{"id":579603,"date":"2025-11-06T21:43:37","date_gmt":"2025-11-06T21:43:37","guid":{"rendered":"https:\/\/www.esri.com\/en-us\/industries\/blog\/?post_type=blog&#038;p=579603"},"modified":"2025-11-07T17:29:40","modified_gmt":"2025-11-07T17:29:40","slug":"transforming-major-infrastructure-and-tunneling-projects-with-arcgis","status":"publish","type":"blog","link":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/transforming-major-infrastructure-and-tunneling-projects-with-arcgis","title":{"rendered":"Transforming Major Infrastructure and Tunneling Projects with ArcGIS"},"content":{"rendered":"<p class=\"undefined block-editor-paragraph\">ACCIONA Construction Australia is a Tier 1 infrastructure and tunneling contractor, recognized for delivering some of the most technically complex and environmentally sustainable engineering projects across Australia, spanning transport infrastructure, renewable energy, and water solutions.<\/p>\n\n<p class=\"undefined block-editor-paragraph\">ACCIONA Australia is at the forefront of Sydney\u2019s most ambitious infrastructure expansion, delivering multibillion-dollar projects such as <strong>Sydney Metro West \u2013 Central Tunnelling Package<\/strong>, the<strong> Western Harbour Tunnel, <\/strong>and the<strong> WestConnex M4-M5 Link Tunnels.<\/strong> These projects span some of the most densely populated urban corridors in the country and demand unprecedented precision, coordination, and innovation.&nbsp;<\/p>\n\n<p class=\"undefined block-editor-paragraph\">To meet these demands, ACCIONA required a centralized, intelligent, and interoperable data environment capable of integrating vast amounts of geospatial and engineering data. This environment needed to serve a wide range of stakeholders\u2014from field engineers to design consultants to project managers\u2014while bridging the gap between design, construction, and operations.<\/p>\n\n<h2 class=\"wp-block-heading\" id=\"h-challenge\">Challenge<\/h2>\n\n<p class=\"undefined block-editor-paragraph\">Despite operating in a digitally advanced environment, ACCIONA faced fragmented data workflows that hindered efficiency and increased project risk. Tunneling progress was historically tracked in static PDF shift reports, which lacked spatial context and made it difficult for nontechnical stakeholders to interpret performance. Property condition surveys were stored in sprawling Excel spreadsheets with no geographic visualization, complicating prioritization and follow-up. Environmental monitoring processes were inconsistent, and incidents such as unauthorized water discharges highlighted the urgent need for standardized digital compliance tools.&nbsp;<\/p>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"554\" src=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2025\/11\/WHT-Shift-Report_with-border-1024x554.jpg\" alt=\"\" class=\"wp-image-579833\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/WHT-Shift-Report_with-border-1024x554.jpg 1024w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/WHT-Shift-Report_with-border-300x162.jpg 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/WHT-Shift-Report_with-border-768x415.jpg 768w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/WHT-Shift-Report_with-border.jpg 1352w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Daily PDF report<\/figcaption><\/figure>\n<\/div>\n\n<p class=\"undefined block-editor-paragraph\">These disconnected systems created version control issues, coordination gaps, and delays in decision-making. They also made it harder to optimize resources, track progress against plans, and meet growing demands for transparency, sustainability, and efficiency.<\/p>\n\n<h2 class=\"wp-block-heading\" id=\"h-solution\">Solution<\/h2>\n\n<p class=\"undefined block-editor-paragraph\">ACCIONA implemented a comprehensive <a href=\"https:\/\/www.esri.com\/en-us\/arcgis\/geospatial-platform\/overview\" target=\"_blank\" rel=\"noreferrer noopener\">ArcGIS<\/a> infrastructure across its tunneling and infrastructure portfolio, making GIS a foundational element of its common data environment. This transformation was not simply a digitization of existing workflows but a complete rethinking of how projects were delivered.&nbsp;<\/p>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"556\" src=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2025\/11\/WHT-Property-Condition-Dashboard.2_with-border-1-1024x556.png\" alt=\"\" class=\"wp-image-579826\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/WHT-Property-Condition-Dashboard.2_with-border-1-1024x556.png 1024w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/WHT-Property-Condition-Dashboard.2_with-border-1-300x163.png 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/WHT-Property-Condition-Dashboard.2_with-border-1-768x417.png 768w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/WHT-Property-Condition-Dashboard.2_with-border-1.png 1221w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Property condition survey and damage claim tracking dashboard<\/figcaption><\/figure>\n<\/div>\n\n<p class=\"undefined block-editor-paragraph\">For tunnel excavation tracking, ACCIONA replaced static shift reports with a time-enabled <a href=\"https:\/\/www.esri.com\/en-us\/arcgis\/products\/arcgis-dashboards\/overview\" target=\"_blank\" rel=\"noreferrer noopener\">dashboard<\/a> built using ArcGIS linear referencing. This allowed excavation progress to be visualized in real time, showing tunneling machine performance, geotechnical conditions, and rate of advance in an intuitive and actionable format. Property condition surveys were migrated from spreadsheets into a centralized and interactive map-driven tracker, enabling teams to visualize inspection status for properties within 50 meters of tunnel alignment, identify trends, and coordinate follow-up actions more effectively.