{"id":895721,"date":"2020-06-25T09:40:54","date_gmt":"2020-06-25T16:40:54","guid":{"rendered":"https:\/\/www.esri.com\/arcgis-blog\/?post_type=blog&#038;p=895721"},"modified":"2020-06-25T09:40:54","modified_gmt":"2020-06-25T16:40:54","slug":"utility-and-telecom-emergency-management","status":"publish","type":"blog","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management","title":{"rendered":"Utility and Telecom Emergency Management"},"author":25891,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","format":"standard","meta":{"_acf_changed":false,"_searchwp_excluded":""},"categories":[37511],"tags":[565442,687851,27121,23081,37771],"industry":[],"product":[421922,36641,36671,37381,36811,36581,36681,36551,36561,408802,380802,36691,350952,515312,36631,36701],"class_list":["post-895721","blog","type-blog","status-publish","format-standard","hentry","category-sharing-collaboration","tag-arcgis-utility-network","tag-crisis","tag-emergency-management","tag-utilities","tag-water","product-arcgis","product-collector","product-ops-dashboard","product-ext-server-geoevent","product-arcgis-hub","product-arcgis-living-atlas","product-navigator","product-arcgis-online","product-arcgis-pro","product-quickcapture","product-arcgis-storymaps","product-survey123","product-tracker","product-utility-network","product-web-appbuilder","product-workforce"],"acf":{"short_description":"During May, Esri presented a three-part webinar series on Emergency Management. It explored the three stages of emergency management.","flexible_content":[{"acf_fc_layout":"content","content":"<h1 style=\"text-align: center\">Prepare Strategically &#8211; Respond Rapidly &#8211; Recover Methodically<\/h1>\n<p>During May, Esri presented a three-part webinar series on Emergency Management. It explored its three stages: prepare, respond, and recover. It details how GIS plays a pivotal role.<\/p>\n<p>Regardless of the type of event, location is critical. It answers these questions:<\/p>\n<ul>\n<li>Where are there external factors at play?<\/li>\n<li>Where Is the network most vulnerable?<\/li>\n<li>Where to stage crews?<\/li>\n<li>Where to prioritize the recovery?<\/li>\n<\/ul>\n<p>Also layered on top of the emergency, utilities and telecoms must cope with the impacts of the coronavirus disease (COVID-19). It helps to identify where there are:<\/p>\n<ul>\n<li>Vulnerable populations<\/li>\n<li>Makeshift health care facilities<\/li>\n<li>Communities more susceptible to COVID-19<\/li>\n<li>The impacts of the pandemic most severely felt<\/li>\n<li>Clusters of cases<\/li>\n<li>Facilities being used as COVID-19 testing centers or shelters<\/li>\n<\/ul>\n<p>That is why GIS is so valuable.<\/p>\n<h2><strong>Prepare Strategically<\/strong><\/h2>\n<p>The first webinar reveals how GIS solidifies planning in three ways.<\/p>\n<h3>External impacts<\/h3>\n<p>The team demonstrates how GIS provides web services about potential danger areas. Examples include fire-prone areas, high wind areas, landslide areas, and flood-prone areas. These are available from <a href=\"https:\/\/livingatlas.arcgis.com\/en\/home\/\">ArcGIS Living Atlas of the World<\/a>. Others can come from partners such as weather services and government web services.<\/p>\n<h3>Network vulnerability<\/h3>\n<p>No network is perfect. Understanding vulnerable assets is essential for planning. ArcGIS identifies impacts in the network. It does this by intersecting assets with datasets such as floodplains, ground shaking grids, or COVID-19 social vulnerability areas. The ability to analyze specific hazard scenarios such as the 1% annual chance floodplain or a potential earthquake liquefaction predicts where failure may occur during an event. This prioritizes planning decisions. The demo creates a compelling case for how weakness such as corroded piping can have devasting impacts during an earthquake. Coupled with potential liquefaction, this GIS analysis predicts the \u201cperfect storm\u201d for extreme damage and asset failure.<\/p>\n<h3>Crafting the plan<\/h3>\n<p>External factors and network vulnerability provide the science for planners to craft scenarios. They help them stage crews and material. The time to build these data feeds and perform the scenarios must occur well in advance of any event. The team demonstrates several scenarios.<\/p>\n<p>To view the first webinar on how best to prepare for an emergency, click <a href=\"https:\/\/www.youtube.com\/watch?v=KauI_9l9hM4&amp;list=PLdVnJnpRENTlnO8xK4BL1ODSP6wcYKDkN&amp;index=4&amp;t=760s\">here<\/a>.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":897411,"id":897411,"title":"Screenshot (41)","filename":"Screenshot-41.png","filesize":190983,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-41.