{"id":487362,"date":"2023-10-19T14:53:12","date_gmt":"2023-10-19T14:53:12","guid":{"rendered":"https:\/\/uat.esri.com\/en-us\/industries\/blog\/?post_type=blog&#038;p=487362"},"modified":"2025-08-26T23:41:28","modified_gmt":"2025-08-26T23:41:28","slug":"stormwater-construction-activity-management-for-bus-rapid-transit","status":"publish","type":"blog","link":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/stormwater-construction-activity-management-for-bus-rapid-transit","title":{"rendered":"Stormwater Construction Activity Management for Bus Rapid Transit"},"content":{"rendered":"<p class=\"undefined block-editor-paragraph\">In the bustling heart of St. Paul, Minnesota, the METRO Gold Line Bus Rapid Transit (BRT) project is underway. Expected to debut in 2025, this transit system will bridge the east metro to the sprawling regional METRO network, uniting communities and commuters across the region. It promises seamless connectivity to employment hubs, housing options, transit arteries, and key destinations along the bustling I-94 corridor. Large construction projects have numerous stakeholders who are responsible for different aspects throughout the construction lifecycle, managing stormwater runoff is critical since active construction sites can be a large contributor to pollutants entering a community\u2019s waterways if not managed properly.<\/p>\n\n<h2 class=\"wp-block-heading\" id=\"h-partner\">Partner<\/h2>\n\n<p class=\"undefined block-editor-paragraph\">Ames Construction\u00a0is a full-service heavy civil and industrial general contractor operating throughout North America. Based in Minneapolis, the company specializes in heavy civil construction and is contracted by government and private organizations throughout the country to deliver infrastructure projects\u00a0for highways, railroads, bridges, airports, and industrial facilities. Ames Construction secured the active construction stormwater inspection responsibilities of the Gold Line project.<\/p>\n\n<h2 class=\"wp-block-heading\" id=\"h-challenge\">Challenge<\/h2>\n\n<p class=\"undefined block-editor-paragraph\">Many communities, as well as DOTs, must remain compliant with the regulations for municipal separate storm sewer systems (MS4). The Storm Water Pollution Prevention Plan, essential for preserving community water quality, requires inspection information to be accurate and standardized to support the ability to quickly safeguard against pollutants infiltrating the community\u2019s waterways through stormwater runoff. Communication and compliance are vital elements of a well-managed project; in the construction landscape where numerous stakeholders are integral &#8211; from local communities and DOT offices to city authorities, utility providers, and engineering firms &#8211; managing this intricate tapestry of collaboration demanded a new approach.<\/p>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"756\" height=\"800\" src=\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/10\/IMG_0126_5050square.jpg\" alt=\"\" class=\"wp-image-489842\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/10\/IMG_0126_5050square.jpg 756w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/10\/IMG_0126_5050square-284x300.jpg 284w\" sizes=\"auto, (max-width: 756px) 100vw, 756px\" \/><figcaption class=\"wp-element-caption\">Construction site<\/figcaption><\/figure>\n<\/div>\n\n<p class=\"undefined block-editor-paragraph\">Traditionally stormwater inspectors would need to visit the active construction sites, using a paper form to conduct inspections. After the inspection they would need to return to an office to finalize their reports, sign them and those paper letters would be mailed out to the site operators. Photos are essential documents to be included in those reports and compiling and labeling each photo before adding them to the report could take hours.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">Recognizing the need for a digital and near real-time solution to enhance inspections, facilitate communication, and fortify the project&#8217;s integrity, Nancy Lewis, Ames Construction&#8217;s geospatial manager, spearheaded a groundbreaking transformation.<\/p>\n\n<h2 class=\"wp-block-heading\" id=\"h-solution\">Solution<\/h2>\n\n<p class=\"undefined block-editor-paragraph\">To optimize inspection assignment and streamline reporting efforts, Nancy deployed Esri&#8217;s <a href=\"https:\/\/doc.arcgis.com\/en\/arcgis-solutions\/latest\/reference\/introduction-to-stormwater-construction-activity-management.htm\">Stormwater Construction Activity Management<\/a> solution. <\/p>\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"647\" height=\"805\" src=\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/10\/report-page-1.png\" alt=\"\" class=\"wp-image-490162\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/10\/report-page-1.png 647w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/10\/report-page-1-241x300.png 241w\" sizes=\"auto, (max-width: 647px) 100vw, 647px\" \/><figcaption class=\"wp-element-caption\">Example of an inspection report page<\/figcaption><\/figure>\n\n<p class=\"undefined block-editor-paragraph\">This solution delivers a set of capabilities that help conduct routine construction site inspections, record observations of sediment and erosion control on site, understand the effectiveness of stormwater control measures, and provide actionable reports to stakeholders.<\/p>\n\n<h2 class=\"wp-block-heading\" id=\"h-result\">Result<\/h2>\n\n<p class=\"undefined block-editor-paragraph\">Inspectors can now seamlessly perform routine site inspections, recording their observations and evaluating the efficacy of stormwater control measures. Stakeholders receive actionable, real-time reports, fostering transparency and rapid response.