{"id":450482,"date":"2023-04-26T15:31:11","date_gmt":"2023-04-26T15:31:11","guid":{"rendered":"https:\/\/uat.esri.com\/en-us\/industries\/blog\/?post_type=blog&#038;p=450482"},"modified":"2023-04-26T15:32:36","modified_gmt":"2023-04-26T15:32:36","slug":"from-cad-to-gis-work-management-and-asset-management","status":"publish","type":"blog","link":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/from-cad-to-gis-work-management-and-asset-management","title":{"rendered":"CAD to GIS\u2014Work Management and Asset Management All in One Place"},"content":{"rendered":"<p class=\"undefined block-editor-paragraph\"><em>By Kelly Bobki, GIS Supervisor, Water Engineering, and Phillip Brown, PE, MSCE, Civil Engineer<\/em><\/p>\n\n<p class=\"undefined block-editor-paragraph\">The Kansas City Board of Public Utilities (BPU) provides safe, dependable water and electric services across Kansas City, Kansas. As a nonprofit public utility, we are fully committed to serving our customers and the community as a whole. It&#8217;s more than simply providing a service. It&#8217;s a commitment to a better quality of life. The Water Department provides water to 55,000 customers. The water system includes 6,700 fire hydrants; 13,000 water valves; and over 963 miles of water pipe.<\/p>\n\n<h2 class=\"wp-block-heading\" id=\"h-legacy-solutions-and-paper-based-workflows\">Legacy Solutions and Paper-based Workflows<\/h2>\n\n<p class=\"undefined block-editor-paragraph\">Our legacy system contained tiled maps in AutoCAD drawing format, which contained a geographic information system (GIS) database on the back end. The tiled AutoCAD drawings split at the centerline of a road, and there were over 600 drawing files. We had a disconnected system. Finding assets in the field was a challenge for the field crews. Work management consisted of providing field crews with a sheet of paper listing an address or assets and what was to be done to the assets. The papers would sit on someone&#8217;s desk, or get lost in routing, and some never made it to the office from the field. BPU needed a better system for tracking and managing data.<\/p>\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"637\" height=\"391\" src=\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/04\/GIS-Integrates-Business-Systems.jpg\" alt=\"\" class=\"wp-image-451412\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/GIS-Integrates-Business-Systems.jpg 637w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/GIS-Integrates-Business-Systems-300x184.jpg 300w\" sizes=\"auto, (max-width: 637px) 100vw, 637px\" \/><figcaption>ArcGIS brings data from multiple systems together, improving collaboration and workflow management.<\/figcaption><\/figure><\/div>\n\n<h2 class=\"wp-block-heading\" id=\"h-modernizing-and-making-data-accessible\">Modernizing and Making Data Accessible<\/h2>\n\n<p class=\"undefined block-editor-paragraph\">We spoke with several vendors throughout our selection process and visited others at trade shows and conferences to help determine which would be best for our Water Engineering Department. Engineers in the department had used Esri in the past at different jobs, and after seeing some demonstrations, we decided this would be the best fit.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">BPU implemented Esri&#8217;s ArcGIS and created an internal GIS site for all departments to access. ArcGIS enabled us to store all data in one location and pull in legacy data from older systems. We now had all data at our fingertips, displayed on useful maps.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">During our GIS conversion, we also wanted to give our crews the ability to access and update the data in the field so we would no longer have to rely on paper.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">Internally, we created our GIS websites using Geocortex and ArcGIS Online. We started with our field work order map and concentrated on our distribution system first. Since our GIS conversion six years ago, we now have all water departments accessing GIS sites. These include the following:<\/p>\n\n<ul class=\"wp-block-list\"><li>Tap &amp; Permit Maps\u2014Used by our tap trucks and follow a service from installation to turning on<\/li><li>Trouble Map\u2014Used by our trouble service crews to complete customer service orders<\/li><li>Backflow Map\u2014Tracks backflow devices<\/li><li>Valve Inspection Map\u2014Yearly inspection of valves<\/li><li>Hydrant Inspection Map\u2014Yearly inspection of hydrants<\/li><li>Hydrant Flushing Map\u2014Tracks hydrants that are being flushed<\/li><\/ul>\n\n<p class=\"undefined block-editor-paragraph\">Our field crews access our external sites using ArcGIS Field Maps through a mobile device. This allows both internal and external updates to assets to be seen in real time.<\/p>\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"643\" height=\"357\" src=\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/04\/Data-in-ArcGIS.jpg\" alt=\"\" class=\"wp-image-451422\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/Data-in-ArcGIS.jpg 643w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/Data-in-ArcGIS-300x167.jpg 300w\" sizes=\"auto, (max-width: 643px) 100vw, 643px\" \/><figcaption>Data is stored in ArcGIS and displayed in maps available to field and office staff. <\/figcaption><\/figure><\/div>\n\n<h2 class=\"wp-block-heading\" id=\"h-improving-work-management\">Improving Work Management<\/h2>\n\n<p class=\"undefined block-editor-paragraph\">Our next focus was developing a work management system that would allow us to track our daily work; plan work in advance; track material used on jobs; and create workflows from start to finish on installation, abandonment, and maintenance of assets.