{"id":586244,"date":"2026-08-13T00:19:51","date_gmt":"2026-08-13T00:19:51","guid":{"rendered":"https:\/\/www.esri.com\/en-us\/industries\/blog\/?post_type=blog&#038;p=586244"},"modified":"2026-08-13T00:22:47","modified_gmt":"2026-08-13T00:22:47","slug":"pw-gis-centric-permitting-arcgis-trimble-unity-permit-webinar","status":"publish","type":"blog","link":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/pw-gis-centric-permitting-arcgis-trimble-unity-permit-webinar","title":{"rendered":"Your Community Can\u2019t Afford Inefficient Permitting: Let Esri and Trimble Show You What\u2019s Possible with GIS-Centric Permitting"},"content":{"rendered":"<p class=\"wp-block-paragraph\">When it comes to permitting, local government organizations often face end-to-end workflow, data, records, and coordination challenges. The strongest evidence appears in permitting processes that rely on downloadable PDFs, email routing, paper signatures, spreadsheets, legacy portals, disconnected work order systems, and inconsistent status data. These inefficiencies drastically slow permit processing.<\/p>\n\n<p class=\"wp-block-paragraph\">In today\u2019s competitive environment for community growth, time is money. Inefficient permitting can drive development opportunities elsewhere.<\/p>\n\n<p class=\"wp-block-paragraph\"><strong>Signs Your Permitting Process Is Holding Your Community Back<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\">Organizations experiencing inefficient permitting often share common characteristics:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>\u201cDownload this PDF and email it\u201d is the primary service path.<\/li>\n\n<li>No status lookup is available, statuses are unclear, or the process lacks transparency.<\/li>\n\n<li>Applicants must call or email for updates.<\/li>\n\n<li>Separate portals exist for related permitting activities.<\/li>\n\n<li>Current forms or PDFs are not accessible.<\/li>\n\n<li>Public maps are static PDFs instead of operational dashboards.<\/li>\n\n<li>Compliance reporting requires extensive manual data gathering.<\/li>\n\n<li>Field crews cannot attach photos, update status, or work offline.<\/li>\n<\/ul>\n\n<p class=\"wp-block-paragraph\">The operational impacts are significant, including:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>Increased cycle times and permit backlogs<\/li>\n\n<li>Duplicate data entry<\/li>\n\n<li>Lack of transparency and auditability<\/li>\n\n<li>Reduced productivity<\/li>\n\n<li>Diminished interdepartmental coordination<\/li>\n\n<li>Poor citizen experience<\/li>\n\n<li>Lack of trust<\/li>\n<\/ul>\n\n<p class=\"wp-block-paragraph\"><strong>The Cost of Waiting Is Greater Than the Cost of Change<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\">Unfortunately, modernization of the permitting process can no longer wait. A recent article from NTT Data, <a href=\"https:\/\/www.nttdata.com\/en-us\/insights\/blog\/public-sector-modernization\" target=\"_blank\" rel=\"noreferrer noopener\">Public sector modernization: Why the cost of waiting is now greater than the cost of change<\/a>, says, \u201cThe biggest risk facing state and local governments is waiting too long to modernize.\u201d It goes on to say, \u201cThe truth is that it costs more to keep old systems running than to upgrade them. When you factor in growing cybersecurity risks, rising public expectations and the groundwork needed for AI, the numbers make even more sense.\u201d<\/p>\n\n<p class=\"wp-block-paragraph\">The article identifies three key modernization priorities:<\/p>\n\n<ol start=\"1\" class=\"wp-block-list\">\n<li>Build a trusted data foundation.<\/li>\n\n<li>Prioritize services that have the greatest impact on the public.<\/li>\n\n<li>Establish a modernization operating model.<\/li>\n<\/ol>\n\n<p class=\"wp-block-paragraph\"><strong>Modernization Requires More Than Putting PDFs Online<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\">Best practices dictate that modernization must go beyond \u201cput the PDF online.\u201d Instead, use business process modernization that includes:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>Capturing structured data once<\/li>\n\n<li>Routing work through governed workflows<\/li>\n\n<li>Connecting to GIS\/assets\/records<\/li>\n\n<li>Exposing operational status and performance measures<\/li>\n<\/ul>\n\n<section class=\"news-blockquote--quote block-editor-quote\" aria-label=\"Quotation\"><blockquote class=\"news-blockquote-block--quote single-quote\"><p>An important point to remember is that if budgets are tight, the only way to do more with less is to implement proven technology.