{"id":577302,"date":"2025-06-24T20:25:33","date_gmt":"2025-06-24T20:25:33","guid":{"rendered":"https:\/\/www.esri.com\/en-us\/industries\/blog\/?post_type=blog&#038;p=577302"},"modified":"2025-08-12T17:21:25","modified_gmt":"2025-08-12T17:21:25","slug":"phoenix-axis-mpower-modernize-fiber-management","status":"publish","type":"blog","link":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/phoenix-axis-mpower-modernize-fiber-management","title":{"rendered":"Phoenix, Axis, and mPower Modernize Fiber Management for Mansfield Electric"},"content":{"rendered":"<p class=\"undefined block-editor-paragraph\">When you\u2019re a growing utility like Mansfield Municipal Light Department (MMED), not having an accurate fiber GIS mapping system it can turn a simple outage into a multi-day headache. That was the reality facing the New England town as its network grew beyond what spreadsheets could handle. The challenge wasn\u2019t just about infrastructure; it was about risk, accountability, and missed opportunity.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">In today\u2019s world, small towns like Mansfield face mounting pressure to deliver fast, reliable internet\u2014but are often without the same resources as larger cities. Mansfield Municipal Light Department, a municipal utility in New England, was expanding its fiber network, but legacy systems and disjointed records stood in the way. As the complexity of the network grew, so did the risks. That\u2019s when a partnership between Phoenix Communications, Axis Engineering, and mPower Innovations (mPower) stepped in\u2014bringing together field expertise and geospatial technology to rebuild Mansfield\u2019s fiber records from the ground up.<\/p>\n\n<p class=\"undefined block-editor-paragraph\"><strong>The Challenge: Fragmented Data, Real-World Consequences<\/strong><\/p>\n\n<p class=\"undefined block-editor-paragraph\">Mansfield\u2019s network expansion was installed for business economic development reasons. But while fiber was being laid and connected, the utility needed a better way maintain accurate documentation. The existing network mapping and operation was managed by Phoenix Communications using AutoCAD and a manual mapping and modeling system. With no centralized and advanced software platform to manage the infrastructure, teams were often working with incomplete or outdated information. It wasn\u2019t always clear which strands were live, which ones were dark, or where critical connections existed.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">This lack of clarity created a host of issues. When outages occurred, crews had to spend valuable time manually tracing lines to identify the problem. Leasing spare fiber was nearly impossible because available capacity couldn\u2019t be confirmed. And when it came to planning future upgrades, staff had limited tools to model what was already in place. Mansfield needed more than better maps\u2014it needed a smarter system.<\/p>\n\n<p class=\"undefined block-editor-paragraph\"><strong>The Fix: Ground Truth Meets Smart Mapping<\/strong><\/p>\n\n<p class=\"undefined block-editor-paragraph\">Phoenix Communications launched a hands-on effort to document the network\u2019s true state. Their field crews examined each pole, splice case, and cabinet\u2014physically verifying how fibers were routed and where connections were made. At the same time, Axis Engineering entered the data collected into mPower\u2019s FiberProTM platform. mPower didn\u2019t just deliver software; they helped structure how information flowed from boots on the ground into a GIS system Mansfield could rely on every day. This framework ensured the right details were captured once\u2014and used many times across departments and functions. With secure file transfer protocols in place, mPower delivered models that Mansfield could use within their existing IT environment, avoiding unnecessary infrastructure changes.<\/p>\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"573\" src=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2025\/06\/100-11-1024x573.png\" alt=\"\" class=\"wp-image-577498\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/06\/100-11-1024x573.png 1024w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/06\/100-11-300x168.png 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/06\/100-11-768x430.png 768w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/06\/100-11-1536x859.png 1536w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/06\/100-11.png 1680w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<p class=\"undefined block-editor-paragraph\"><strong>What GIS Brought to the Table<\/strong><\/p>\n\n<p class=\"undefined block-editor-paragraph\">This project wasn\u2019t simply about digitizing paper maps. GIS gave Mansfield a new way to understand how fiber connected across neighborhoods, facilities, and municipal departments. It allowed the Engineering &amp; Operations team to see not only where cables ran, but how they related to other assets\u2014like water plants, streetlights, or electrical substations.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">Spatial analysis played a key role in restoring visibility. With GIS, crews could trace the path of a strand, locate nearby splice points, and check for available capacity\u2014all from a tablet in the field. They could also view fiber routes in relation to roads, easements, and municipal boundaries, giving planners a real-world sense of where and how to grow. Instead of reacting to issues, Mansfield gained tools to anticipate and coordinate upgrades and maintenance more effectively.