{"id":550572,"date":"2024-11-14T18:49:31","date_gmt":"2024-11-14T18:49:31","guid":{"rendered":"https:\/\/uat.esri.com\/en-us\/industries\/blog\/?post_type=blog&#038;p=550572"},"modified":"2025-04-07T22:19:22","modified_gmt":"2025-04-07T22:19:22","slug":"advanced-planning-and-construction-with-cim-integration","status":"publish","type":"blog","link":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/advanced-planning-and-construction-with-cim-integration","title":{"rendered":"Advanced Planning and Construction with CIM Integration"},"content":{"rendered":"<h3 class=\"has-text-align-center wp-block-heading\" id=\"h-customer-spotlight\"><strong>Customer Spotlight<\/strong><\/h3>\n\n<p class=\"undefined block-editor-paragraph\">Andel owns and operates the electrical distribution grid in eastern Denmark and provides power to 1.5 million customers through the grid companies Cerius and Radius.<\/p>\n\n<h2 class=\"has-text-align-left wp-block-heading\" id=\"h-challenge\"><strong>Challenge<\/strong><\/h2>\n\n<p class=\"undefined block-editor-paragraph\">Andel is expanding their infrastructure to meet growing customer demand. Aging assets, distributed solar\/batteries, additional heat pump load, and electric car charging are all significant drivers at Andel for renewing and extending the grid and optimizing its operation.<\/p>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"860\" height=\"488\" src=\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2024\/11\/large-1-Picture2.png\" alt=\"\" class=\"wp-image-550812\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2024\/11\/large-1-Picture2.png 860w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2024\/11\/large-1-Picture2-300x170.png 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2024\/11\/large-1-Picture2-768x436.png 768w\" sizes=\"auto, (max-width: 860px) 100vw, 860px\" \/><figcaption class=\"wp-element-caption\">Andel is expanding their infrastructure to meet growing customer demand.<\/figcaption><\/figure>\n<\/div>\n\n<p class=\"undefined block-editor-paragraph\">Network data quality is critical to providing an intuitive and consistent viewing and editing experience across the many departments that use network information, and for the safety of operations and quality of service.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">Therefore, the utility requires state-of-the-art geographic information system (GIS) and advanced distribution management system (ADMS) software to enhance productivity, from design and planning to operations. As a merger of two utilities, Andel faced the challenge of consolidating legacy technology systems. It chose to consolidate its legacy geometric network and Intergraph G\/Tech into ArcGIS Utility Network.<\/p>\n\n<h2 class=\"wp-block-heading\" id=\"h-solution\">Solution<\/h2>\n\n<p class=\"undefined block-editor-paragraph\">Andel consolidated two legacy geographic information systems into a future-proof GIS. The detailed Utility Network data model combined with simplified usage enables GIS to be a single source of truth for asset and network data throughout the enterprise. The utility uses ArcGIS Enterprise with Utility Network, a business-critical system that supports network planning, design, construction, operation, and maintenance.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">Andel concluded that Utility Network was the best primary dataset for its two ADMS systems. ArcGIS Utility Network serves as the primary dataset for assets and the electrical model in its normal configuration, while the ADMS systems own the grid\u2019s dynamic configuration.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">Andel sought to benefit from the comprehensive and detailed data model in ArcGIS Utility Network. Their goal was to align the representation of real-world assets in GIS and operational systems, improving the foundation for numerous workflows and spatial analytics.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">Advanced integration software is needed to ensure that both GIS and ADMS always represent the actual state of the grid while also providing support for the complex grid extension and commissioning processes.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">To facilitate the transition, Andel utilizes the Similix Utility Network Migration Suite. It offers an intuitive drag-and-drop interface for mapping between the source system and Utility Network. Its no-code rule engine maintains the configuration of data transformations.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">Building on this improved data and the common information model (CIM), Andel chose the Similix CIM Adaptor for ArcGIS. This product-based solution is configurable to export and synchronize the planned changes to the electrical grid. When the feeder is updated, the CIM Adaptor exports a full or changed feeder as a CIM file known as a difference file. These data updates support both the PSI Energy ADMS and Schneider Electric ADMS.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">Detailed network data must be well-maintained. Andel uses Esri UK\u2019s UNE for ArcGIS (UNE) to manage network data easily. Without specialized GIS training, workers can use this lightweight web app to view, edit, and manage real-time digital twin models of detailed electrical, water, or gas networks.