,"term_taxonomy_id":35461,"taxonomy":"post_tag","description":"","parent":0,"count":63,"filter":"raw"}],"category_data":[{"term_id":25741,"name":"Electric &amp; Gas Utilities","slug":"electric-gas","term_group":0,"term_taxonomy_id":25741,"taxonomy":"category","description":"","parent":0,"count":261,"filter":"raw"},{"term_id":23261,"name":"Field Operations","slug":"field-mobility","term_group":0,"term_taxonomy_id":23261,"taxonomy":"category","description":"","parent":0,"count":633,"filter":"raw"}],"product_data":[{"term_id":679821,"name":"ArcGIS Field Maps","slug":"field-maps","term_group":0,"term_taxonomy_id":679821,"taxonomy":"product","description":"","parent":36591,"count":167,"filter":"raw"},{"term_id":515312,"name":"ArcGIS Utility Network","slug":"utility-network","term_group":0,"term_taxonomy_id":515312,"taxonomy":"product","description":"","parent":36981,"count":152,"filter":"raw"},{"term_id":774772,"name":"ArcGIS Web Editor","slug":"web-editor","term_group":0,"term_taxonomy_id":774772,"taxonomy":"product","description":"","parent":36591,"count":32,"filter":"raw"},{"term_id":760392,"name":"ArcGIS Workflow Manager","slug":"workflow-manager","term_group":0,"term_taxonomy_id":760392,"taxonomy":"product","description":"","parent":36981,"count":42,"filter":"raw"}],"primary_product_link":"https:\/\/www.esri.com\/arcgis-blog\/?s=#&products=utility-network","_links":{"self":[{"href":"https:\/\/www.esri.com\/arcgis-blog\/wp-json\/wp\/v2\/blog\/2984511","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esri.com\/arcgis-blog\/wp-json\/wp\/v2\/blog"}],"about":[{"href":"https:\/\/www.esri.com\/arcgis-blog\/wp-json\/wp\/v2\/types\/blog"}],"author":[{"embeddable":true,"href":"https:\/\/www.esri.com\/arcgis-blog\/wp-json\/wp\/v2\/users\/263392"}],"replies":[{"embeddable":true,"href":"https:\/\/www.esri.com\/arcgis-blog\/wp-json\/wp\/v2\/comments?post=2984511"}],"version-history":[{"count":23,"href":"https:\/\/www.esri.com\/arcgis-blog\/wp-json\/wp\/v2\/blog\/2984511\/revisions"}],"predecessor-version":[{"id":2984910,"href":"https:\/\/www.esri.com\/arcgis-blog\/wp-json\/wp\/v2\/blog\/2984511\/revisions\/2984910"}],"wp:attachment":[{"href":"https:\/\/www.esri.com\/arcgis-blog\/wp-json\/wp\/v2\/media?parent=2984511"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.esri.com\/arcgis-blog\/wp-json\/wp\/v2\/categories?post=2984511"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.esri.com\/arcgis-blog\/wp-json\/wp\/v2\/tags?post=2984511"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/www.esri.com\/arcgis-blog\/wp-json\/wp\/v2\/industry?post=2984511"},{"taxonomy":"product","embeddable":true,"href":"https:\/\/www.esri.com\/arcgis-blog\/wp-json\/wp\/v2\/product?post=2984511"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}