<\/p>\n\n<p class=\"undefined block-editor-paragraph\"><strong>Real Outcomes in the Real World<\/strong><\/p>\n\n<p class=\"undefined block-editor-paragraph\">Today, Mansfield is on its way to having better confidence in its network records. That\u2019s made a measurable difference. Having mPower FiberProTM mapping software, Mansfield can now resolve outages faster because they know what\u2019s in the ground and how it connects. The utility is now able to lease dark fiber because they can verify what\u2019s available. And departments beyond telecom\u2014like water and public works\u2014have started using the GIS tools to manage their infrastructure more effectively.<br>\u201cHaving an accurate, real-time view of our fiber network will dynamically<\/p>\n\n<div class=\"wp-block-image\">\n<figure class=\"alignright size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"758\" src=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2025\/06\/100-9-1-1024x758.png\" alt=\"\" class=\"wp-image-577496\" style=\"width:448px;height:auto\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/06\/100-9-1-1024x758.png 1024w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/06\/100-9-1-300x222.png 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/06\/100-9-1-768x568.png 768w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/06\/100-9-1.png 1311w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n<p class=\"undefined block-editor-paragraph\">\u201cHaving an accurate, real-time view of our fiber network will dynamically improve how we operate,\u201d said Joe Sollecito, General Manager at Mansfield Municipal Light Department. \u201cWe\u2019ve reduced downtime and can finally put underused assets to work.\u201d<\/p>\n\n<p class=\"undefined block-editor-paragraph\">Mark from Axis Engineering added, \u201cWithout mPower\u2019s platform and the integration with ArcGIS, we wouldn\u2019t have been able to deliver this kind of result. We went from rough sketches to a trusted system that Mansfield uses every day.\u201d<\/p>\n\n<p class=\"undefined block-editor-paragraph\"><strong>A Flexible Framework for Other Communities<\/strong><\/p>\n\n<p class=\"undefined block-editor-paragraph\">Mansfield\u2019s approach wasn\u2019t one-size-fits-all\u2014it was built with flexibility in mind. The rollout happened in phases, starting with the fiber serving water treatment facilities. From there, the focus shifted to connecting town hall, and next, to other departments. That phased method made the project more manageable and easier to budget over time.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">What worked in Mansfield is already being repeated elsewhere. Axis and Phoenix have since applied the same audit and GIS-driven design process in neighboring communities. As more towns look to expand broadband access or improve their infrastructure, this model offers a practical and proven path forward.<\/p>\n\n<p class=\"undefined block-editor-paragraph\"><strong>Stronger Together: The Role of Partnership<\/strong><\/p>\n\n<div class=\"wp-block-image\">\n<figure class=\"alignright size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"474\" height=\"474\" src=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2025\/06\/image-1.jpeg\" alt=\"\" class=\"wp-image-578053\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/06\/image-1.jpeg 474w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/06\/image-1-300x300.jpeg 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/06\/image-1-150x150.jpeg 150w\" sizes=\"auto, (max-width: 474px) 100vw, 474px\" \/><\/figure>\n<\/div>\n\n<p class=\"undefined block-editor-paragraph\">This wasn\u2019t a vendor-client relationship, it was a coordinated effort among all parties involved. Phoenix brought deep construction knowledge. Axis translated field work into usable plans. mPower connected it all through technology. And Esri\u2019s ArcGIS served as the foundation, tying together data, workflows, and user access in one system.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">Frequent communication helped the project stay on track. Regular check-ins ensured feedback loops stayed tight. The outcome? A shared understanding among everyone involved\u2014and a product Mansfield could trust.<\/p>\n\n<p class=\"undefined block-editor-paragraph\"><strong>What&#8217;s Next<\/strong><\/p>\n\n<p class=\"undefined block-editor-paragraph\">Mansfield Municipal Light Department \u2019s story is one of progress and success, but certainly not perfection. Their GIS-based system continues to grow as the network evolves. New assets are added, existing routes are refined, and the utility is better equipped for what comes next.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">Other municipalities now have a clear example to follow. With reliable data, smart tools, and the right team in place, digital infrastructure doesn\u2019t have to be a guessing game. For Mansfield, the transformation started with a field audit. Where it leads from here is entirely up to them.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">In the end, projects like this show what\u2019s possible when communities embrace the tools that connect people, systems, and infrastructure. It\u2019s not just about mapping, it\u2019s about empowering utilities to operate smarter and serve better.