{"id":406232,"date":"2025-02-05T08:09:23","date_gmt":"2025-02-05T08:09:23","guid":{"rendered":"https:\/\/uat.esri.com\/en-us\/industries\/blog\/?post_type=blog&#038;p=406232"},"modified":"2026-02-25T21:50:32","modified_gmt":"2026-02-25T21:50:32","slug":"whats-location-got-to-do-with-it","status":"publish","type":"blog","link":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/whats-location-got-to-do-with-it","title":{"rendered":"What\u2019s Location Got To Do With It?"},"content":{"rendered":"<h2 class=\"wp-block-heading\" id=\"h-coordinate-manage-and-deliver-projects-with-a-geographic-approach\">Coordinate, Manage, and Deliver Projects with A Geographic Approach<\/h2>\n\n<p class=\"undefined block-editor-paragraph\">Planning, designing, building (or just fixing) the infrastructure that keeps our world moving requires many tasks, people, and resources coordinated over time and space. To wrangle the complexities, managers of AEC projects use various manual and digital methods to monitor the efforts and track progress. But, as the saying goes, &#8220;Time is Money,&#8221; and monitoring both elements on a construction project are intertwined and can be overwhelming.&nbsp;&nbsp;<\/p>\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2022\/04\/HNTB-BIM-GIS-Schedule-Cost-3D-4D-5D-1024x576.png\" alt=\"\" class=\"wp-image-406522\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/04\/HNTB-BIM-GIS-Schedule-Cost-3D-4D-5D-1024x576.png 1024w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/04\/HNTB-BIM-GIS-Schedule-Cost-3D-4D-5D-300x169.png 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/04\/HNTB-BIM-GIS-Schedule-Cost-3D-4D-5D-768x432.png 768w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/04\/HNTB-BIM-GIS-Schedule-Cost-3D-4D-5D-1536x864.png 1536w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/04\/HNTB-BIM-GIS-Schedule-Cost-3D-4D-5D.png 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><em>GIS, BIM, Schedule and Cost visualized on the Jamaica Street LIRR Station, train crossing overpass replacement. &nbsp;Image courtesy HNTB.<\/em><\/figcaption><\/figure>\n\n<p class=\"undefined block-editor-paragraph\">Project management in any sector or business can be complex. It is made easier when the element of location is included.&nbsp;AEC projects are designed and engineered based on the constraints of the location, built in a specific location, comprised of parts that come from many locations, assembled by tradespeople who come together at a single location to create a built or natural environment in a prescribed manner, as defined by schedulers and planners (who likely work at a different location than the project location).&nbsp;<\/p>\n\n<p class=\"undefined block-editor-paragraph\">In AEC, project managers are often split between showing up on-site and completing desk work at the office. They need to visit project on-sites to confirm progress achieved by others and verify that the sequence performed matches the plans. Project managers also need to create systems to collect status reports on a timely basis from various sources, which are analyzed and entered in a master schedule to inform a wide range of stakeholders (many of them likely don\u2019t know how to read a project schedule).<\/p>\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"501\" src=\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2022\/04\/FieldInspections-1024x501.png\" alt=\"\" class=\"wp-image-406572\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/04\/FieldInspections-1024x501.png 1024w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/04\/FieldInspections-300x147.png 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/04\/FieldInspections-768x376.png 768w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/04\/FieldInspections-1536x752.png 1536w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/04\/FieldInspections.png 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><em>Safety Management dashboard comprised of GIS, BIM, CAD with field captured issues.<\/em><\/figcaption><\/figure>\n\n<p class=\"undefined block-editor-paragraph\">The standard approach for progress control has been and continues to be redundant data entry, primitive analysis, and Critical Path Methods. This approach results in project managers who struggle to keep the schedule updated and entire teams challenged to understand the actual status clearly. Master schedules get decomposed into smaller &#8220;look ahead&#8221; plans of various timespans, allowing the project to be understood and accomplished. Some firms use modern methods to improve predictability and productivity, such as work-packaging, Lean, TAKT, and pull-planning. However, the vast majority of AEC work occurs with the same project management tools and techniques taught since the 1950s.<\/p>\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"501\" src=\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2022\/04\/Project-Mgmt1-1-1024x501.png\" alt=\"\" class=\"wp-image-406542\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/04\/Project-Mgmt1-1-1024x501.png 1024w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/04\/Project-Mgmt1-1-300x147.png 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/04\/Project-Mgmt1-1-768x376.png 768w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/04\/Project-Mgmt1-1-1536x752.png 1536w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/04\/Project-Mgmt1-1.png 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><em>Primavera P6 schedule connected to GIS features, presented in an interactive ArcGIS dashboard<\/em>.