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management\/screenshot-41","alt":"","author":"25891","description":"","caption":"","name":"screenshot-41","status":"inherit","uploaded_to":895721,"date":"2020-06-23 14:30:15","modified":"2020-06-23 14:30:15","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":1279,"height":631,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-41-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-41.png","medium-width":464,"medium-height":229,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-41.png","medium_large-width":768,"medium_large-height":379,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-41.png","large-width":1279,"large-height":631,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-41.png","1536x1536-width":1279,"1536x1536-height":631,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-41.png","2048x2048-width":1279,"2048x2048-height":631,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-41-826x408.png","card_image-width":826,"card_image-height":408,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-41.png","wide_image-width":1279,"wide_image-height":631}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p style=\"text-align: center\"><em>Analysis Illustrating the Potential Impact of Liquefaction on Corroded Water Mains Should an Earthquake Occur<\/em><\/p>\n"},{"acf_fc_layout":"image","image":{"ID":897531,"id":897531,"title":"Screenshot (44)","filename":"Screenshot-44.png","filesize":443160,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-44.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management\/screenshot-44","alt":"","author":"25891","description":"","caption":"","name":"screenshot-44","status":"inherit","uploaded_to":895721,"date":"2020-06-23 14:45:16","modified":"2020-06-23 14:45:16","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":1266,"height":665,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-44-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-44.png","medium-width":464,"medium-height":244,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-44.png","medium_large-width":768,"medium_large-height":403,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-44.png","large-width":1266,"large-height":665,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-44.png","1536x1536-width":1266,"1536x1536-height":665,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-44.png","2048x2048-width":1266,"2048x2048-height":665,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-44-826x434.png","card_image-width":826,"card_image-height":434,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-44.png","wide_image-width":1266,"wide_image-height":665}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p style=\"text-align: center\"><em>Creating the Emergency Plan &#8211; Dashboard Showing Fire-Prone Area that Intersects with the Electric Network and Critical Customers<\/em><\/p>\n"},{"acf_fc_layout":"content","content":"<h2><strong>Respond Rapidly<\/strong><\/h2>\n<p>The storm is here. The earth is shaking. Fires are burning, or the wind is still blowing. There is no time for building data feeds or applications. Responding rapidly is the subject of the second webinar.<\/p>\n<p>During this stage there are three steps:<\/p>\n<h3>Damage assessment<\/h3>\n<p>The team shows how <a href=\"https:\/\/www.esri.com\/en-us\/arcgis\/products\/field-operations\/overview\">field operations<\/a> applications can collect data rapidly, short-circuiting the manual processes. They demonstrate how the use of <a href=\"https:\/\/www.esri.com\/en-us\/arcgis\/products\/arcgis-quickcapture\/overview\">ArcGIS QuickCapture<\/a> allows untrained or mutual aid crews unfamiliar with the region to rapidly assess the damage.<\/p>\n<h3>Situational awareness<\/h3>\n<p><a href=\"https:\/\/www.esri.com\/en-us\/arcgis\/products\/arcgis-dashboards\/overview#:~:text=ArcGIS%20Dashboards%20enables%20users%20to,visualizations%20on%20a%20single%20screen.&amp;text=Dashboards%20are%20essential%20information%20products,component%20to%20your%20geospatial%20infrastructure.\">ArcGIS Dashboards<\/a> provides the perfect way to communicate what\u2019s happening right now. This includes showing clusters of damage. During the demo, we illustrate how planners can prioritize critical facilities, like pump stations for priority restoration. We also highlight real-time weather feeds and their relationship to the network.<\/p>\n<p>We also examine how workflows can still be managed in an off-line mode when mobile communications might be compromised.<\/p>\n<h3>Public outreach<\/h3>\n<p>The team\u2019s demonstration illustrates the power of ArcGIS to create an automated routine for public outreach by disseminating the right information to all parties impacting by the event.