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">Resources:<\/p>\n\n<p class=\"undefined block-editor-paragraph\">Learn more about <a href=\"http:\/\/www.esri.com\/telecom\">Esri in Telecommunications<\/a><\/p>\n\n<p class=\"undefined block-editor-paragraph\">Learn more about <a href=\"https:\/\/www.mpowerinnovations.com\/\">mPower Innovations<\/a><\/p>\n\n<p class=\"undefined block-editor-paragraph\">Learn more about <a href=\"https:\/\/www.phoenix-fiber.com\/\">Phoenix Fiber<\/a><\/p>","protected":false},"author":562,"featured_media":0,"parent":0,"menu_order":0,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[],"tags":[3632,287,218],"class_list":["post-577302","blog","type-blog","status-publish","format-standard","hentry","tag-electric","tag-gis","tag-telecom","industry-telecommunications"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.9 (Yoast SEO v25.9) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Phoenix, Axis, and MPower Modernize Fiber Management for Mansfield Electric<\/title>\n<meta name=\"description\" content=\"Discover how Mansfield Electric transformed its fiber network with GIS mapping, improving outage response, planning, and asset management.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/phoenix-axis-mpower-modernize-fiber-management\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Phoenix, Axis, and mPower Modernize Fiber Management for Mansfield Electric\" \/>\n<meta property=\"og:description\" content=\"Discover how Mansfield Electric transformed its fiber network with GIS mapping, improving outage response, planning, and asset management.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/phoenix-axis-mpower-modernize-fiber-management\" \/>\n<meta property=\"og:site_name\" content=\"Industry Blogs\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-12T17:21:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/06\/100-11.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1680\" \/>\n\t<meta property=\"og:image:height\" content=\"940\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/phoenix-axis-mpower-modernize-fiber-management\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/phoenix-axis-mpower-modernize-fiber-management\",\"name\":\"Phoenix, Axis, and mPower Modernize Fiber Management for Mansfield Electric\",\"isPartOf\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/phoenix-axis-mpower-modernize-fiber-management#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/phoenix-axis-mpower-modernize-fiber-management#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2025\/06\/100-11-1024x573.png\",\"datePublished\":\"2025-06-24T20:25:33+00:00\",\"dateModified\":\"2025-08-12T17:21:25+00:00\",\"description\":\"Discover how Mansfield Electric transformed its fiber network with GIS mapping, improving outage response, planning, and asset management.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/phoenix-axis-mpower-modernize-fiber-management#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/phoenix-axis-mpower-modernize-fiber-management\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/phoenix-axis-mpower-modernize-fiber-management#primaryimage\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/06\/100-11.png\",\"contentUrl\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/06\/100-11.png\",\"width\":1680,\"height\":940},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/phoenix-axis-mpower-modernize-fiber-management#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Phoenix, Axis, and mPower Modernize Fiber Management for Mansfield Electric\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/\",\"name\":\"Industry Blogs\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/7d169975a7a4eb82482e6b75aad637db\",\"name\":\"Randall Ren\u00e9\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2021\/04\/headshot-150x150.jpg\",\"contentUrl\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2021\/04\/headshot-150x150.jpg\",\"caption\":\"Randall Ren\u00e9\"},\"description\":\"Randall Ren\u00e9 is the Industry Solutions Director for Telecommunications at Esri, where he helps communication service providers leverage geographic information system (GIS) technology to transform workflows and improve communication, collaboration, and productivity across the entire telecom project life cycle. Randall is a proud US Army veteran with 25 years of experience in the telecommunications and cable industries working in the field, guiding GIS teams, and supporting infrastructure planning. He is a passionate advocate within the GIS community and committed to helping public and private sector organizations nationwide bridge the digital divide.\",\"sameAs\":[\"https:\/\/www.linkedin.com\/in\/randall-ren\u00e9-46835810\/\",\"https:\/\/x.com\/Randall_Maps\"],\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/author\/randall-rene\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Phoenix, Axis, and MPower Modernize Fiber Management for Mansfield Electric","description":"Discover how Mansfield Electric transformed its fiber network with GIS mapping, improving outage response, planning, and asset management.