<\/p><\/blockquote><\/section>\n\n<p class=\"wp-block-paragraph\"><strong>Why GIS-Centric Permitting Matters<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\">Fear not if you are in this situation. Industry leaders, Esri and Trimble have partnered to provide the leading GIS-centric permitting solution, <a href=\"https:\/\/www.trimble.com\/en\/products\/trimble-unity-permit\" target=\"_blank\" rel=\"noreferrer noopener\">Trimble Unity Permit<\/a>.<\/p>\n\n<p class=\"wp-block-paragraph\">Permitting is a location-based workflow. Built by Esri, ArcGIS, the world\u2019s most powerful GIS software, is the mission-critical, enterprise IT business system that turns location data into insight, powering better decision-making and delivering significant business value.<\/p>\n\n<p class=\"wp-block-paragraph\"><strong>GIS Is More Than Digital Mapping<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\">There is a distinct difference between digital mapping and GIS. Digital maps help us communicate where things are. GIS helps us run smarter business operations like permitting.<\/p>\n\n<p class=\"wp-block-paragraph\">GIS can:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>Manage authoritative asset data<\/li>\n\n<li>Connect work orders and inspections<\/li>\n\n<li>Analyze patterns and trends<\/li>\n\n<li>Support capital planning<\/li>\n\n<li>Verify regulatory compliance<\/li>\n\n<li>Enable faster, more defensible decision-making<\/li>\n<\/ul>\n\n<p class=\"wp-block-paragraph\">Trimble Unity Permit is built to work with ArcGIS mapping and spatial capabilities. Without GIS-based permitting, your ability to consistently and efficiently meet the growing and evolving needs of your community is severely hampered.<\/p>\n\n<p class=\"wp-block-paragraph\"><strong>Real-World Success Stories<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\">Organizations from across the U.S. are realizing the benefits of Permit.<\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong><a href=\"https:\/\/www.esri.com\/en-us\/lg\/industry\/public-works\/stories\/city-of-racine-modernizes-asset-permit-management\" target=\"_blank\" rel=\"noreferrer noopener\">Racine, WI<\/a> \u2013 modernized asset and permit management with ArcGIS and Trimble Unity\u00a0<\/strong><\/li>\n\n<li><strong><a href=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/city-of-round-rock-streamlines-permitting\" target=\"_blank\" rel=\"noreferrer noopener\">Round Rock, TX<\/a> \u2013 streamlines permitting and asset life cycle management with GIS-centric Trimble solutions\u00a0<\/strong><\/li>\n\n<li><strong><a href=\"https:\/\/www.trimble.com\/en\/resources\/construction\/case-study\/salt-lake-city-department-of-public-utilities\" target=\"_blank\" rel=\"noreferrer noopener\">Salt Lake City, UT<\/a> \u2013 reclaims twenty hours of monthly productivity while gaining total visibility into the entire asset lifecycle\u00a0<\/strong><\/li>\n<\/ul>\n\n<p class=\"wp-block-paragraph\">They are making permitting faster and more predictable, replacing confusion with clarity, and delivering peace of mind with built-in safeguards. They are also solving problems, improving their organization, and enhancing their communities.<\/p>\n\n<p class=\"wp-block-paragraph\"><strong>See GIS-Centric Permitting in Action<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\">Join Esri, Trimble, and <a href=\"https:\/\/www.esri.com\/en-us\/lg\/industry\/government\/stories\/metroconnects-modernizes-permitting-development-with-arcgis\" target=\"_blank\" rel=\"noreferrer noopener\">MetroConnects<\/a>, a wastewater utility in rapidly growing Greenville Co., SC, for a webinar to and see how they are transforming community growth through GIS-centric permitting.&nbsp;<\/p>\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/events.ringcentral.com\/events\/thriving-communities-managing-growth-with-gis-centric-permitting\/registration?utm_source=third-party&amp;utm_medium=referral&amp;utm_campaign=701PO00000f3Wi6YAE&amp;utm_content=Esri-Blog-Webinar-1\"><img loading=\"lazy\" decoding=\"async\" width=\"826\" height=\"465\" src=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/Thriving-Communities-Managing-Growth-with-GIS-Centric-Permitting-1.png\" alt=\"\" class=\"wp-image-586298\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/Thriving-Communities-Managing-Growth-with-GIS-Centric-Permitting-1.png 826w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/Thriving-Communities-Managing-Growth-with-GIS-Centric-Permitting-1-300x169.png 300w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/Thriving-Communities-Managing-Growth-with-GIS-Centric-Permitting-1-768x432.png 768w\" sizes=\"auto, (max-width: 826px) 100vw, 826px\" \/><\/a><\/figure>\n\n<p class=\"has-text-align-center wp-block-paragraph\"><strong><a