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">Using ArcGIS Online and Geocortex, we created a work management map. Work orders are created based on asset type (hydrant, valve, main, service) and given a priority of 1\u20135 that follows our business processes.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">We also linked our locate data to this map. We set up script files to run on the back end to let us know when jobs were ready to work. When the red locate box appears on the map, this lets us know that locates are completed and the job is ready to be worked.<\/p>\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"490\" src=\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/04\/page3_geocortex-1-1024x490.jpg\" alt=\"\" class=\"wp-image-456852\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/page3_geocortex-1-1024x490.jpg 1024w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/page3_geocortex-1-300x144.jpg 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/page3_geocortex-1-768x368.jpg 768w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/page3_geocortex-1-1536x735.jpg 1536w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/page3_geocortex-1.jpg 1692w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>Internal website displaying field work orders.<\/figcaption><\/figure>\n\n<p class=\"undefined block-editor-paragraph\">Using the ArcGIS Field Maps app, field staff can access work orders on their handheld devices and input the work they perform. This includes the material used, asset type, size, and manufacturer, and it also tracks start and finish times. We worked with our water leads to develop and implement this process. This increased the buy-in from staff and helped to ensure that the new solution would be used.<\/p>\n\n<section class=\"news-blockquote--quote block-editor-quote is-layout-flow wp-block-quote-is-layout-flow\" aria-label=\"Quotation\"><blockquote class=\"news-blockquote-block--quote\"><p class=\"block-editor-pullquote-body\">Field Maps has been an extremely useful and innovative tool for us to use. Between the pictures we upload to track the jobs and the attribute data on our assets, it has made record-keeping of what&#8217;s in the field very convenient and easy to access.<\/p><div class=\"news-blockquote-block--author\"><cite class=\"author--name font-size-0 avenir-bold\">Steve Hargis, Water Lead<\/cite><span class=\"author--info font-size--1 avenir-regular\">Kansas City Board of Public Utilities<\/span><\/div><\/blockquote><\/section>\n\n<p class=\"undefined block-editor-paragraph\">As water assets are installed, our engineer aides use survey-grade Carlson BRx7 GPS equipment to collect high-accuracy location information. Approximately 90 percent of our assets have high-accuracy locations stored in the GIS. This is a benefit to our water leads, because they can use Field Maps on mobile devices to get to the asset. They also have the ability in the field to view work orders that have been completed.<\/p>\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"527\" src=\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/04\/Kansas-City_Field-Maps-1024x527.jpg\" alt=\"\" class=\"wp-image-451442\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/Kansas-City_Field-Maps-1024x527.jpg 1024w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/Kansas-City_Field-Maps-300x155.jpg 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/Kansas-City_Field-Maps-768x396.jpg 768w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/Kansas-City_Field-Maps-1536x791.jpg 1536w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/Kansas-City_Field-Maps.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>Field Maps App on a Cell Phone, being used to execute work orders. <\/figcaption><\/figure>\n\n<p class=\"undefined block-editor-paragraph\">Follow-up work is captured on the work order using a restoration feature layer. This feature layer includes the size and type of the area that needs to be repaired. Once the water service lead completes the work order in the field, the status changes to Installed. Supervisors review the work and change it to Waiting Mapping. The assets and attributes are then added in the GIS.<\/p>\n\n<section class=\"news-blockquote--quote block-editor-quote is-layout-flow wp-block-quote-is-layout-flow\" aria-label=\"Quotation\"><blockquote class=\"news-blockquote-block--quote\"><p class=\"block-editor-pullquote-body\">The GIS has helped me immensely in my daily work activity.&nbsp;Whether that is using the GIS to help with new design or accessing older records for assisting crews with maintenance, the GIS is a one-stop shop that makes my job much simpler. It also helps that the GIS team is very active with updates and helping to train staff on using the GIS so that we are working with the most up-to-date information and using the GIS in the most efficient way.