&nbsp;<\/p>\n\n<p class=\"undefined block-editor-paragraph\">Environmental accountability was strengthened through the deployment of <a href=\"https:\/\/www.esri.com\/en-us\/arcgis\/products\/arcgis-survey123\/overview\" target=\"_blank\" rel=\"noreferrer noopener\">ArcGIS Survey123<\/a>, which standardized quality inspections, asset inspections, field checklists, and commissioning processes.<\/p>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"337\" height=\"479\" src=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2025\/11\/Survey.png\" alt=\"\" class=\"wp-image-579813\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/Survey.png 337w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/Survey-211x300.png 211w\" sizes=\"auto, (max-width: 337px) 100vw, 337px\" \/><figcaption class=\"wp-element-caption\">Standardised Survey123 form checklists<\/figcaption><\/figure>\n<\/div>\n\n<p class=\"undefined block-editor-paragraph\">This improved compliance, enhanced data accuracy, and enabled proactive monitoring to prevent future incidents. By embedding ArcGIS into its workflows, ACCIONA empowered engineers, planners, and managers with live, geospatially contextualized project information. Collaboration was enhanced through map-based dashboards, mobile field access, and seamless data sharing between contractors, consultants, and clients. Environmental and community datasets were incorporated earlier in the design process, supporting sustainability and resilience planning from the outset.<\/p>\n\n<h2 class=\"wp-block-heading\" id=\"h-results\">Results<\/h2>\n\n<p class=\"undefined block-editor-paragraph\">The integration of ArcGIS into ACCIONA\u2019s operations has delivered significant and measurable benefits. Planning efficiency has improved through faster route and alignment analysis based on real-time spatial constraints. Coordination across teams became more effective, reducing rework and miscommunication. Decision-making was enhanced, with leadership able to act on actionable insights grounded in location intelligence. Sustainability outcomes improved as environmental datasets were integrated earlier in the design process, leading to better results for both construction and community impact.&nbsp;<\/p>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"538\" src=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2025\/11\/WHT-Tunnelling-Dashboard_with-border-1024x538.png\" alt=\"\" class=\"wp-image-579831\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/WHT-Tunnelling-Dashboard_with-border-1024x538.png 1024w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/WHT-Tunnelling-Dashboard_with-border-300x157.png 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/WHT-Tunnelling-Dashboard_with-border-768x403.png 768w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/WHT-Tunnelling-Dashboard_with-border-1536x806.png 1536w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/WHT-Tunnelling-Dashboard_with-border.png 1886w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Monitoring tunnel excavation<\/figcaption><\/figure>\n<\/div>\n\n<p class=\"undefined block-editor-paragraph\">Excavation tracking, site coordination, and data transparency have all advanced considerably. Stakeholder communication is now supported by accessible, real-time dashboards, while mobile field teams operate with tools that reduce errors, improve efficiency, and ensure compliance. Most importantly, GIS has evolved from a support function into a core pillar of project delivery, influencing everything from tunneling operations to environmental management and long-term asset planning.&nbsp;<\/p>\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"385\" src=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2025\/11\/Quote-Photoshop-1024x385.jpg\" alt=\"\" class=\"wp-image-579780\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/Quote-Photoshop-1024x385.jpg 1024w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/Quote-Photoshop-300x113.jpg 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/Quote-Photoshop-768x289.jpg 768w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/Quote-Photoshop-1536x578.jpg 1536w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/Quote-Photoshop-2048x770.