<\/p>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"481\" src=\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2024\/11\/large-2-Picture3-1024x481.png\" alt=\"\" class=\"wp-image-550832\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2024\/11\/large-2-Picture3-1024x481.png 1024w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2024\/11\/large-2-Picture3-300x141.png 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2024\/11\/large-2-Picture3-768x361.png 768w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2024\/11\/large-2-Picture3.png 1284w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Query building is straightforward in UNE for ArcGIS.<\/figcaption><\/figure>\n<\/div>\n\n<p class=\"undefined block-editor-paragraph\">UNE sits seamlessly on top of the ArcGIS system and honors the rules of the Utility Network data model. Its functions enable users to update information with built-in smart editing capabilities. Furthermore, they understand and query the network connectivity and perform traces.<\/p>\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"479\" src=\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2024\/11\/large-3-Picture4-1024x479.png\" alt=\"\" class=\"wp-image-550842\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2024\/11\/large-3-Picture4-1024x479.png 1024w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2024\/11\/large-3-Picture4-300x140.png 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2024\/11\/large-3-Picture4-768x359.png 768w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2024\/11\/large-3-Picture4.png 1188w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Tracing an electric substation in UNE is trouble-free.<\/figcaption><\/figure>\n\n<p class=\"undefined block-editor-paragraph\">UNE is used to design grid extensions and support other workflows. A design is stored in a branch version. Branch versioning is a type of geodatabase versioning that works with the ArcGIS Enterprise Web GIS model. It uses a service-based architecture to allow multiple users to edit and supports long-transaction scenarios through web feature layers.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">This capability supports correct grid representations, particularly for lengthy construction projects. Data is exported to the ADMS systems, where it is staged and inspected before being updated.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">After commissioning, ADMS confirms the design changes are implemented, triggering them to become part of the as-built electrical network. Finally, the Similix CIM Adaptor confirms that the Utility Network data and ADMS systems are in sync.<\/p>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"193\" src=\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2024\/11\/large-process-Picture1-1024x193.png\" class=\"wp-image-550752\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2024\/11\/large-process-Picture1-1024x193.png 1024w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2024\/11\/large-process-Picture1-300x57.png 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2024\/11\/large-process-Picture1-768x145.png 768w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2024\/11\/large-process-Picture1.png 1514w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Use of the CIM adapter facilitates high-quality data for ADMS.<\/figcaption><\/figure>\n<\/div>\n\n<h2 class=\"wp-block-heading\" id=\"h-results\">Results<\/h2>\n\n<p class=\"undefined block-editor-paragraph\">Andel uses high-quality, consistent network data to support various business systems. They use a web-based system for planning and editing, which helps streamline important work processes by making data easy to access and edit, ensuring secure data sharing, and keeping information up to date for better decision-making and operational efficiency.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">The intuitive user interface resulted in:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>An estimated 80 percent reduction in time and training costs for 700 users using the UNE selection and query builder functions. Historically, network queries required knowledge of query expression language. In contrast, UNE provides an intuitive, web-based user experience so anyone in the organization can query the network using a series of drop-down fields. For example, users may quickly locate assets installed within a date range from a specific manufacturer. This information enables maintenance crews to work efficiently and effectively.<\/li>\n<\/ul>\n\n<ul class=\"wp-block-list\">\n<li>A projected 10x productivity increase by streamlining workflows using configurable smart templates. These configurable templates allow users to create complex assets like substations on the fly from a predefined template. Users are prompted to answer questions such as how many medium-voltage and low-voltage switching bays and transformer bays the substation requires. Then, they are created in seconds, along with all the hierarchy and containment rules.<\/li>\n<\/ul>\n\n<ul class=\"wp-block-list\">\n<li>An expected 90 percent reduction in road excavation costs by creating and sharing accurate network data. By extending UNE, Andel created a cross-section capability to view and manage cables within specific underground conduits effectively. With this information, field crews optimize existing conduit infrastructure without excavating new trenches and laying new conduits where capacity already exists.