<\/p><div class=\"news-blockquote-block--author\"><cite class=\"author--name font-size-0 avenir-bold\">Brandon Sisk, Project Engineer<\/cite><span class=\"author--info font-size--1 avenir-regular\">Kansas City Board of Public Utilities<\/span><\/div><\/blockquote><\/section>\n\n<p class=\"undefined block-editor-paragraph\">ArcGIS Dashboards have been configured for our executive managers and distribution managers based on information that they request to see. The dashboards help to track our assets and monitor work order progress.<\/p>\n\n<section class=\"news-blockquote--quote block-editor-quote is-layout-flow wp-block-quote-is-layout-flow\" aria-label=\"Quotation\"><blockquote class=\"news-blockquote-block--quote\"><p class=\"block-editor-pullquote-body\">Working in a water system, our supervisors are always being pulled in different directions. Using ArcGIS Dashboards allows our management team the tools they need to visualize the current workload and better utilize our employees in the field.<\/p><div class=\"news-blockquote-block--author\"><cite class=\"author--name font-size-0 avenir-bold\">Steve Green, Executive Director of Water Operations<\/cite><span class=\"author--info font-size--1 avenir-regular\">Kansas City Board of Public Utilities<\/span><\/div><\/blockquote><\/section>\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"537\" src=\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/04\/page5_ESRIdashboard-1024x537.jpg\" alt=\"\" class=\"wp-image-451452\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/page5_ESRIdashboard-1024x537.jpg 1024w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/page5_ESRIdashboard-300x157.jpg 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/page5_ESRIdashboard-768x403.jpg 768w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/page5_ESRIdashboard-1536x806.jpg 1536w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/page5_ESRIdashboard.jpg 1902w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>Esri Work Order Dashboard used by the management team.<\/figcaption><\/figure><\/div>\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"917\" height=\"383\" src=\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/04\/page5_2ndgraph.jpg\" alt=\"\" class=\"wp-image-451462\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/page5_2ndgraph.jpg 917w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/page5_2ndgraph-300x125.jpg 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/page5_2ndgraph-768x321.jpg 768w\" sizes=\"auto, (max-width: 917px) 100vw, 917px\" \/><figcaption>Esri technology-based chart shows completed work orders by water service lead, used by the management team. <\/figcaption><\/figure>\n\n<h2 class=\"wp-block-heading\" id=\"h-converting-from-cad-to-gis-increases-efficiency-and-cost-savings\">Converting from CAD to GIS Increases Efficiency and Cost Savings<\/h2>\n\n<p class=\"undefined block-editor-paragraph\">The benefits of using ArcGIS products are plentiful. We now have one seamless map that contains all of our assets with all the associated attributes. Our field crews have access to live data in the field and can instantly see updates.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">We are able to plan work ahead of time and give our customers notice on planned maintenance work and emergency work. We use Esri and Geocortex to display our water network; it&#8217;s as simple as drawing a polygon around the area of work to trace the shutoff; then, we export a file to our interactive voice response (IVR) calling system that places the call and text and lets our customers know we have a planned outage in their area. Our crews used to have to knock on doors and leave notices of water shutoffs.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">Our crews are no longer going to a job and having to wait for locates. The locate data is displayed on the work order map and allows us to see if the locates are complete before we send the crew out to a jobsite. We are all familiar with the phrase &#8220;Time is money.&#8221; GIS has allowed us to be productive with our&nbsp;time and to focus more&nbsp;on&nbsp;achieving our annual goals.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">Work orders are mapped within a day of installation. With our old process, it would have taken a couple of weeks to get paper copies back to the GIS department.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">We have greater accuracy by adding pictures of our jobsites to the work orders before the job starts, during repair\/replacement, and after the work is completed. Our liabilities have also decreased because the photos are the best protection from false claims of property damage.<\/p>\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/04\/Kansas-City_Field-Crew-1024x576.jpg\" alt=\"\" class=\"wp-image-451472\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/Kansas-City_Field-Crew-1024x576.jpg 1024w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/Kansas-City_Field-Crew-300x169.jpg 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/Kansas-City_Field-Crew-768x432.jpg 768w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/Kansas-City_Field-Crew-1536x864.jpg 1536w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/Kansas-City_Field-Crew.