{"id":579145,"date":"2025-10-02T17:52:08","date_gmt":"2025-10-02T17:52:08","guid":{"rendered":"https:\/\/www.esri.com\/en-us\/industries\/blog\/?post_type=blog&#038;p=579145"},"modified":"2025-10-02T18:01:55","modified_gmt":"2025-10-02T18:01:55","slug":"enhancing-inspection-workflows-for-an-electric-cooperative","status":"publish","type":"blog","link":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/enhancing-inspection-workflows-for-an-electric-cooperative","title":{"rendered":"Enhancing Inspection Workflows for an Electric Cooperative"},"content":{"rendered":"<h2 class=\"has-text-align-center wp-block-heading\" id=\"h-a-customer-spotlight\">A Customer Spotlight<\/h2>\n\n<p class=\"undefined block-editor-paragraph\">Wheatland Electric Cooperative (WEC) serves approximately 32,000 meters across a broad service area in central and western Kansas and eastern Colorado. The cooperative operates a complex network of transmission and distribution lines, substations, and other infrastructure. Ensuring the reliability and safety of its service is paramount.<\/p>\n\n<h2 class=\"wp-block-heading\" id=\"h-challenge\">Challenge<\/h2>\n\n<p class=\"undefined block-editor-paragraph\">WEC faced significant challenges related to its manual inspection processes. The cooperative\u2019s mobile crews used forms and spreadsheets to record inspection data, leading to incomplete information and inefficient data analysis. Sometimes, crews had to make return trips due to incomplete information collected during the initial inspection.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">The lack of real-time visibility into inspection and repair progress made it difficult for managers to track the status of work orders. The cooperative needed a more efficient way to manage its inspections and ensure data accuracy. Specifically, it struggled with capturing inspection data in a structured format, analyzing the data, and providing real-time visibility into the progress of inspections and repairs.<\/p>\n\n<h2 class=\"wp-block-heading\" id=\"h-solution\">Solution<\/h2>\n\n<p class=\"undefined block-editor-paragraph\">To address these challenges, the cooperative implemented ArcGIS Field Maps and ArcGIS Dashboards, leveraging its Small Utility Enterprise Agreement. Implementing Field Maps and Dashboards was a strategic decision to modernize the inspection workflow.<\/p>\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1440\" src=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2025\/10\/372-scaled.jpg\" alt=\"\" class=\"wp-image-579148\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/10\/372-scaled.jpg 2560w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/10\/372-1536x864.jpg 1536w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/10\/372-2048x1152.jpg 2048w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/10\/372-826x465.jpg 826w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/10\/372-1920x1080.jpg 1920w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><figcaption class=\"wp-element-caption\">User-friendly mobile apps increased efficiency and tracking. <\/figcaption><\/figure>\n\n<p class=\"undefined block-editor-paragraph\">New mobile inspection forms automatically capture location, time, and inspection details. Field Maps allowed crews to access critical information about assets and infrastructure in real time, improving data accuracy and reducing the risk of errors. The utility also used Dashboards to provide real-time visibility into inspection and repair progress for managers. All viewers see consistent color coding and a single source of truth for inspection status and repair types.<\/p>\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"861\" height=\"561\" src=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2025\/10\/DE-shoe.png\" alt=\"\" class=\"wp-image-579155\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/10\/DE-shoe.png 861w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/10\/DE-shoe-714x465.png 714w\" sizes=\"auto, (max-width: 861px) 100vw, 861px\" \/><figcaption class=\"wp-element-caption\">Dashboards support routine and specialized workflows, such as locating problematic equipment.<\/figcaption><\/figure>\n\n<section class=\"news-blockquote--quote block-editor-quote is-layout-flow wp-block-quote-is-layout-flow\" aria-label=\"Quotation\"><blockquote class=\"news-blockquote-block--quote\"><div class=\"news-blockquote-block--author\"><cite class=\"author--name font-size-0 avenir-bold\"><\/cite><span class=\"author--info font-size--1 avenir-regular\">\u201c We use NISC for our mapping, staking, and OMS, since they are an Esri-based system, everything integrates really well.\u201d Mark Dinkel, GIS-OMS Manager<\/span><\/div><\/blockquote><\/section>\n\n<p class=\"undefined block-editor-paragraph\">The IT team collaborated closely with Esri representatives to design and implement the solution, ensuring a seamless transition from their manual processes.<\/p>\n\n<h2 class=\"wp-block-heading\" id=\"h-results\">Results<\/h2>\n\n<p class=\"undefined block-editor-paragraph\">The implementation of ArcGIS at Wheatland Electric Cooperative yielded significant results, including very positive employee feedback. The main benefits include streamlined fieldwork and reduced time to analyze inspection and repair information.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">The cooperative improved documentation, reduced the time required to analyze inspection and repair information, and enhanced managers\u2019 visibility into inspection and repair progress. The cooperative experienced a notable improvement in the accuracy and completeness of its inspection data, enabling more informed decision-making. According to Curtis Peterson, operations manager, the solution brought \u201cincreased efficiency and tracking to our operations. The maps are very user-friendly as well.\u201d Similarly, WEC addressed other inspection workflows by placing them on the same map, including meters, pad mounts, and instrument-rated meter examinations.