<\/p>\n<p>The team also demonstrates tools provided by the <a href=\"https:\/\/solutions.arcgis.com\/shared\/help\/coronavirus-business-continuity\/\">Coronavirus Business Continuity<\/a> solution. This allows staff to check-in regarding their health status. They can report when they have come into close contact with someone (like a citizen or a customer). <a href=\"https:\/\/www.esri.com\/en-us\/arcgis\/products\/tracker-for-arcgis\/overview\">Tracker for ArcGIS<\/a> and ArcGIS Dashboards can identify potential \u2018person to person\u2019 and \u2018person to asset\u2019 contact. Analysis can be performed on Tracker for ArcGIS with the ArcGIS Pro <a href=\"https:\/\/www.arcgis.com\/home\/item.html?id=0f66b5e5862546af86fa53eae4f12090\">Proximity Tracing Tool<\/a> to see where these contacts have occurred.<\/p>\n<p>To view the second webinar on how best to respond to an emergency, click <a href=\"https:\/\/www.youtube.com\/watch?v=82tC6q550xg&amp;list=PLdVnJnpRENTlnO8xK4BL1ODSP6wcYKDkN&amp;index=3&amp;t=1336s\">here<\/a>.<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":895811,"id":895811,"title":"Screenshot (35)","filename":"Screenshot-35.png","filesize":89565,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-35.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management\/screenshot-35","alt":"","author":"25891","description":"","caption":"","name":"screenshot-35","status":"inherit","uploaded_to":895721,"date":"2020-06-22 19:04:48","modified":"2020-06-22 19:04:48","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":710,"height":491,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-35-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-35.png","medium-width":377,"medium-height":261,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-35.png","medium_large-width":710,"medium_large-height":491,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-35.png","large-width":710,"large-height":491,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-35.png","1536x1536-width":710,"1536x1536-height":491,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-35.png","2048x2048-width":710,"2048x2048-height":491,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-35-672x465.png","card_image-width":672,"card_image-height":465,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-35.png","wide_image-width":710,"wide_image-height":491}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p style=\"text-align: center\"><em>ArcGIS QuickCapture Simplifies Damage Assessment<\/em><\/p>\n"},{"acf_fc_layout":"image","image":{"ID":898001,"id":898001,"title":"Screenshot (47)","filename":"Screenshot-47.png","filesize":357207,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-47.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management\/screenshot-47","alt":"","author":"25891","description":"","caption":"","name":"screenshot-47","status":"inherit","uploaded_to":895721,"date":"2020-06-23 15:57:30","modified":"2020-06-23 15:57:30","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":1270,"height":717,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-47-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-47.png","medium-width":462,"medium-height":261,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-47.png","medium_large-width":768,"medium_large-height":434,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-47.png","large-width":1270,"large-height":717,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-47.png","1536x1536-width":1270,"1536x1536-height":717,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-47.png","2048x2048-width":1270,"2048x2048-height":717,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-47-824x465.png","card_image-width":824,"card_image-height":465,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-47.png","wide_image-width":1270,"wide_image-height":717}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p style=\"text-align: center\"><em>Public Outreach Dashboard &#8211; Shows Emergency Evacuation Routes and Critical Facilities<\/em><\/p>\n"},{"acf_fc_layout":"content","content":"<h2><strong>Recover Methodically<\/strong><\/h2>\n<p>The third stage of emergency management is recover. This is the long and arduous process of putting the network back together. We were very fortunate to have a compelling video from Nashville Electric Service. It describes a devastating tornado that struck the region. It illustrates how GIS provided the means of quickly managing the recovery.<\/p>\n<p>GIS supports recovery in three ways:<\/p>\n<h3>Priority Analysis<\/h3>\n<p>Damage capture is complete. Now the job is to dispatch crews and deal with critical facilities. The next step is to order the recovery process. Using <a href=\"https:\/\/storymaps.arcgis.com\/\">ArcGIS StoryMaps<\/a> we demonstrate the logistics of recovery. Given that streets may be impassible, drive time analysis provides the best path for ordering recovery. This demo addresses optimal staging areas, crew sequencing, and routing.