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>Water crews on valve and main installation. Photos are uploaded into ArcGIS Field Maps. <\/figcaption><\/figure>\n\n<p class=\"undefined block-editor-paragraph\">Our water service leads take pictures of the installations before the start of locates, during installation, and when the job is complete. This has saved the utility money in terms of claims: if we have a complaint from a customer about how a jobsite was left, the photos of the completed job help us in fighting untrue claims against the utility.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">Below are pictures of a main leak; our crews capture the locates before digging, the exposed pipe, the repair made, and a final picture of the jobsite when the job is complete. All of these details are attached to the work order, including measurements, material, time, and photos, along with any follow-up work that needs to take place.<\/p>\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"417\" src=\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/04\/Kansas-City_Job-Photos-1024x417.jpg\" alt=\"\" class=\"wp-image-451482\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/Kansas-City_Job-Photos-1024x417.jpg 1024w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/Kansas-City_Job-Photos-300x122.jpg 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/Kansas-City_Job-Photos-768x313.jpg 768w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/Kansas-City_Job-Photos-1536x626.jpg 1536w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/Kansas-City_Job-Photos.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/div>\n\n<p class=\"undefined block-editor-paragraph\">We continue to build and grow our GIS system to benefit all groups in the Water Division at BPU. We have created an asset management and work order system that benefits all users and allows us to easily extract data for reporting and statistics and to manage our infrastructure more efficiently and effectively.<\/p>\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"579\" src=\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/04\/page8-1024x579.jpg\" alt=\"\" class=\"wp-image-451492\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/page8-1024x579.jpg 1024w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/page8-300x170.jpg 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/page8-768x435.jpg 768w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/page8.jpg 1315w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>Home screen for the Water Department in ArcGIS Online.<\/figcaption><\/figure>\n\n<section class=\"news-blockquote--quote block-editor-quote is-layout-flow wp-block-quote-is-layout-flow\" aria-label=\"Quotation\"><blockquote class=\"news-blockquote-block--quote\"><p class=\"block-editor-pullquote-body\">Esri has provided our engineering staff greater flexibility in designing projects, implementing and tracking work orders, and providing on-time asset management of our water system. The ability to analyze the performance of our aging infrastructure with Esri software is critical to prioritizing main replacements with limited funding available.<\/p><div class=\"news-blockquote-block--author\"><cite class=\"author--name font-size-0 avenir-bold\">Chris Stewart, Director, Civil Engineering<\/cite><span class=\"author--info font-size--1 avenir-regular\">Kansas City Board of Public Utilities<\/span><\/div><\/blockquote><\/section>\n\n<h2 class=\"has-text-align-center wp-block-heading\" id=\"h-stay-connected-with-esri-s-water-team\">Stay Connected with Esri&#8217;s Water Team<\/h2>\n\n<p class=\"has-text-align-center block-editor-paragraph\">ArcGIS is an extensive information system that enables modernization of workflows with easy-to-use applications for the field and office. Strengthen your organization with smart water solutions that will increase efficiency and provide insight for decision-makers. Visit the&nbsp;<a href=\"https:\/\/www.esri.com\/en-us\/industries\/water-utilities\/overview\" target=\"_blank\" rel=\"noreferrer noopener\">Esri Water Utilities<\/a>&nbsp;web site for more information.<\/p>\n\n<p class=\"has-text-align-center block-editor-paragraph\">Join the&nbsp;<a href=\"https:\/\/community.esri.com\/t5\/water-utilities\/ct-p\/water-utilities\" target=\"_blank\" rel=\"noreferrer noopener\">Water Utilities Community<\/a><\/p>\n\n<p class=\"has-text-align-center block-editor-paragraph\">Follow #EsriWater on social media:&nbsp;<a href=\"https:\/\/twitter.com\/EsriWater\" target=\"_blank\" rel=\"noreferrer noopener\">Twitter<\/a>&nbsp;|&nbsp;<a href=\"https:\/\/www.linkedin.com\/groups\/6533227\" target=\"_blank\" rel=\"noreferrer noopener\">LinkedIn<\/a><\/p>\n\n<p class=\"has-text-align-center block-editor-paragraph\">Subscribe to the Water Industry newsletter \u201c<a href=\"https:\/\/www.esri.com\/en-us\/industries\/water\/water-news\" target=\"_blank\" rel=\"noreferrer noopener\">Esri News for Water Utilities and Water Resources<\/a>\u201c<\/p>\n\n<p class=\"has-text-align-center block-editor-paragraph\">Learn more about how Esri supports Planning<a href=\"https:\/\/www.esri.com\/en-us\/industries\/water-utilities\/business-areas\/planning-engineering\"> and Engineering<\/a>. <\/p>","protected":false},"author":131,"featured_media":0,"parent":0,"menu_order":0,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[1762],"tags":[3992,125],"class_list":["post-450482","blog","type-blog","status-publish","format-standard","hentry","category-water-utilities","tag-digital-solutions","tag-digital-transformation","industry-water"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.9 (Yoast SEO v25.9) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>CAD to GIS\u2014Work Management and Asset Management All in One Place<\/title>\n<meta name=\"description\" content=\"Board of Public Utilities enables all groups of the Water Division with a GIS-based asset management and work order system.