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">The cooperative plans to expand its use of Esri solutions, add additional inspection types, and is currently working on a trouble ticket app and a storm app using ArcGIS QuickCapture.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">By leveraging these ArcGIS tools, the cooperative improved real-time data sharing, enhanced mobile\/offline capability, and integrated with existing systems.<\/p>\n\n<section class=\"news-blockquote--quote block-editor-quote is-layout-flow wp-block-quote-is-layout-flow\" aria-label=\"Quotation\"><blockquote class=\"news-blockquote-block--quote\"><div class=\"news-blockquote-block--author\"><cite class=\"author--name font-size-0 avenir-bold\"><\/cite><span class=\"author--info font-size--1 avenir-regular\">\u201cIn the past, it was challenging to keep an accurate pulse on status of our various inspections across our seven districts spread over half the state. With the inspection tools and their dashboards, we now have a comprehensive, real-time view of what\u2019s happening systemwide. This level of visibility allows us to make quicker, better-informed decisions and reallocate resources proactively.\u201d Brandon Barrett, Director of Operations<\/span><\/div><\/blockquote><\/section>","protected":false},"author":121,"featured_media":0,"parent":0,"menu_order":0,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[5662],"tags":[1072,652,5632],"class_list":["post-579145","blog","type-blog","status-publish","format-standard","hentry","category-electric-utilities","tag-electric-and-gas-utilities","tag-infrastructure","tag-inspections","industry-electric-and-gas"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.9 (Yoast SEO v25.9) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Enhancing Inspection Workflows for an Electric Cooperative<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/enhancing-inspection-workflows-for-an-electric-cooperative\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Enhancing Inspection Workflows for an Electric Cooperative\" \/>\n<meta property=\"og:description\" content=\"A Customer Spotlight Wheatland Electric Cooperative (WEC) serves approximately 32,000 meters across a broad service area in central and western Kansas and eastern Colorado. The cooperative operates a complex network of transmission and distribution lines, substations, and other infrastructure. Ensuring the reliability and safety of its service is paramount. Challenge WEC faced significant challenges related [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/enhancing-inspection-workflows-for-an-electric-cooperative\" \/>\n<meta property=\"og:site_name\" content=\"Industry Blogs\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-02T18:01:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/10\/372-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1440\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/enhancing-inspection-workflows-for-an-electric-cooperative\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/enhancing-inspection-workflows-for-an-electric-cooperative\",\"name\":\"Enhancing Inspection Workflows for an Electric Cooperative\",\"isPartOf\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/enhancing-inspection-workflows-for-an-electric-cooperative#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/enhancing-inspection-workflows-for-an-electric-cooperative#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2025\/10\/372-scaled.jpg\",\"datePublished\":\"2025-10-02T17:52:08+00:00\",\"dateModified\":\"2025-10-02T18:01:55+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/enhancing-inspection-workflows-for-an-electric-cooperative#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/enhancing-inspection-workflows-for-an-electric-cooperative\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/enhancing-inspection-workflows-for-an-electric-cooperative#primaryimage\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/10\/372-scaled.jpg\",\"contentUrl\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/10\/372-scaled.jpg\",\"width\":2560,\"height\":1440,\"caption\":\"User-friendly mobile apps increased efficiency and tracking.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/enhancing-inspection-workflows-for-an-electric-cooperative#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Enhancing Inspection Workflows for an Electric Cooperative\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/\",\"name\":\"Industry Blogs\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/17467d7e034f338b73f33101d5536cc4\",\"name\":\"Pat Hohl\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2020\/09\/648x648Webp.net-resizeimage-150x150.jpg\",\"contentUrl\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2020\/09\/648x648Webp.net-resizeimage-150x150.jpg\",\"caption\":\"Pat Hohl\"},\"description\":\"Pat Hohl, PE is Esri\u2019s Director of Electric Industry Solutions. He oversees the planning and execution of Esri\u2019s go-to-market strategies in the Electric Industry, primarily in the U.S.A. Pat was a pioneer in electric utility GIS technology. He has a broad business background with over 35 years of experience in utility engineering, technology, operations, and executive management. Pat is also an accomplished author, consultant, and university professor.