<\/li>\n<\/ul>\n\n<p class=\"undefined block-editor-paragraph\">In conclusion, Andel supports planning and design in a user-friendly web application built directly on Utility Network, which benefits from its service-based structure. Thus, Utility Network enforces the same rules and data quality on all platforms.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">UNE directly supports both field crews and the back office while backing integrated systems with the same data quality. Projects are added to the ADMS before power is turned on. This ensures that both GIS and ADMS are always up to date for employee safety and customer reliability.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">In the future, Andel plans to merge their two ADMS systems into the Schneider Electric EcoStruxure ADMS platform. This effort and any future upgrades will benefit from the new product-based, service-based, standards-based, and configurable GIS and integration system landscape. Additionally, application programming interfaces (APIs) will allow Andel to develop their solutions further.<\/p>\n\n<h2 class=\"wp-block-heading\" id=\"h-partners\">Partners<\/h2>\n\n<p class=\"undefined block-editor-paragraph\"><a href=\"https:\/\/similix.dk\/\">Similix <\/a>delivered the software products and professional services for migration and CIM integration. Andel was the fifth electric utility to go live with Utility Network based on Similix\u2019s Utility Network Migration Suite and CIM Adaptor for ArcGIS. Experience from utilities on three continents shows that, despite other differences, there is a common need for a high-quality data model in GIS that can be easily connected to other business systems. This model should also enforce those systems\u2019 data quality and validation requirements. The CIM Adaptor supports any CIM version and CIM profile, including extensions.<\/p>\n\n<p class=\"undefined block-editor-paragraph\"><a href=\"https:\/\/www.esriuk.com\/en-gb\/home\">Esri UK<\/a> delivered the UNE application for planning, editing, and viewing the Utility Network. Esri UK also provided professional services to extend the commercial off-the-shelf UNE capabilities to meet Andel\u2019s needs and deliver on the abovementioned results.<\/p>\n\n<section class=\"news-blockquote--quote block-editor-quote is-layout-flow wp-block-quote-is-layout-flow\" aria-label=\"Quotation\"><blockquote class=\"news-blockquote-block--quote\"><div class=\"news-blockquote-block--author\"><cite class=\"author--name font-size-0 avenir-bold\"><\/cite><\/div><\/blockquote><\/section>\n\n<p class=\"undefined block-editor-paragraph\">\u201cAs part of a modern network management strategy, we are challenging ourselves to use a web-first approach and find smarter ways of working to optimize our processes and deliver improvements over the whole network management life cycle of design, planning, build, and operation. Working with Similix and Esri UK to deliver this challenge and maximize our investment in ArcGIS Utility Network has been extremely productive. We have enabled our GIS to serve as the master data system for ADMS through CIM-based integration and rolled out an intuitive and focused user experience application to over 700 users. We have been impressed by the technology and the services that Similix and Esri UK have delivered and look forward to continuing our work with them to fully realize our strategic goals.\u201d <\/p>\n\n<p class=\"has-text-align-right block-editor-paragraph\">&#8212; Jakob M\u00f8l Mortensen, Head of Energy Systems, Andel<\/p>","protected":false},"author":121,"featured_media":0,"parent":0,"menu_order":0,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[5662],"tags":[5912,3632,287,5932,5922,343],"class_list":["post-550572","blog","type-blog","status-publish","format-standard","hentry","category-electric-utilities","tag-cim","tag-electric","tag-gis","tag-grid-2","tag-network","tag-utilities","industry-electric-and-gas"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.9 (Yoast SEO v25.9) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Advanced Planning and Construction with CIM Integration<\/title>\n<meta name=\"description\" content=\"Explore how Andel is expanding its electrical grid to meet growing customer demand by integrating advanced GIS and ADMS systems. Learn about the use of ArcGIS Utility Network and Similix CIM Adaptor to enhance data quality, streamline operations, and improve network management. Discover the benefits of a web-first approach and the strategic collaboration with Similix and Esri UK to optimize processes and support future infrastructure upgrades.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/advanced-planning-and-construction-with-cim-integration\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Advanced Planning and Construction with CIM Integration\" \/>\n<meta property=\"og:description\" content=\"Explore how Andel is expanding its electrical grid to meet growing customer demand by integrating advanced GIS and ADMS systems. Learn about the use of ArcGIS Utility Network and Similix CIM Adaptor to enhance data quality, streamline operations, and improve network management. Discover the benefits of a web-first approach and the strategic collaboration with Similix and Esri UK to optimize processes and support future infrastructure upgrades.