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">Using <a href=\"https:\/\/www.esri.com\/en-us\/arcgis\/products\/arcgis-survey123\/overview\">ArcGIS Survey123<\/a>, inspections are scheduled at seven-day intervals, utilizing forms on smartphones or tablets to streamline data collection. ArcGIS Survey123&#8217;s capacity to incorporate multiple images into reports, significantly reduces the time inspectors need to spend, in the office, provides valuable documentation for compliance reporting and enhances communication onsite with the site operators.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">ArcGIS solutions like the Stormwater Construction Activity Management solution are customizable to organizational needs. Nancy configured the solution to extend access to the field mapped photos that helped visualize project status and inspection details in <a href=\"https:\/\/www.esri.com\/en-us\/arcgis\/products\/arcgis-dashboards\/overview\">ArcGIS Dashboards<\/a>. <\/p>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"775\" src=\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/10\/tracking-partial-1-1024x775.png\" alt=\"\" class=\"wp-image-488042\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/10\/tracking-partial-1-1024x775.png 1024w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/10\/tracking-partial-1-300x227.png 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/10\/tracking-partial-1-768x581.png 768w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/10\/tracking-partial-1.png 1062w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Dashboard used to track inspection status<\/figcaption><\/figure>\n<\/div>\n\n<p class=\"undefined block-editor-paragraph\">Data is presented in an easily digestible format, empowering project managers to understand site conditions and report key performance indicators (KPIs) enabling them to make quick decisions and response to issues in near real-time.<\/p>\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"385\" src=\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/10\/Quote_Photoshop-2-1024x385.jpg\" alt=\"\" class=\"wp-image-488072\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/10\/Quote_Photoshop-2-1024x385.jpg 1024w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/10\/Quote_Photoshop-2-300x113.jpg 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/10\/Quote_Photoshop-2-768x289.jpg 768w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/10\/Quote_Photoshop-2-1536x578.jpg 1536w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/10\/Quote_Photoshop-2-2048x770.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<h2 class=\"has-text-align-center wp-block-heading\" id=\"h-stay-connected-with-esri-s-aec-team\"><strong>Stay Connected with Esri\u2019s AEC Team<\/strong><\/h2>\n\n<p class=\"has-text-align-center block-editor-paragraph\">Join the&nbsp;<a href=\"https:\/\/community.esri.com\/t5\/aec-architecture-engineering-and-construction\/ct-p\/architecture-engineering-construction\" target=\"_blank\" rel=\"noreferrer noopener\">Architecture, Engineering and Construction Community<\/a><\/p>\n\n<p class=\"has-text-align-center block-editor-paragraph\"><a href=\"https:\/\/www.esri.com\/en-us\/c\/industry\/aec\/aec-enewsletter-signup\">Subscribe to the AEC industry newsletter<\/a>&nbsp;\u201cEsri News for AEC\u201d<\/p>","protected":false},"author":171,"featured_media":0,"parent":0,"menu_order":0,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[3772],"tags":[],"class_list":["post-487362","blog","type-blog","status-publish","format-standard","hentry","category-architecture-engineering-and-construction","industry-architecture-engineering-and-construction"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.9 (Yoast SEO v25.9) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Stormwater Construction Activity Management for Bus Rapid Transit<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/stormwater-construction-activity-management-for-bus-rapid-transit\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Stormwater Construction Activity Management for Bus Rapid Transit\" \/>\n<meta property=\"og:description\" content=\"In the bustling heart of St. Paul, Minnesota, the METRO Gold Line Bus Rapid Transit (BRT) project is underway. Expected to debut in 2025, this transit system will bridge the east metro to the sprawling regional METRO network, uniting communities and commuters across the region. It promises seamless connectivity to employment hubs, housing options, transit [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/stormwater-construction-activity-management-for-bus-rapid-transit\" \/>\n<meta property=\"og:site_name\" content=\"Industry Blogs\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-26T23:41:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/10\/IMG_0126_5050square.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"756\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/stormwater-construction-activity-management-for-bus-rapid-transit\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/stormwater-construction-activity-management-for-bus-rapid-transit\",\"name\":\"Stormwater Construction Activity Management for Bus Rapid Transit\",\"isPartOf\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/stormwater-construction-activity-management-for-bus-rapid-transit#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/stormwater-construction-activity-management-for-bus-rapid-transit#primaryimage\"},\"thumbnailUrl\":\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/10\/IMG_0126_5050square.jpg\",\"datePublished\":\"2023-10-19T14:53:12+00:00\",\"dateModified\":\"2025-08-26T23:41:28+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/stormwater-construction-activity-management-for-bus-rapid-transit#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/stormwater-construction-activity-management-for-bus-rapid-transit\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/stormwater-construction-activity-management-for-bus-rapid-transit#primaryimage\",\"url\":\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/10\/IMG_0126_5050square.jpg\",\"contentUrl\":\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/10\/IMG_0126_5050square.