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<p class=\"undefined block-editor-paragraph\">By making GIS a strategic pillar of project delivery, ACCIONA has set a new benchmark for efficiency, transparency, and innovation in the global AEC industry. The integration of ArcGIS into its common data environment has unified data, streamlined collaboration, and ensured that every stakeholder operates from a single source of truth. This transformation has accelerated project timelines, reduced operational risks, and improved community and environmental outcomes\u2014proving that spatial awareness, when turned into strategic insight, can redefine what is possible in modern infrastructure delivery.<\/p>\n\n<h1 class=\"has-text-align-center wp-block-heading\" id=\"h-learn-more-about-location-intelligence-for-aec\"><strong>Learn more about location intelligence for AEC:<\/strong><\/h1>\n\n<p class=\"has-text-align-center block-editor-paragraph\"><a href=\"https:\/\/www.esri.com\/en-us\/industries\/aec\/overview\" target=\"_blank\" rel=\"noreferrer noopener\">GIS for Architecture, Engineering, and Construction.<\/a><\/p>\n\n<h1 class=\"has-text-align-center wp-block-heading\" id=\"h-stay-connected-with-esri-s-aec-team\"><strong>Stay Connected with Esri\u2019s AEC Team:<\/strong><\/h1>\n\n<p class=\"has-text-align-center block-editor-paragraph\"><a href=\"https:\/\/www.esri.com\/en-us\/c\/industry\/aec\/aec-enewsletter-signup\" target=\"_blank\" rel=\"noreferrer noopener\">Subscribe to the AEC industry newsletter<\/a>&nbsp;\u201cEsri News for AEC\u201d.<\/p>","protected":false},"author":171,"featured_media":0,"parent":0,"menu_order":0,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[],"tags":[],"class_list":["post-579603","blog","type-blog","status-publish","format-standard","hentry","industry-architecture-engineering-and-construction"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.9 (Yoast SEO v25.9) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Transforming Major Infrastructure and Tunneling Projects with ArcGIS<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/transforming-major-infrastructure-and-tunneling-projects-with-arcgis\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Transforming Major Infrastructure and Tunneling Projects with ArcGIS\" \/>\n<meta property=\"og:description\" content=\"ACCIONA Construction Australia is a Tier 1 infrastructure and tunneling contractor, recognized for delivering some of the most technically complex and environmentally sustainable engineering projects across Australia, spanning transport infrastructure, renewable energy, and water solutions. ACCIONA Australia is at the forefront of Sydney\u2019s most ambitious infrastructure expansion, delivering multibillion-dollar projects such as Sydney Metro West [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/transforming-major-infrastructure-and-tunneling-projects-with-arcgis\" \/>\n<meta property=\"og:site_name\" content=\"Industry Blogs\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-07T17:29:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/WHT-Shift-Report_with-border.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1352\" \/>\n\t<meta property=\"og:image:height\" content=\"731\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/transforming-major-infrastructure-and-tunneling-projects-with-arcgis\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/transforming-major-infrastructure-and-tunneling-projects-with-arcgis\",\"name\":\"Transforming Major Infrastructure and Tunneling Projects with ArcGIS\",\"isPartOf\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/transforming-major-infrastructure-and-tunneling-projects-with-arcgis#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/transforming-major-infrastructure-and-tunneling-projects-with-arcgis#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2025\/11\/WHT-Shift-Report_with-border-1024x554.jpg\",\"datePublished\":\"2025-11-06T21:43:37+00:00\",\"dateModified\":\"2025-11-07T17:29:40+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/transforming-major-infrastructure-and-tunneling-projects-with-arcgis#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/transforming-major-infrastructure-and-tunneling-projects-with-arcgis\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/transforming-major-infrastructure-and-tunneling-projects-with-arcgis#primaryimage\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/WHT-Shift-Report_with-border.jpg\",\"contentUrl\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/WHT-Shift-Report_with-border.jpg\",\"width\":1352,\"height\":731},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/transforming-major-infrastructure-and-tunneling-projects-with-arcgis#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Transforming Major Infrastructure and Tunneling Projects with ArcGIS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/\",\"name\":\"Industry Blogs\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/8c4f3e5f3a29e928c1e880346bbdeb44\",\"name\":\"Laurence Litrico\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b7f3f8b19f131ed6e172f3a7c766075aadda7afb12d2adff11e7ee8f0234c68a?s=96&d=blank&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b7f3f8b19f131ed6e172f3a7c766075aadda7afb12d2adff11e7ee8f0234c68a?s=96&d=blank&r=g\",\"caption\":\"Laurence