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/from-cad-to-gis-work-management-and-asset-management\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CAD to GIS\u2014Work Management and Asset Management All in One Place\" \/>\n<meta property=\"og:description\" content=\"The City of Kansas Board of Public Utilities enables all groups of the Water Division with a GIS-based asset management and work order system.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/from-cad-to-gis-work-management-and-asset-management\" \/>\n<meta property=\"og:site_name\" content=\"Industry Blogs\" \/>\n<meta property=\"article:modified_time\" content=\"2023-04-26T15:32:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/04\/page5_ESRIdashboard.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1902\" \/>\n\t<meta property=\"og:image:height\" content=\"998\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:description\" content=\"The City of Kansas Board of Public Utilities enables all groups of the Water Division with a GIS-based asset management and work order system.\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/from-cad-to-gis-work-management-and-asset-management\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/from-cad-to-gis-work-management-and-asset-management\",\"name\":\"CAD to GIS\u2014Work Management and Asset Management All in One Place\",\"isPartOf\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/from-cad-to-gis-work-management-and-asset-management#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/from-cad-to-gis-work-management-and-asset-management#primaryimage\"},\"thumbnailUrl\":\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/04\/GIS-Integrates-Business-Systems.jpg\",\"datePublished\":\"2023-04-26T15:31:11+00:00\",\"dateModified\":\"2023-04-26T15:32:36+00:00\",\"description\":\"Board of Public Utilities enables all groups of the Water Division with a GIS-based asset management and work order system.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/from-cad-to-gis-work-management-and-asset-management#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/from-cad-to-gis-work-management-and-asset-management\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/from-cad-to-gis-work-management-and-asset-management#primaryimage\",\"url\":\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/04\/GIS-Integrates-Business-Systems.jpg\",\"contentUrl\":\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/04\/GIS-Integrates-Business-Systems.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/from-cad-to-gis-work-management-and-asset-management#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"CAD to GIS\u2014Work Management and Asset Management All in One Place\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/\",\"name\":\"Industry Blogs\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/63b299b98844293e8c561496264c0a03\",\"name\":\"Christa Campbell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2021\/01\/ChristaCampbell_2020-150x150.jpg\",\"contentUrl\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2021\/01\/ChristaCampbell_2020-150x150.jpg\",\"caption\":\"Christa Campbell\"},\"description\":\"Christa is an experienced water industry professional with 20 years of success using and promoting technology to solve problems in the water industry. Recognized for Industry thought leadership, strategic thinking, and building success with organizations across the globe. She is a passionate GIS advocate, lifelong learner and collaborator. Builds success jointly with teammates, peers, and customers. Christa is a certified GIS Professional and holds a graduate degree in Geography.\",\"sameAs\":[\"https:\/\/www.esri.com\/en-us\/industries\/water\/overview\",\"https:\/\/www.linkedin.com\/in\/crstacampbell\/\",\"https:\/\/x.com\/CrstaCampbell\"],\"gender\":\"Female\",\"jobTitle\":\"Director Industry Solutions, Water\",\"worksFor\":\"Esri\",\"url\":\"\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"CAD to GIS\u2014Work Management and Asset Management All in One Place","description":"Board of Public Utilities enables all groups of the Water Division with a GIS-based asset management and work order system.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/from-cad-to-gis-work-management-and-asset-management","og_locale":"en_US","og_type":"article","og_title":"CAD to GIS\u2014Work Management and Asset Management All in One Place","og_description":"The City of Kansas Board of Public Utilities enables all groups of the Water Division with a GIS-based asset management and work order system.","og_url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/from-cad-to-gis-work-management-and-asset-management","og_site_name":"Industry Blogs","article_modified_time":"2023-04-26T15:32:36+00:00","og_image":[{"width":1902,"height":998,"url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/04\/page5_ESRIdashboard.