<\/p>\n<h3>Workforce Execution<\/h3>\n<p>This can be a logistical nightmare. Utilities and telecoms must make choices. Choices include which areas are more important than others to work on. The team demonstrates how <a href=\"https:\/\/www.esri.com\/en-us\/arcgis\/products\/workforce\/overview\">Workforce for ArcGIS<\/a> and ArcGIS Dashboards assigns and monitors the work. <a href=\"https:\/\/www.esri.com\/en-us\/arcgis\/products\/collector-for-arcgis\/overview\">Collector for ArcGIS<\/a> provides data back to the dispatcher.<\/p>\n<h3>Recovery communication<\/h3>\n<p>People are restless. Lights are out. Water and gas aren\u2019t flowing. Communication is limited. Businesses are shuttered. Roads and bridges are out. The team demonstrates how recovery communication is essential during extended periods of an outage. Using <a href=\"https:\/\/www.esri.com\/en-us\/arcgis\/products\/arcgis-hub\/overview\">ArcGIS Hub<\/a> the team highlights the steady progress of the recovery effort. Utilities and telecoms can communicate that progress to the public, the media, and to first responders using simple web maps.<\/p>\n<p>To view the third webinar on how best to recover from an emergency, click <a href=\"https:\/\/www.youtube.com\/watch?v=eLP8HUUJNWQ&amp;list=PLdVnJnpRENTlnO8xK4BL1ODSP6wcYKDkN&amp;index=1\">here.<\/a><\/p>\n<p>&nbsp;<\/p>\n"},{"acf_fc_layout":"image","image":{"ID":898091,"id":898091,"title":"Screenshot (51)","filename":"Screenshot-51.png","filesize":213948,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-51.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management\/screenshot-51","alt":"","author":"25891","description":"","caption":"","name":"screenshot-51","status":"inherit","uploaded_to":895721,"date":"2020-06-23 16:20:47","modified":"2020-06-23 16:20:47","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":1282,"height":714,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-51-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-51.png","medium-width":464,"medium-height":258,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-51.png","medium_large-width":768,"medium_large-height":428,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-51.png","large-width":1282,"large-height":714,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-51.png","1536x1536-width":1282,"1536x1536-height":714,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-51.png","2048x2048-width":1282,"2048x2048-height":714,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-51-826x460.png","card_image-width":826,"card_image-height":460,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Screenshot-51.png","wide_image-width":1282,"wide_image-height":714}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p style=\"text-align: center\"><em>Drive Time Analysis Used to Optimize Recovery Activities To Critical Customers\u00a0<\/em><\/p>\n"},{"acf_fc_layout":"image","image":{"ID":898101,"id":898101,"title":"Workforce (2)","filename":"Workforce-2.png","filesize":34352,"url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Workforce-2.png","link":"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management\/workforce-2-2","alt":"","author":"25891","description":"","caption":"","name":"workforce-2-2","status":"inherit","uploaded_to":895721,"date":"2020-06-23 16:22:19","modified":"2020-06-23 16:22:19","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/www.esri.com\/arcgis-blog\/wp-includes\/images\/media\/default.png","width":467,"height":677,"sizes":{"thumbnail":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Workforce-2-213x200.png","thumbnail-width":213,"thumbnail-height":200,"medium":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Workforce-2.png","medium-width":180,"medium-height":261,"medium_large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Workforce-2.png","medium_large-width":467,"medium_large-height":677,"large":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Workforce-2.png","large-width":467,"large-height":677,"1536x1536":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Workforce-2.png","1536x1536-width":467,"1536x1536-height":677,"2048x2048":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Workforce-2.png","2048x2048-width":467,"2048x2048-height":677,"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Workforce-2-321x465.png","card_image-width":321,"card_image-height":465,"wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/06\/Workforce-2.png","wide_image-width":467,"wide_image-height":677}},"image_position":"center","orientation":"horizontal","hyperlink":""},{"acf_fc_layout":"content","content":"<p style=\"text-align: center\"><em>Workforce for ArcGIS Used on a Tablet to Manage the Installation of an Emergency Generator to a COVID-19 Facility<\/em><\/p>\n"},{"acf_fc_layout":"content","content":"<p>The Webinar covers the three stages of emergency management \u2013 prepare strategically, respond rapidly, and recover methodically \u2013 all enhanced by the capabilities of ArcGIS.