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/advanced-planning-and-construction-with-cim-integration\" \/>\n<meta property=\"og:site_name\" content=\"Industry Blogs\" \/>\n<meta property=\"article:modified_time\" content=\"2025-04-07T22:19:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2024\/11\/large-1-Picture2.png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/advanced-planning-and-construction-with-cim-integration\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/advanced-planning-and-construction-with-cim-integration\",\"name\":\"Advanced Planning and Construction with CIM Integration\",\"isPartOf\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/advanced-planning-and-construction-with-cim-integration#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/advanced-planning-and-construction-with-cim-integration#primaryimage\"},\"thumbnailUrl\":\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2024\/11\/large-1-Picture2.png\",\"datePublished\":\"2024-11-14T18:49:31+00:00\",\"dateModified\":\"2025-04-07T22:19:22+00:00\",\"description\":\"Explore how Andel is expanding its electrical grid to meet growing customer demand by integrating advanced GIS and ADMS systems. Learn about the use of ArcGIS Utility Network and Similix CIM Adaptor to enhance data quality, streamline operations, and improve network management. Discover the benefits of a web-first approach and the strategic collaboration with Similix and Esri UK to optimize processes and support future infrastructure upgrades.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/advanced-planning-and-construction-with-cim-integration#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/advanced-planning-and-construction-with-cim-integration\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/advanced-planning-and-construction-with-cim-integration#primaryimage\",\"url\":\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2024\/11\/large-1-Picture2.png\",\"contentUrl\":\"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2024\/11\/large-1-Picture2.png\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/advanced-planning-and-construction-with-cim-integration#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Advanced Planning and Construction with CIM Integration\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/\",\"name\":\"Industry Blogs\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/17467d7e034f338b73f33101d5536cc4\",\"name\":\"Pat Hohl\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2020\/09\/648x648Webp.net-resizeimage-150x150.jpg\",\"contentUrl\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2020\/09\/648x648Webp.net-resizeimage-150x150.jpg\",\"caption\":\"Pat Hohl\"},\"description\":\"Pat Hohl, PE is Esri\u2019s Director of Electric Industry Solutions. He oversees the planning and execution of Esri\u2019s go-to-market strategies in the Electric Industry, primarily in the U.S.A. Pat was a pioneer in electric utility GIS technology. He has a broad business background with over 35 years of experience in utility engineering, technology, operations, and executive management. Pat is also an accomplished author, consultant, and university professor.\",\"sameAs\":[\"https:\/\/www.esri.com\/en-us\/industries\/electric-gas-utilities\/segments\/electric\",\"www.linkedin.com\/in\/pat-hohl-pe-64a40821\",\"https:\/\/x.com\/@EsriElectricGas\"],\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/author\/pat-hohl\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Advanced Planning and Construction with CIM Integration","description":"Explore how Andel is expanding its electrical grid to meet growing customer demand by integrating advanced GIS and ADMS systems. Learn about the use of ArcGIS Utility Network and Similix CIM Adaptor to enhance data quality, streamline operations, and improve network management. Discover the benefits of a web-first approach and the strategic collaboration with Similix and Esri UK to optimize processes and support future infrastructure upgrades.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/advanced-planning-and-construction-with-cim-integration","og_locale":"en_US","og_type":"article","og_title":"Advanced Planning and Construction with CIM Integration","og_description":"Explore how Andel is expanding its electrical grid to meet growing customer demand by integrating advanced GIS and ADMS systems. Learn about the use of ArcGIS Utility Network and Similix CIM Adaptor to enhance data quality, streamline operations, and improve network management. Discover the benefits of a web-first approach and the strategic collaboration with Similix and Esri UK to optimize processes and support future infrastructure upgrades.","og_url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/advanced-planning-and-construction-with-cim-integration","og_site_name":"Industry Blogs","article_modified_time":"2025-04-07T22:19:22+00:00","og_image":[{"url":"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2024\/11\/large-1-Picture2.png","type":"","width":"","height":""}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/advanced-planning-and-construction-with-cim-integration","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/advanced-planning-and-construction-with-cim-integration","name":"Advanced Planning and Construction with CIM