\",\"sameAs\":[\"https:\/\/www.esri.com\/en-us\/industries\/electric-gas-utilities\/segments\/electric\",\"www.linkedin.com\/in\/pat-hohl-pe-64a40821\",\"https:\/\/x.com\/@EsriElectricGas\"],\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/author\/pat-hohl\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Enhancing Inspection Workflows for an Electric Cooperative","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/enhancing-inspection-workflows-for-an-electric-cooperative","og_locale":"en_US","og_type":"article","og_title":"Enhancing Inspection Workflows for an Electric Cooperative","og_description":"A Customer Spotlight Wheatland Electric Cooperative (WEC) serves approximately 32,000 meters across a broad service area in central and western Kansas and eastern Colorado. The cooperative operates a complex network of transmission and distribution lines, substations, and other infrastructure. Ensuring the reliability and safety of its service is paramount. Challenge WEC faced significant challenges related [&hellip;]","og_url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/enhancing-inspection-workflows-for-an-electric-cooperative","og_site_name":"Industry Blogs","article_modified_time":"2025-10-02T18:01:55+00:00","og_image":[{"width":2560,"height":1440,"url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/10\/372-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/enhancing-inspection-workflows-for-an-electric-cooperative","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/enhancing-inspection-workflows-for-an-electric-cooperative","name":"Enhancing Inspection Workflows for an Electric Cooperative","isPartOf":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/enhancing-inspection-workflows-for-an-electric-cooperative#primaryimage"},"image":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/enhancing-inspection-workflows-for-an-electric-cooperative#primaryimage"},"thumbnailUrl":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2025\/10\/372-scaled.jpg","datePublished":"2025-10-02T17:52:08+00:00","dateModified":"2025-10-02T18:01:55+00:00","breadcrumb":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/enhancing-inspection-workflows-for-an-electric-cooperative#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/enhancing-inspection-workflows-for-an-electric-cooperative"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/enhancing-inspection-workflows-for-an-electric-cooperative#primaryimage","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/10\/372-scaled.jpg","contentUrl":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/10\/372-scaled.jpg","width":2560,"height":1440,"caption":"User-friendly mobile apps increased efficiency and tracking."},{"@type":"BreadcrumbList","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/enhancing-inspection-workflows-for-an-electric-cooperative#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.esri.com\/en-us\/industries\/blog"},{"@type":"ListItem","position":2,"name":"Enhancing Inspection Workflows for an Electric Cooperative"}]},{"@type":"WebSite","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/","name":"Industry Blogs","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.esri.com\/en-us\/industries\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/17467d7e034f338b73f33101d5536cc4","name":"Pat Hohl","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/image\/","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2020\/09\/648x648Webp.net-resizeimage-150x150.jpg","contentUrl":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2020\/09\/648x648Webp.net-resizeimage-150x150.jpg","caption":"Pat Hohl"},"description":"Pat Hohl, PE is Esri\u2019s Director of Electric Industry Solutions. He oversees the planning and execution of Esri\u2019s go-to-market strategies in the Electric Industry, primarily in the U.S.A. Pat was a pioneer in electric utility GIS technology. He has a broad business background with over 35 years of experience in utility engineering, technology, operations, and executive management. Pat is also an accomplished author, consultant, and university professor.","sameAs":["https:\/\/www.esri.com\/en-us\/industries\/electric-gas-utilities\/segments\/electric","www.linkedin.com\/in\/pat-hohl-pe-64a40821","https:\/\/x.com\/@EsriElectricGas"],"url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/author\/pat-hohl"}]}},"text_date":"October 2, 2025","author_name":"Esri Infrastructure","author_page":"https:\/\/www.esri.com\/en-us\/industries\/blog\/author\/esri-infrastructure","custom_image":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/10\/resized_wide_1920x1080.jpg","primary_product":"Electric and Gas","tag_data":[{"term_id":1072,"name":"Electric and Gas Utilities","slug":"electric-and-gas-utilities","term_group":0,"term_taxonomy_id":1072,"taxonomy":"post_tag","description":"","parent":0,"count":4,"filter":"raw"},{"term_id":652,"name":"Infrastructure","slug":"infrastructure","term_group":0,"term_taxonomy_id":652,"taxonomy":"post_tag","description":"","parent":0,"count":43,"filter":"raw"},{"term_id":5632,"name":"inspections","slug":"inspections","term_group":0,"term_taxonomy_id":5632,"taxonomy":"post_tag","description":"","parent":0,"count":3,"filter":"raw"}],"category_data":[{"term_id":5662,"name":"Electric Utilities","slug":"electric-utilities","term_group":0,"term_taxonomy_id":5662,"taxonomy":"category","description":"","parent":0,"count":13,"filter":"raw"}],"product_data":{"errors":{"invalid_taxonomy":["Invalid taxonomy."]},"error_data":[]},"primary_product_link":"https:\/\/www.esri.com\/en-us\/industries\/blog\/industry\/electric-and-gas","short_description":"Wheatland Electric streamlined fieldwork and reduced the time to analyze inspection and repair information.","image":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/10\/resized_826x465.jpg","_links":{"self":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article\/579145","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article"}],"about":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/types\/blog"}],"author":[{"embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/users\/121"}],"version-history":[{"count":0,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article\/579145\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/media?parent=579145"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/categories?post=579145"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/tags?post=579145"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}