<\/p>\n<p>To learn more about how ArcGIS improves utility and telecom operations, click <a href=\"https:\/\/www.esri.com\/en-us\/industries\/utilities\">here<\/a>.<\/p>\n"}],"authors":[{"ID":25891,"user_firstname":"Bill","user_lastname":"Meehan","nickname":"bmeehan","user_nicename":"bmeehan","display_name":"Bill Meehan","user_email":"bmeehan@esri.com","user_url":"","user_registered":"2020-04-14 16:27:05","user_description":"Author of four books: GIS for Enhanced Electric Utility Performance, Modeling Electric Distribution with GIS, Empowering Electric and Gas Utilities with GIS and Power System Analysis by Digital Computer, he is a sought-after speaker and thought leader. His blogs have been widely read. He has lectured extensively and taught courses at Northeastern University and the University of Massachusetts. Bill holds a B.S. in Electrical Engineering from Northeastern University and an M.S. in Electric Power Engineering from Rensselaer Polytechnic Institute. Prior to joining Esri, Bill was the vice president of electric operations for a major electric and gas utility. Bill is a registered engineer in the Commonwealth of Massachusetts. He currently is the Director of Electric Utility Solutions at Esri, the world's largest GIS company.","user_avatar":"<img data-del=\"avatar\" src='https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/04\/G61001_BillMeehanheashot-213x200.jpg' class='avatar pp-user-avatar avatar-96 photo ' height='96' width='96'\/>"}],"related_articles":[{"ID":551592,"post_author":"8122","post_date":"2025-06-30 03:07:49","post_date_gmt":"2025-06-30 10:07:49","post_content":"","post_title":"Get started with ArcGIS Hub","post_excerpt":"","post_status":"publish","comment_status":"closed","ping_status":"closed","post_password":"","post_name":"launch-a-website-in-five-steps","to_ping":"","pinged":"","post_modified":"2026-01-21 07:28:44","post_modified_gmt":"2026-01-21 15:28:44","post_content_filtered":"","post_parent":0,"guid":"https:\/\/www.esri.com\/arcgis-blog\/?post_type=blog&#038;p=551592","menu_order":0,"post_type":"blog","post_mime_type":"","comment_count":"0","filter":"raw"},{"ID":838291,"post_author":"25891","post_date":"2020-04-27 15:09:40","post_date_gmt":"2020-04-27 22:09:40","post_content":"","post_title":"GIS at the Heart of Utility and Telecom Emergency Management","post_excerpt":"","post_status":"publish","comment_status":"open","ping_status":"closed","post_password":"","post_name":"gis-at-the-heart-of-utility-and-telecom-emergency-management","to_ping":"","pinged":"","post_modified":"2021-04-18 23:07:09","post_modified_gmt":"2021-04-19 06:07:09","post_content_filtered":"","post_parent":0,"guid":"https:\/\/www.esri.com\/arcgis-blog\/?post_type=blog&#038;p=838291","menu_order":0,"post_type":"blog","post_mime_type":"","comment_count":"0","filter":"raw"},{"ID":75021,"post_author":"5591","post_date":"2017-01-18 10:03:56","post_date_gmt":"2017-01-18 10:03:56","post_content":"","post_title":"What's new in ArcGIS for Emergency Management","post_excerpt":"","post_status":"publish","comment_status":"open","ping_status":"closed","post_password":"","post_name":"whats-new-in-arcgis-for-emergency-management","to_ping":"","pinged":"","post_modified":"2018-04-11 22:17:39","post_modified_gmt":"2018-04-11 22:17:39","post_content_filtered":"","post_parent":0,"guid":"http:\/\/www.esri.com\/arcgis-blog\/products\/product\/uncategorized\/whats-new-in-arcgis-for-emergency-management\/","menu_order":0,"post_type":"blog","post_mime_type":"","comment_count":"0","filter":"raw"},{"ID":810611,"post_author":"8712","post_date":"2020-04-24 16:55:16","post_date_gmt":"2020-04-24 23:55:16","post_content":"","post_title":"A taste of ArcGIS QuickCapture through sample projects","post_excerpt":"","post_status":"publish","comment_status":"open","ping_status":"closed","post_password":"","post_name":"getting-started-with-arcgis-quickcapture-sample-projects","to_ping":"","pinged":"","post_modified":"2020-05-06 10:08:55","post_modified_gmt":"2020-05-06 17:08:55","post_content_filtered":"","post_parent":0,"guid":"https:\/\/www.esri.com\/arcgis-blog\/?post_type=blog&#038;p=810611","menu_order":0,"post_type":"blog","post_mime_type":"","comment_count":"0","filter":"raw"},{"ID":786451,"post_author":"4661","post_date":"2020-04-01 08:25:36","post_date_gmt":"2020-04-01 15:25:36","post_content":"","post_title":"Coronavirus Business Continuity Solution Released","post_excerpt":"","post_status":"publish","comment_status":"open","ping_status":"closed","post_password":"","post_name":"coronavirus-business-continuity-solution-released","to_ping":"","pinged":"","post_modified":"2020-04-07 11:42:55","post_modified_gmt":"2020-04-07 