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/phoenix-axis-mpower-modernize-fiber-management","og_locale":"en_US","og_type":"article","og_title":"Phoenix, Axis, and mPower Modernize Fiber Management for Mansfield Electric","og_description":"Discover how Mansfield Electric transformed its fiber network with GIS mapping, improving outage response, planning, and asset management.","og_url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/phoenix-axis-mpower-modernize-fiber-management","og_site_name":"Industry Blogs","article_modified_time":"2025-08-12T17:21:25+00:00","og_image":[{"width":1680,"height":940,"url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/06\/100-11.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/phoenix-axis-mpower-modernize-fiber-management","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/phoenix-axis-mpower-modernize-fiber-management","name":"Phoenix, Axis, and mPower Modernize Fiber Management for Mansfield Electric","isPartOf":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/phoenix-axis-mpower-modernize-fiber-management#primaryimage"},"image":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/phoenix-axis-mpower-modernize-fiber-management#primaryimage"},"thumbnailUrl":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2025\/06\/100-11-1024x573.png","datePublished":"2025-06-24T20:25:33+00:00","dateModified":"2025-08-12T17:21:25+00:00","description":"Discover how Mansfield Electric transformed its fiber network with GIS mapping, improving outage response, planning, and asset management.","breadcrumb":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/phoenix-axis-mpower-modernize-fiber-management#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/phoenix-axis-mpower-modernize-fiber-management"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/phoenix-axis-mpower-modernize-fiber-management#primaryimage","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/06\/100-11.png","contentUrl":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/06\/100-11.png","width":1680,"height":940},{"@type":"BreadcrumbList","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/phoenix-axis-mpower-modernize-fiber-management#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.esri.com\/en-us\/industries\/blog"},{"@type":"ListItem","position":2,"name":"Phoenix, Axis, and mPower Modernize Fiber Management for Mansfield Electric"}]},{"@type":"WebSite","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/","name":"Industry Blogs","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.esri.com\/en-us\/industries\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/7d169975a7a4eb82482e6b75aad637db","name":"Randall Ren\u00e9","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/image\/","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2021\/04\/headshot-150x150.jpg","contentUrl":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2021\/04\/headshot-150x150.jpg","caption":"Randall Ren\u00e9"},"description":"Randall Ren\u00e9 is the Industry Solutions Director for Telecommunications at Esri, where he helps communication service providers leverage geographic information system (GIS) technology to transform workflows and improve communication, collaboration, and productivity across the entire telecom project life cycle. Randall is a proud US Army veteran with 25 years of experience in the telecommunications and cable industries working in the field, guiding GIS teams, and supporting infrastructure planning. He is a passionate advocate within the GIS community and committed to helping public and private sector organizations nationwide bridge the digital divide.","sameAs":["https:\/\/www.linkedin.com\/in\/randall-ren\u00e9-46835810\/","https:\/\/x.com\/Randall_Maps"],"url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/author\/randall-rene"}]}},"text_date":"June 24, 2025","author_name":"Randall Ren\u00e9","author_page":"https:\/\/www.esri.com\/en-us\/industries\/blog\/author\/randall-rene","custom_image":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/06\/1920.jpg","primary_product":"Telecommunications","tag_data":[{"term_id":3632,"name":"electric","slug":"electric","term_group":0,"term_taxonomy_id":3632,"taxonomy":"post_tag","description":"","parent":0,"count":5,"filter":"raw"},{"term_id":287,"name":"GIS","slug":"gis","term_group":0,"term_taxonomy_id":287,"taxonomy":"post_tag","description":"","parent":0,"count":180,"filter":"raw"},{"term_id":218,"name":"Telecom","slug":"telecom","term_group":0,"term_taxonomy_id":218,"taxonomy":"post_tag","description":"","parent":0,"count":27,"filter":"raw"}],"category_data":[],"product_data":{"errors":{"invalid_taxonomy":["Invalid taxonomy."]},"error_data":[]},"primary_product_link":"https:\/\/www.esri.com\/en-us\/industries\/blog\/industry\/telecommunications","short_description":"Outages used to take days\u2014now Mansfield Electric fixes them fast with GIS and smart fiber mapping. See how teamwork made it happen.","image":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/06\/826.jpg","_links":{"self":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article\/577302","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article"}],"about":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/types\/blog"}],"author":[{"embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/users\/562"}],"version-history":[{"count":0,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article\/577302\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/media?parent=577302"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/categories?post=577302"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/tags?post=577302"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}