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_description":"The City of Kansas Board of Public Utilities enables all groups of the Water Division with a GIS-based asset management and work order system.","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/from-cad-to-gis-work-management-and-asset-management","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/from-cad-to-gis-work-management-and-asset-management","name":"CAD to GIS\u2014Work Management and Asset Management All in One Place","isPartOf":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/from-cad-to-gis-work-management-and-asset-management#primaryimage"},"image":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/from-cad-to-gis-work-management-and-asset-management#primaryimage"},"thumbnailUrl":"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/04\/GIS-Integrates-Business-Systems.jpg","datePublished":"2023-04-26T15:31:11+00:00","dateModified":"2023-04-26T15:32:36+00:00","description":"Board of Public Utilities enables all groups of the Water Division with a GIS-based asset management and work order system.","breadcrumb":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/from-cad-to-gis-work-management-and-asset-management#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/from-cad-to-gis-work-management-and-asset-management"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/from-cad-to-gis-work-management-and-asset-management#primaryimage","url":"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/04\/GIS-Integrates-Business-Systems.jpg","contentUrl":"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/04\/GIS-Integrates-Business-Systems.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/from-cad-to-gis-work-management-and-asset-management#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.esri.com\/en-us\/industries\/blog"},{"@type":"ListItem","position":2,"name":"CAD to GIS\u2014Work Management and Asset Management All in One Place"}]},{"@type":"WebSite","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/","name":"Industry Blogs","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.esri.com\/en-us\/industries\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/63b299b98844293e8c561496264c0a03","name":"Christa Campbell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/image\/","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2021\/01\/ChristaCampbell_2020-150x150.jpg","contentUrl":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2021\/01\/ChristaCampbell_2020-150x150.jpg","caption":"Christa Campbell"},"description":"Christa is an experienced water industry professional with 20 years of success using and promoting technology to solve problems in the water industry. Recognized for Industry thought leadership, strategic thinking, and building success with organizations across the globe. She is a passionate GIS advocate, lifelong learner and collaborator. Builds success jointly with teammates, peers, and customers. Christa is a certified GIS Professional and holds a graduate degree in Geography.","sameAs":["https:\/\/www.esri.com\/en-us\/industries\/water\/overview","https:\/\/www.linkedin.com\/in\/crstacampbell\/","https:\/\/x.com\/CrstaCampbell"],"gender":"Female","jobTitle":"Director Industry Solutions, Water","worksFor":"Esri","url":""}]}},"text_date":"April 26, 2023","author_name":"Esri Water","author_page":false,"custom_image":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/Nearman-Pools_Banner.jpg","primary_product":"Water","tag_data":[{"term_id":3992,"name":"Digital Solutions","slug":"digital-solutions","term_group":0,"term_taxonomy_id":3992,"taxonomy":"post_tag","description":"","parent":0,"count":2,"filter":"raw"},{"term_id":125,"name":"digital transformation","slug":"digital-transformation","term_group":0,"term_taxonomy_id":125,"taxonomy":"post_tag","description":"","parent":0,"count":6,"filter":"raw"}],"category_data":[{"term_id":1762,"name":"Water Utilities","slug":"water-utilities","term_group":0,"term_taxonomy_id":1762,"taxonomy":"category","description":"","parent":147,"count":45,"filter":"raw"}],"product_data":{"errors":{"invalid_taxonomy":["Invalid taxonomy."]},"error_data":[]},"primary_product_link":"https:\/\/www.esri.com\/en-us\/industries\/blog\/industry\/water","short_description":"The City of Kansas Board of Public Utilities enables all groups of the Water Division with a GIS-based asset management and work order system. ","image":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/04\/Nearman-Pools_Card.jpg","_links":{"self":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article\/450482","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article"}],"about":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/types\/blog"}],"author":[{"embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/users\/131"}],"version-history":[{"count":0,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article\/450482\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/media?parent=450482"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/categories?post=450482"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/tags?post=450482"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}