Integration","isPartOf":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/advanced-planning-and-construction-with-cim-integration#primaryimage"},"image":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/advanced-planning-and-construction-with-cim-integration#primaryimage"},"thumbnailUrl":"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2024\/11\/large-1-Picture2.png","datePublished":"2024-11-14T18:49:31+00:00","dateModified":"2025-04-07T22:19:22+00:00","description":"Explore how Andel is expanding its electrical grid to meet growing customer demand by integrating advanced GIS and ADMS systems. Learn about the use of ArcGIS Utility Network and Similix CIM Adaptor to enhance data quality, streamline operations, and improve network management. Discover the benefits of a web-first approach and the strategic collaboration with Similix and Esri UK to optimize processes and support future infrastructure upgrades.","breadcrumb":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/advanced-planning-and-construction-with-cim-integration#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/advanced-planning-and-construction-with-cim-integration"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/advanced-planning-and-construction-with-cim-integration#primaryimage","url":"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2024\/11\/large-1-Picture2.png","contentUrl":"https:\/\/uat.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2024\/11\/large-1-Picture2.png"},{"@type":"BreadcrumbList","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/advanced-planning-and-construction-with-cim-integration#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.esri.com\/en-us\/industries\/blog"},{"@type":"ListItem","position":2,"name":"Advanced Planning and Construction with CIM Integration"}]},{"@type":"WebSite","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/","name":"Industry Blogs","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.esri.com\/en-us\/industries\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/17467d7e034f338b73f33101d5536cc4","name":"Pat Hohl","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/image\/","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2020\/09\/648x648Webp.net-resizeimage-150x150.jpg","contentUrl":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2020\/09\/648x648Webp.net-resizeimage-150x150.jpg","caption":"Pat Hohl"},"description":"Pat Hohl, PE is Esri\u2019s Director of Electric Industry Solutions. He oversees the planning and execution of Esri\u2019s go-to-market strategies in the Electric Industry, primarily in the U.S.A. Pat was a pioneer in electric utility GIS technology. He has a broad business background with over 35 years of experience in utility engineering, technology, operations, and executive management. Pat is also an accomplished author, consultant, and university professor.","sameAs":["https:\/\/www.esri.com\/en-us\/industries\/electric-gas-utilities\/segments\/electric","www.linkedin.com\/in\/pat-hohl-pe-64a40821","https:\/\/x.com\/@EsriElectricGas"],"url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/author\/pat-hohl"}]}},"text_date":"November 14, 2024","author_name":"Pat Hohl","author_page":"https:\/\/www.esri.com\/en-us\/industries\/blog\/author\/pat-hohl","custom_image":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2024\/11\/1920-1080-adobestock-451875306.jpg","primary_product":"Electric and Gas","tag_data":[{"term_id":5912,"name":"cim","slug":"cim","term_group":0,"term_taxonomy_id":5912,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":3632,"name":"electric","slug":"electric","term_group":0,"term_taxonomy_id":3632,"taxonomy":"post_tag","description":"","parent":0,"count":5,"filter":"raw"},{"term_id":287,"name":"GIS","slug":"gis","term_group":0,"term_taxonomy_id":287,"taxonomy":"post_tag","description":"","parent":0,"count":180,"filter":"raw"},{"term_id":5932,"name":"grid.","slug":"grid-2","term_group":0,"term_taxonomy_id":5932,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":5922,"name":"network","slug":"network","term_group":0,"term_taxonomy_id":5922,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":343,"name":"utilities","slug":"utilities","term_group":0,"term_taxonomy_id":343,"taxonomy":"post_tag","description":"","parent":0,"count":4,"filter":"raw"}],"category_data":[{"term_id":5662,"name":"Electric Utilities","slug":"electric-utilities","term_group":0,"term_taxonomy_id":5662,"taxonomy":"category","description":"","parent":0,"count":13,"filter":"raw"}],"product_data":{"errors":{"invalid_taxonomy":["Invalid taxonomy."]},"error_data":[]},"primary_product_link":"https:\/\/www.esri.com\/en-us\/industries\/blog\/industry\/electric-and-gas","short_description":"Andel plans to add infrastructure using GIS to enhance grid efficiency and support new energy demands.","image":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2024\/11\/826-465-adobestock-451875306.jpg","_links":{"self":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article\/550572","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article"}],"about":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/types\/blog"}],"author":[{"embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/users\/121"}],"version-history":[{"count":0,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article\/550572\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/media?parent=550572"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/categories?post=550572"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/tags?post=550572"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}