<\/figcaption><\/figure>\n\n<section class=\"news-blockquote--quote block-editor-quote is-layout-flow wp-block-quote-is-layout-flow\" aria-label=\"Quotation\"><blockquote class=\"news-blockquote-block--quote\"><div class=\"news-blockquote-block--author\"><cite class=\"author--name font-size-0 avenir-bold\">Project management and project controls are ripe for improvements\u2013While some AEC teams continue using methods taught since the 1950\u2019s, leaders seeking better ways to plan their work integrate Geographic Information Systems (GIS) with traditional project management methods.<\/cite><\/div><\/blockquote><\/section>\n\n<p class=\"undefined block-editor-paragraph\">Planners, schedulers, and project managers recognize the disadvantage they experience without considering location information. There is constant pressure to shorten delivery times while maintaining budgets and safety. Many have spoken about improving the cost and time wasted in AEC, due in large part to the complexities of information management, data access, and tracking changes.&nbsp; Much has been written about the need for substantial improvement in the current scheduling and progress reporting practices. This article may stand out as it proposes that integrating <a href=\"https:\/\/www.esri.com\/en-us\/what-is-gis\/overview\">GIS<\/a> and project management software is an essential tool for addressing these issues and achieving these goals.<\/p>\n\n<h2 class=\"wp-block-heading\" id=\"part2\">Enable New Project Planning Insights<\/h2>\n\n<p class=\"undefined block-editor-paragraph\">Integrating GIS with scheduling, budgeting and issues tracking helps professionals make more informed decisions relating to the built environment projects and the people living in them. The power of location data empowers tasks such as progress monitoring, 3D data analysis, comparison of actual vs. planned, scheduling and progress control with 3D visualization.&nbsp;<\/p>\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"504\" src=\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2022\/05\/Frankfurt-Central-Station-1024x504.png\" alt=\"\" class=\"wp-image-406712\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/05\/Frankfurt-Central-Station-1024x504.png 1024w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/05\/Frankfurt-Central-Station-300x148.png 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/05\/Frankfurt-Central-Station-768x378.png 768w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/05\/Frankfurt-Central-Station-1536x756.png 1536w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/05\/Frankfurt-Central-Station.png 1918w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Frankfurt Central Station \u2013 GIS, BIM and imagery data combined in a web-based project explorer.<\/figcaption><\/figure>\n\n<p class=\"undefined block-editor-paragraph\">The integration of GIS and project management assists a planner by offering better perceptions of the project and the wide range of companies&#8217; activities in the planning process. When location analysis is a core capability of the team\u2019s toolset, decision making occurs based on insights that often can only be gleaned from a location-based view.&nbsp; The predominance of issues in a location of a project, the intersection of workers and unsafe environments, availability of routes and spaces for materials to be warehoused \u2013 these are just a few of the ways GIS reveals critical information for the AEC planner.&nbsp;<\/p>\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"450\" src=\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2022\/05\/Time-based-reality-capture-1024x450.png\" alt=\"\" class=\"wp-image-406722\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/05\/Time-based-reality-capture-1024x450.png 1024w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/05\/Time-based-reality-capture-300x132.png 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/05\/Time-based-reality-capture-768x338.png 768w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/05\/Time-based-reality-capture.png 1430w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Time-based reality capture data combined with GIS improves location enabled scheduling.<\/figcaption><\/figure>\n\n<p class=\"undefined block-editor-paragraph\">The practical benefits of visualizing construction at various levels of detail, in context to the real-world are significant.&nbsp; GIS allows construction managers and all the stakeholders involved in the project with a range of backgrounds to be informed about the progress of the project and support decision making. GIS provides a basis and system for understanding and communication for the professionals and lay-persons needing to be informed.&nbsp;&nbsp;&nbsp;<\/p>\n\n<p class=\"undefined block-editor-paragraph\">Visualizing construction status in 3D \/ 4D provides the entire team with a more intuitive view of the construction sequence. Furthermore, when this visualization includes location-based data through GIS, the construction manager\u2019s view of construction activities is put in context.&nbsp;The value of context throughout the AEC project lifecycle cannot be understated.&nbsp; Through examples, anecdotes and a few links, this series of articles demonstrates GIS integrated with various AEC tools improves project planning, visualization, and results in an integrated information system.