18:42:55","post_content_filtered":"","post_parent":0,"guid":"https:\/\/www.esri.com\/arcgis-blog\/?post_type=blog&#038;p=786451","menu_order":0,"post_type":"blog","post_mime_type":"","comment_count":"0","filter":"raw"}],"card_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/04\/Emergency-Management-Twitter-final-1.jpg","wide_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2018\/05\/Electric-Utility-Damage-Assessment-GettyImages-157509718-1920x1080-75-quality.jpg"},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.9 (Yoast SEO v25.9) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Utility and Telecom Emergency Management GIS for Emergency Management<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Utility and Telecom Emergency Management\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management\" \/>\n<meta property=\"og:site_name\" content=\"ArcGIS Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/esrigis\/\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@ESRI\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":[\"Article\",\"BlogPosting\"],\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management\"},\"author\":{\"name\":\"Bill Meehan\",\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/#\/schema\/person\/240c7850bd7752f5e5d7f984e26dff39\"},\"headline\":\"Utility and Telecom Emergency Management\",\"datePublished\":\"2020-06-25T16:40:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management\"},\"wordCount\":5,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/#organization\"},\"keywords\":[\"ArcGIS Utility Network\",\"crisis\",\"Emergency Management\",\"Utilities\",\"Water\"],\"articleSection\":[\"Sharing and Collaboration\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management\",\"url\":\"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management\",\"name\":\"Utility and Telecom Emergency Management GIS for Emergency Management\",\"isPartOf\":{\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/#website\"},\"datePublished\":\"2020-06-25T16:40:54+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.esri.com\/arcgis-blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Utility and Telecom Emergency Management\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/#website\",\"url\":\"https:\/\/www.esri.com\/arcgis-blog\/\",\"name\":\"ArcGIS Blog\",\"description\":\"Get insider info from Esri product teams\",\"publisher\":{\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.esri.com\/arcgis-blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/#organization\",\"name\":\"Esri\",\"url\":\"https:\/\/www.esri.com\/arcgis-blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2018\/04\/Esri.png\",\"contentUrl\":\"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2018\/04\/Esri.png\",\"width\":400,\"height\":400,\"caption\":\"Esri\"},\"image\":{\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/esrigis\/\",\"https:\/\/x.com\/ESRI\",\"https:\/\/www.linkedin.com\/company\/5311\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/#\/schema\/person\/240c7850bd7752f5e5d7f984e26dff39\",\"name\":\"Bill Meehan\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.esri.com\/arcgis-blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/04\/G61001_BillMeehanheashot-213x200.jpg\",\"contentUrl\":\"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/04\/G61001_BillMeehanheashot-213x200.jpg\",\"caption\":\"Bill Meehan\"},\"description\":\"Author of four books: GIS for Enhanced Electric Utility Performance, Modeling Electric Distribution with GIS, Empowering Electric and Gas Utilities with GIS and Power System Analysis by Digital Computer, he is a sought-after speaker and thought leader. His blogs have been widely read. He has lectured extensively and taught courses at Northeastern University and the University of Massachusetts. Bill holds a B.S. in Electrical Engineering from Northeastern University and an M.S. in Electric Power Engineering from Rensselaer Polytechnic Institute. Prior to joining Esri, Bill was the vice president of electric operations for a major electric and gas utility. Bill is a registered engineer in the Commonwealth of Massachusetts. He currently is the Director of Electric Utility Solutions at Esri, the world's largest GIS company.