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/stormwater-construction-activity-management-for-bus-rapid-transit#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Stormwater Construction Activity Management for Bus Rapid Transit\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/\",\"name\":\"Industry Blogs\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/8c4f3e5f3a29e928c1e880346bbdeb44\",\"name\":\"Laurence Litrico\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b7f3f8b19f131ed6e172f3a7c766075aadda7afb12d2adff11e7ee8f0234c68a?s=96&d=blank&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b7f3f8b19f131ed6e172f3a7c766075aadda7afb12d2adff11e7ee8f0234c68a?s=96&d=blank&r=g\",\"caption\":\"Laurence Litrico\"},\"url\":\"\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Stormwater Construction Activity Management for Bus Rapid Transit","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/stormwater-construction-activity-management-for-bus-rapid-transit","og_locale":"en_US","og_type":"article","og_title":"Stormwater Construction Activity Management for Bus Rapid Transit","og_description":"In the bustling heart of St. Paul, Minnesota, the METRO Gold Line Bus Rapid Transit (BRT) project is underway. Expected to debut in 2025, this transit system will bridge the east metro to the sprawling regional METRO network, uniting communities and commuters across the region. It promises seamless connectivity to employment hubs, housing options, transit [&hellip;]","og_url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/stormwater-construction-activity-management-for-bus-rapid-transit","og_site_name":"Industry Blogs","article_modified_time":"2025-08-26T23:41:28+00:00","og_image":[{"width":756,"height":800,"url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/10\/IMG_0126_5050square.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/stormwater-construction-activity-management-for-bus-rapid-transit","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/stormwater-construction-activity-management-for-bus-rapid-transit","name":"Stormwater Construction Activity Management for Bus Rapid Transit","isPartOf":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/stormwater-construction-activity-management-for-bus-rapid-transit#primaryimage"},"image":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/stormwater-construction-activity-management-for-bus-rapid-transit#primaryimage"},"thumbnailUrl":"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/10\/IMG_0126_5050square.jpg","datePublished":"2023-10-19T14:53:12+00:00","dateModified":"2025-08-26T23:41:28+00:00","breadcrumb":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/stormwater-construction-activity-management-for-bus-rapid-transit#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/stormwater-construction-activity-management-for-bus-rapid-transit"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/stormwater-construction-activity-management-for-bus-rapid-transit#primaryimage","url":"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/10\/IMG_0126_5050square.jpg","contentUrl":"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2023\/10\/IMG_0126_5050square.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/stormwater-construction-activity-management-for-bus-rapid-transit#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.esri.com\/en-us\/industries\/blog"},{"@type":"ListItem","position":2,"name":"Stormwater Construction Activity Management for Bus Rapid Transit"}]},{"@type":"WebSite","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/","name":"Industry Blogs","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.esri.com\/en-us\/industries\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/8c4f3e5f3a29e928c1e880346bbdeb44","name":"Laurence Litrico","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/b7f3f8b19f131ed6e172f3a7c766075aadda7afb12d2adff11e7ee8f0234c68a?s=96&d=blank&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7f3f8b19f131ed6e172f3a7c766075aadda7afb12d2adff11e7ee8f0234c68a?s=96&d=blank&r=g","caption":"Laurence Litrico"},"url":""}]}},"text_date":"October 19, 2023","author_name":"Esri AEC","author_page":false,"custom_image":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/10\/adobestock-475723784_resized1920x1080.jpg","primary_product":"Architecture, Engineering, and Construction","tag_data":[],"category_data":[{"term_id":3772,"name":"Architecture, Engineering, and Construction","slug":"architecture-engineering-and-construction","term_group":0,"term_taxonomy_id":3772,"taxonomy":"category","description":"","parent":1372,"count":34,"filter":"raw"}],"product_data":{"errors":{"invalid_taxonomy":["Invalid taxonomy."]},"error_data":[]},"primary_product_link":"https:\/\/www.esri.com\/en-us\/industries\/blog\/industry\/architecture-engineering-and-construction","short_description":"Ames Construction implemented the Stormwater Construction Activity Management solution for Bus Rapid Transit in St. Paul, Minnesota","image":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2023\/10\/adobestock-475723784_resized826x465.jpg","_links":{"self":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article\/487362","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article"}],"about":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/types\/blog"}],"author":[{"embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/users\/171"}],"version-history":[{"count":0,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article\/487362\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/media?parent=487362"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/categories?post=487362"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/tags?post=487362"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}