<\/p>\n\n<p class=\"undefined block-editor-paragraph\"><strong>Interested in learning more<\/strong> \u2013 Fill out this <a href=\"https:\/\/arcg.is\/1Gy9vu0\" target=\"_blank\" rel=\"noreferrer noopener\">contact form<\/a> and an Esri expert will reach out to schedule a meeting.<\/p>","protected":false},"author":302,"featured_media":0,"parent":0,"menu_order":0,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2822],"tags":[],"class_list":["post-406232","blog","type-blog","status-publish","format-standard","hentry","category-construction","industry-architecture-engineering-and-construction"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.9 (Yoast SEO v25.9) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>What\u2019s Location Got To Do With It?<\/title>\n<meta name=\"description\" content=\"Leaders seeking better ways to plan their work integrate Geographic Information Systems (GIS) with traditional project management methods.\" \/>\n<meta name=\"robots\" content=\"noindex, follow\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What\u2019s Location Got To Do With It?\" \/>\n<meta property=\"og:description\" content=\"Leaders seeking better ways to plan their work integrate Geographic Information Systems (GIS) with traditional project management methods.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/whats-location-got-to-do-with-it\" \/>\n<meta property=\"og:site_name\" content=\"Industry Blogs\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-25T21:50:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/04\/HNTB-BIM-GIS-Schedule-Cost-3D-4D-5D-1024x576.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"576\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/whats-location-got-to-do-with-it\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/whats-location-got-to-do-with-it\",\"name\":\"What\u2019s Location Got To Do With It?\",\"isPartOf\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/whats-location-got-to-do-with-it#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/whats-location-got-to-do-with-it#primaryimage\"},\"thumbnailUrl\":\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2022\/04\/HNTB-BIM-GIS-Schedule-Cost-3D-4D-5D-1024x576.png\",\"datePublished\":\"2025-02-05T08:09:23+00:00\",\"dateModified\":\"2026-02-25T21:50:32+00:00\",\"description\":\"Leaders seeking better ways to plan their work integrate Geographic Information Systems (GIS) with traditional project management methods.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/whats-location-got-to-do-with-it#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/whats-location-got-to-do-with-it\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/whats-location-got-to-do-with-it#primaryimage\",\"url\":\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2022\/04\/HNTB-BIM-GIS-Schedule-Cost-3D-4D-5D-1024x576.png\",\"contentUrl\":\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2022\/04\/HNTB-BIM-GIS-Schedule-Cost-3D-4D-5D-1024x576.png\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/whats-location-got-to-do-with-it#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"What\u2019s Location Got To Do With It?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/\",\"name\":\"Industry Blogs\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/a286d1e87096890300e7b1d502e98f68\",\"name\":\"Marc Goldman\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2020\/09\/Marc-Goldman-headshot-150x150.jpeg\",\"contentUrl\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2020\/09\/Marc-Goldman-headshot-150x150.jpeg\",\"caption\":\"Marc Goldman\"},\"description\":\"Marc Goldman is the Director of AEC Industry at Esri. He works with a global team to define and deliver the strategy for Esri\u2019s solutions serving architecture, engineering, and construction. He is a leading expert in BIM, GIS, Digital Twins, and their impact on the industry. Marc began his career in the first days of CAD, he led some of the earliest BIM efforts, and he has contributed over thirty years defining, developing, and delivering services and technologies for design, engineering, manufacturing, and construction. He works with an international network of AEC executives creating joint ventures, partnerships, and customer relationships. He was the Vice Chair of the NIBS Digital Twin Integration Subcommittee, the co-Chair of the Digital Twin Consortium AECO group, and supports buildingSMART International on the Steering Committee for the Infrastructure Room and the OGC+bSI Working Group. Many years ago, Marc studied Architecture and Civil Engineering at Tulane University. Currently, when not immersed in the technologies of architecture, engineering and construction, you\u2019ll find him biking, skiing, or flying small aircraft as he\u2019s working on his private pilot license.\",\"sameAs\":[\"https:\/\/www.linkedin.com\/in\/marcgoldman\/\",\"https:\/\/x.com\/bim4aec\"],\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/author\/marc-goldman\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"What\u2019s Location Got To Do With It?","description":"Leaders seeking better ways to plan their work integrate Geographic Information Systems (GIS) with traditional project management methods.","robots":{"index":"noindex","follow":"follow"},"og_locale":"en_US","og_type":"article","og_title":"What\u2019s Location Got To Do With It?","og_description":"Leaders seeking better ways to plan their work integrate Geographic Information Systems (GIS) with traditional project management methods.","og_url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/whats-location-got-to-do-with-it","og_site_name":"Industry Blogs","article_modified_time":"2026-02-25T21:50:32+00:00","og_image":[{"width":1024,"height":576,"url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/04\/HNTB-BIM-GIS-Schedule-Cost-3D-4D-5D-1024x576.