\",\"sameAs\":[\"https:\/\/www.linkedin.com\/in\/bimeehan\/\",\"https:\/\/x.com\/Bill_Meehan\"],\"url\":\"https:\/\/www.esri.com\/arcgis-blog\/author\/bmeehan\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Utility and Telecom Emergency Management GIS for Emergency Management","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management","og_locale":"en_US","og_type":"article","og_title":"Utility and Telecom Emergency Management","og_url":"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management","og_site_name":"ArcGIS Blog","article_publisher":"https:\/\/www.facebook.com\/esrigis\/","twitter_card":"summary_large_image","twitter_site":"@ESRI","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":["Article","BlogPosting"],"@id":"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management#article","isPartOf":{"@id":"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management"},"author":{"name":"Bill Meehan","@id":"https:\/\/www.esri.com\/arcgis-blog\/#\/schema\/person\/240c7850bd7752f5e5d7f984e26dff39"},"headline":"Utility and Telecom Emergency Management","datePublished":"2020-06-25T16:40:54+00:00","mainEntityOfPage":{"@id":"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management"},"wordCount":5,"commentCount":0,"publisher":{"@id":"https:\/\/www.esri.com\/arcgis-blog\/#organization"},"keywords":["ArcGIS Utility Network","crisis","Emergency Management","Utilities","Water"],"articleSection":["Sharing and Collaboration"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management","url":"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management","name":"Utility and Telecom Emergency Management GIS for Emergency Management","isPartOf":{"@id":"https:\/\/www.esri.com\/arcgis-blog\/#website"},"datePublished":"2020-06-25T16:40:54+00:00","breadcrumb":{"@id":"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.esri.com\/arcgis-blog\/products\/arcgis\/sharing-collaboration\/utility-and-telecom-emergency-management#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.esri.com\/arcgis-blog\/"},{"@type":"ListItem","position":2,"name":"Utility and Telecom Emergency Management"}]},{"@type":"WebSite","@id":"https:\/\/www.esri.com\/arcgis-blog\/#website","url":"https:\/\/www.esri.com\/arcgis-blog\/","name":"ArcGIS Blog","description":"Get insider info from Esri product teams","publisher":{"@id":"https:\/\/www.esri.com\/arcgis-blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.esri.com\/arcgis-blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.esri.com\/arcgis-blog\/#organization","name":"Esri","url":"https:\/\/www.esri.com\/arcgis-blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esri.com\/arcgis-blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2018\/04\/Esri.png","contentUrl":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2018\/04\/Esri.png","width":400,"height":400,"caption":"Esri"},"image":{"@id":"https:\/\/www.esri.com\/arcgis-blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/esrigis\/","https:\/\/x.com\/ESRI","https:\/\/www.linkedin.com\/company\/5311\/"]},{"@type":"Person","@id":"https:\/\/www.esri.com\/arcgis-blog\/#\/schema\/person\/240c7850bd7752f5e5d7f984e26dff39","name":"Bill Meehan","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esri.com\/arcgis-blog\/#\/schema\/person\/image\/","url":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/04\/G61001_BillMeehanheashot-213x200.jpg","contentUrl":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2020\/04\/G61001_BillMeehanheashot-213x200.jpg","caption":"Bill Meehan"},"description":"Author of four books: GIS for Enhanced Electric Utility Performance, Modeling Electric Distribution with GIS, Empowering Electric and Gas Utilities with GIS and Power System Analysis by Digital Computer, he is a sought-after speaker and thought leader. His blogs have been widely read. He has lectured extensively and taught courses at Northeastern University and the University of Massachusetts. Bill holds a B.S. in Electrical Engineering from Northeastern University and an M.S. in Electric Power Engineering from Rensselaer Polytechnic Institute. Prior to joining Esri, Bill was the vice president of electric operations for a major electric and gas utility. Bill is a registered engineer in the Commonwealth of Massachusetts. He currently is the Director of Electric Utility Solutions at Esri, the world's largest GIS company.","sameAs":["https:\/\/www.linkedin.com\/in\/bimeehan\/","https:\/\/x.com\/Bill_Meehan"],"url":"https:\/\/www.esri.com\/arcgis-blog\/author\/bmeehan"}]}},"text_date":"June 25, 2020","author_name":"Bill Meehan","author_page":"https:\/\/www.esri.com\/arcgis-blog\/author\/bmeehan","custom_image":"https:\/\/www.esri.com\/arcgis-blog\/app\/uploads\/2018\/05\/Electric-Utility-Damage-Assessment-GettyImages-157509718-1920x1080-75-quality.jpg","primary_product":"ArcGIS","tag_data":[{"term_id":565442,"name":"ArcGIS Utility Network","slug":"arcgis-utility-network","term_group":0,"term_taxonomy_id":565442,"taxonomy":"post_tag","description":"","parent":0,"count":87,"filter":"raw"},{"term_id":687851,"name":"crisis","slug":"crisis","term_group":0,"term_taxonomy_id":687851,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":27121,"name":"Emergency