Litrico\"},\"url\":\"\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Transforming Major Infrastructure and Tunneling Projects with ArcGIS","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/transforming-major-infrastructure-and-tunneling-projects-with-arcgis","og_locale":"en_US","og_type":"article","og_title":"Transforming Major Infrastructure and Tunneling Projects with ArcGIS","og_description":"ACCIONA Construction Australia is a Tier 1 infrastructure and tunneling contractor, recognized for delivering some of the most technically complex and environmentally sustainable engineering projects across Australia, spanning transport infrastructure, renewable energy, and water solutions. ACCIONA Australia is at the forefront of Sydney\u2019s most ambitious infrastructure expansion, delivering multibillion-dollar projects such as Sydney Metro West [&hellip;]","og_url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/transforming-major-infrastructure-and-tunneling-projects-with-arcgis","og_site_name":"Industry Blogs","article_modified_time":"2025-11-07T17:29:40+00:00","og_image":[{"width":1352,"height":731,"url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/WHT-Shift-Report_with-border.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/transforming-major-infrastructure-and-tunneling-projects-with-arcgis","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/transforming-major-infrastructure-and-tunneling-projects-with-arcgis","name":"Transforming Major Infrastructure and Tunneling Projects with ArcGIS","isPartOf":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/transforming-major-infrastructure-and-tunneling-projects-with-arcgis#primaryimage"},"image":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/transforming-major-infrastructure-and-tunneling-projects-with-arcgis#primaryimage"},"thumbnailUrl":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-content\/uploads\/2025\/11\/WHT-Shift-Report_with-border-1024x554.jpg","datePublished":"2025-11-06T21:43:37+00:00","dateModified":"2025-11-07T17:29:40+00:00","breadcrumb":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/transforming-major-infrastructure-and-tunneling-projects-with-arcgis#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/transforming-major-infrastructure-and-tunneling-projects-with-arcgis"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/transforming-major-infrastructure-and-tunneling-projects-with-arcgis#primaryimage","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/WHT-Shift-Report_with-border.jpg","contentUrl":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/WHT-Shift-Report_with-border.jpg","width":1352,"height":731},{"@type":"BreadcrumbList","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/transforming-major-infrastructure-and-tunneling-projects-with-arcgis#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.esri.com\/en-us\/industries\/blog"},{"@type":"ListItem","position":2,"name":"Transforming Major Infrastructure and Tunneling Projects with ArcGIS"}]},{"@type":"WebSite","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/","name":"Industry Blogs","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.esri.com\/en-us\/industries\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/8c4f3e5f3a29e928c1e880346bbdeb44","name":"Laurence Litrico","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/b7f3f8b19f131ed6e172f3a7c766075aadda7afb12d2adff11e7ee8f0234c68a?s=96&d=blank&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7f3f8b19f131ed6e172f3a7c766075aadda7afb12d2adff11e7ee8f0234c68a?s=96&d=blank&r=g","caption":"Laurence Litrico"},"url":""}]}},"text_date":"November 6, 2025","author_name":"Esri AEC","author_page":false,"custom_image":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2025\/11\/Banner1.jpg","primary_product":"Architecture, Engineering, and Construction","tag_data":[],"category_data":[],"product_data":{"errors":{"invalid_taxonomy":["Invalid taxonomy."]},"error_data":[]},"primary_product_link":"https:\/\/www.esri.com\/en-us\/industries\/blog\/industry\/architecture-engineering-and-construction","short_description":"ACCIONA uses ArcGIS to unify data, boost efficiency, sustainability, and collaboration in major tunneling and infrastructure projects.","image":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2018\/01\/Newsroom-Keyart-Wide-1920-x-1080.jpg","_links":{"self":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article\/579603","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article"}],"about":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/types\/blog"}],"author":[{"embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/users\/171"}],"version-history":[{"count":0,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article\/579603\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/media?parent=579603"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/categories?post=579603"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/tags?post=579603"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}