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/whats-location-got-to-do-with-it","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/whats-location-got-to-do-with-it","name":"What\u2019s Location Got To Do With It?","isPartOf":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/whats-location-got-to-do-with-it#primaryimage"},"image":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/whats-location-got-to-do-with-it#primaryimage"},"thumbnailUrl":"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2022\/04\/HNTB-BIM-GIS-Schedule-Cost-3D-4D-5D-1024x576.png","datePublished":"2025-02-05T08:09:23+00:00","dateModified":"2026-02-25T21:50:32+00:00","description":"Leaders seeking better ways to plan their work integrate Geographic Information Systems (GIS) with traditional project management methods.","breadcrumb":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/whats-location-got-to-do-with-it#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/whats-location-got-to-do-with-it"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/whats-location-got-to-do-with-it#primaryimage","url":"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2022\/04\/HNTB-BIM-GIS-Schedule-Cost-3D-4D-5D-1024x576.png","contentUrl":"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2022\/04\/HNTB-BIM-GIS-Schedule-Cost-3D-4D-5D-1024x576.png"},{"@type":"BreadcrumbList","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/whats-location-got-to-do-with-it#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.esri.com\/en-us\/industries\/blog"},{"@type":"ListItem","position":2,"name":"What\u2019s Location Got To Do With It?"}]},{"@type":"WebSite","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/","name":"Industry Blogs","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.esri.com\/en-us\/industries\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/a286d1e87096890300e7b1d502e98f68","name":"Marc Goldman","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/image\/","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2020\/09\/Marc-Goldman-headshot-150x150.jpeg","contentUrl":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2020\/09\/Marc-Goldman-headshot-150x150.jpeg","caption":"Marc Goldman"},"description":"Marc Goldman is the Director of AEC Industry at Esri. He works with a global team to define and deliver the strategy for Esri\u2019s solutions serving architecture, engineering, and construction. He is a leading expert in BIM, GIS, Digital Twins, and their impact on the industry. Marc began his career in the first days of CAD, he led some of the earliest BIM efforts, and he has contributed over thirty years defining, developing, and delivering services and technologies for design, engineering, manufacturing, and construction. He works with an international network of AEC executives creating joint ventures, partnerships, and customer relationships. He was the Vice Chair of the NIBS Digital Twin Integration Subcommittee, the co-Chair of the Digital Twin Consortium AECO group, and supports buildingSMART International on the Steering Committee for the Infrastructure Room and the OGC+bSI Working Group. Many years ago, Marc studied Architecture and Civil Engineering at Tulane University. Currently, when not immersed in the technologies of architecture, engineering and construction, you\u2019ll find him biking, skiing, or flying small aircraft as he\u2019s working on his private pilot license.","sameAs":["https:\/\/www.linkedin.com\/in\/marcgoldman\/","https:\/\/x.com\/bim4aec"],"url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/author\/marc-goldman"}]}},"text_date":"February 5, 2025","author_name":"Marc Goldman","author_page":"https:\/\/www.esri.com\/en-us\/industries\/blog\/author\/marc-goldman","custom_image":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/04\/enr-enews-daily-alert-week-one-ad-1920x1080-1.jpg","primary_product":"Architecture, Engineering, and Construction","tag_data":[],"category_data":[{"term_id":2822,"name":"Construction","slug":"construction","term_group":0,"term_taxonomy_id":2822,"taxonomy":"category","description":"","parent":0,"count":3,"filter":"raw"}],"product_data":{"errors":{"invalid_taxonomy":["Invalid taxonomy."]},"error_data":[]},"primary_product_link":"https:\/\/www.esri.com\/en-us\/industries\/blog\/industry\/architecture-engineering-and-construction","short_description":"Leaders seeking better ways to plan their work integrate Geographic Information Systems (GIS) with traditional project management methods. ","image":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2022\/04\/enr-enews-daily-alert-week-one-ad-826x465-1.jpg","_links":{"self":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article\/406232","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article"}],"about":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/types\/blog"}],"author":[{"embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/users\/302"}],"version-history":[{"count":0,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article\/406232\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/media?parent=406232"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/categories?post=406232"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/tags?post=406232"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}