Management","slug":"emergency-management","term_group":0,"term_taxonomy_id":27121,"taxonomy":"post_tag","description":"","parent":0,"count":30,"filter":"raw"},{"term_id":23081,"name":"Utilities","slug":"utilities","term_group":0,"term_taxonomy_id":23081,"taxonomy":"post_tag","description":"","parent":0,"count":220,"filter":"raw"},{"term_id":37771,"name":"Water","slug":"water","term_group":0,"term_taxonomy_id":37771,"taxonomy":"post_tag","description":"","parent":0,"count":67,"filter":"raw"}],"category_data":[{"term_id":37511,"name":"Sharing and Collaboration","slug":"sharing-collaboration","term_group":0,"term_taxonomy_id":37511,"taxonomy":"category","description":"","parent":0,"count":424,"filter":"raw"}],"product_data":[{"term_id":421922,"name":"ArcGIS","slug":"arcgis","term_group":0,"term_taxonomy_id":421922,"taxonomy":"product","description":"Reserved for articles that cover all of ArcGIS","parent":36981,"count":339,"filter":"raw"},{"term_id":36641,"name":"ArcGIS Collector","slug":"collector","term_group":0,"term_taxonomy_id":36641,"taxonomy":"product","description":"","parent":36591,"count":140,"filter":"raw"},{"term_id":36671,"name":"ArcGIS Dashboards","slug":"ops-dashboard","term_group":0,"term_taxonomy_id":36671,"taxonomy":"product","description":"","parent":36591,"count":196,"filter":"raw"},{"term_id":37381,"name":"ArcGIS GeoEvent Server","slug":"ext-server-geoevent","term_group":0,"term_taxonomy_id":37381,"taxonomy":"product","description":"","parent":36571,"count":31,"filter":"raw"},{"term_id":36811,"name":"ArcGIS Hub","slug":"arcgis-hub","term_group":0,"term_taxonomy_id":36811,"taxonomy":"product","description":"","parent":36591,"count":219,"filter":"raw"},{"term_id":36581,"name":"ArcGIS Living Atlas","slug":"arcgis-living-atlas","term_group":0,"term_taxonomy_id":36581,"taxonomy":"product","description":"","parent":0,"count":1171,"filter":"raw"},{"term_id":36681,"name":"ArcGIS Navigator","slug":"navigator","term_group":0,"term_taxonomy_id":36681,"taxonomy":"product","description":"","parent":36591,"count":54,"filter":"raw"},{"term_id":36551,"name":"ArcGIS Online","slug":"arcgis-online","term_group":0,"term_taxonomy_id":36551,"taxonomy":"product","description":"","parent":0,"count":2428,"filter":"raw"},{"term_id":36561,"name":"ArcGIS Pro","slug":"arcgis-pro","term_group":0,"term_taxonomy_id":36561,"taxonomy":"product","description":"","parent":0,"count":2038,"filter":"raw"},{"term_id":408802,"name":"ArcGIS QuickCapture","slug":"quickcapture","term_group":0,"term_taxonomy_id":408802,"taxonomy":"product","description":"","parent":36591,"count":61,"filter":"raw"},{"term_id":380802,"name":"ArcGIS StoryMaps","slug":"arcgis-storymaps","term_group":0,"term_taxonomy_id":380802,"taxonomy":"product","description":"","parent":0,"count":322,"filter":"raw"},{"term_id":36691,"name":"ArcGIS Survey123","slug":"survey123","term_group":0,"term_taxonomy_id":36691,"taxonomy":"product","description":"","parent":36591,"count":179,"filter":"raw"},{"term_id":350952,"name":"ArcGIS Tracker","slug":"tracker","term_group":0,"term_taxonomy_id":350952,"taxonomy":"product","description":"","parent":36591,"count":30,"filter":"raw"},{"term_id":515312,"name":"ArcGIS Utility Network","slug":"utility-network","term_group":0,"term_taxonomy_id":515312,"taxonomy":"product","description":"","parent":36981,"count":141,"filter":"raw"},{"term_id":36631,"name":"ArcGIS Web AppBuilder","slug":"web-appbuilder","term_group":0,"term_taxonomy_id":36631,"taxonomy":"product","description":"","parent":36591,"count":103,"filter":"raw"},{"term_id":36701,"name":"ArcGIS Workforce","slug":"workforce","term_group":0,"term_taxonomy_id":36701,"taxonomy":"product","description":"","parent":36591,"count":66,"filter":"raw"}],"primary_product_link":"https:\/\/www.esri.com\/arcgis-blog\/?s=#&products=arcgis","_links":{"self":[{"href":"https:\/\/www.esri.com\/arcgis-blog\/wp-json\/wp\/v2\/blog\/895721","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esri.com\/arcgis-blog\/wp-json\/wp\/v2\/blog"}],"about":[{"href":"https:\/\/www.esri.com\/arcgis-blog\/wp-json\/wp\/v2\/types\/blog"}],"author":[{"embeddable":true,"href":"https:\/\/www.esri.com\/arcgis-blog\/wp-json\/wp\/v2\/users\/25891"}],"replies":[{"embeddable":true,"href":"https:\/\/www.esri.com\/arcgis-blog\/wp-json\/wp\/v2\/comments?post=895721"}],"version-history":[{"count":0,"href":"https:\/\/www.esri.com\/arcgis-blog\/wp-json\/wp\/v2\/blog\/895721\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.esri.com\/arcgis-blog\/wp-json\/wp\/v2\/media?parent=895721"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.esri.com\/arcgis-blog\/wp-json\/wp\/v2\/categories?post=895721"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.esri.com\/arcgis-blog\/wp-json\/wp\/v2\/tags?post=895721"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/www.esri.com\/arcgis-blog\/wp-json\/wp\/v2\/industry?post=895721"},{"taxonomy":"product","embeddable":true,"href":"https:\/\/www.esri.com\/arcgis-blog\/wp-json\/wp\/v2\/product?post=895721"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}