href=\"https:\/\/events.ringcentral.com\/events\/thriving-communities-managing-growth-with-gis-centric-permitting\/registration?utm_source=third-party&amp;utm_medium=referral&amp;utm_campaign=701PO00000f3Wi6YAE&amp;utm_content=Esri-Blog-Webinar-1\">Thriving Communities: Managing Growth with GIS-Centric Permitting<\/a><\/strong><br><strong>Date:<\/strong> Tuesday, August 25<br><strong>Time:<\/strong> 1:00 PM to 2:00 PM Eastern<\/p>\n\n<p class=\"wp-block-paragraph\"><strong>What You\u2019ll Learn<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\">Discover how MetroConnects successfully modernized their operations to handle surging development. Facing a 55% increase in permit demand, MetroConnects shifted from paper-reliant workflows to an automated, GIS-driven platform using Trimble technology integrated with Esri\u2019s ArcGIS.&nbsp;<\/p>\n\n<p class=\"wp-block-paragraph\">By adopting this centralized approach, MetroConnects:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>Accelerated review cycles<\/li>\n\n<li>Eliminated manual work order creation<\/li>\n\n<li>Increased transparency for developers through a digital portal<\/li>\n<\/ul>\n\n<p class=\"wp-block-paragraph\"><strong>Today, MetroConnects seamlessly processes over 2,400 permits annually without increasing administrative burdens.<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\">Attend this session to learn how a geographic approach to permitting can help your agency streamline workflows, ensure regulatory compliance, and manage infrastructure demands.<\/p>\n\n<p class=\"wp-block-paragraph\"><strong>Speakers<\/strong><\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong><a href=\"https:\/\/www.linkedin.com\/in\/jaketittle\/\" target=\"_blank\" rel=\"noreferrer noopener\">Jake Tittle<\/a>, MetroConnects CIO\u00a0<\/strong><\/li>\n\n<li><strong><a href=\"https:\/\/www.linkedin.com\/in\/acarnow\/\" target=\"_blank\" rel=\"noreferrer noopener\">Adam Carnow<\/a>, Esri Public Works Industry Specialist\u00a0<\/strong><\/li>\n\n<li><strong><a href=\"https:\/\/www.linkedin.com\/in\/bruce-jumper-1993ab56\/\" target=\"_blank\" rel=\"noreferrer noopener\">Bruce Jumper<\/a>, Trimble Partner Advisor\u00a0<\/strong><\/li>\n\n<li><strong><a href=\"https:\/\/www.linkedin.com\/in\/brett-ruoti-01818b13\/\" target=\"_blank\" rel=\"noreferrer noopener\">Brett Ruoti<\/a>, Trimble EAM Senior Sales Manager\u00a0<\/strong><\/li>\n<\/ul>\n\n<p class=\"wp-block-paragraph\"><strong><strong><a href=\"https:\/\/events.ringcentral.com\/events\/thriving-communities-managing-growth-with-gis-centric-permitting\/registration?utm_source=third-party&amp;utm_medium=referral&amp;utm_campaign=701PO00000f3Wi6YAE&amp;utm_content=Esri-Blog-Webinar-1\">Register Today<\/a><\/strong><\/strong><\/p>","protected":false},"author":1752,"featured_media":0,"parent":0,"menu_order":0,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2452],"tags":[6585,6584,6032,6550,521,6553,2462,4702,6567],"class_list":["post-586244","blog","type-blog","status-publish","format-standard","hentry","category-public-works","tag-digital-permitting","tag-gis-centric","tag-local-government","tag-modernization","tag-partner","tag-permitting","tag-public-works","tag-trimble","tag-trimble-unity","industry-public-works"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.9 (Yoast SEO v25.9) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Your Community Can\u2019t Afford Inefficient Permitting: Let Esri and Trimble Show You What\u2019s Possible with GIS-Centric Permitting<\/title>\n<meta name=\"description\" content=\"Inefficient permitting slows growth and frustrates stakeholders. Learn how Esri and Trimble\u2019s GIS-centric permitting solution helps modernize workflows, improve transparency, and accelerate development.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/pw-gis-centric-permitting-arcgis-trimble-unity-permit-webinar\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Your Community Can\u2019t Afford Inefficient Permitting: Let Esri and Trimble Show You What\u2019s Possible with GIS-Centric Permitting\" \/>\n<meta property=\"og:description\" content=\"Inefficient permitting slows growth and frustrates stakeholders. Learn how Esri and Trimble\u2019s GIS-centric permitting solution helps modernize workflows, improve transparency, and accelerate development.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/pw-gis-centric-permitting-arcgis-trimble-unity-permit-webinar\" \/>\n<meta property=\"og:site_name\" content=\"Industry Blogs\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-13T00:22:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/Thriving-Communities-Managing-Growth-with-GIS-Centric-Permitting-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"826\" \/>\n\t<meta property=\"og:image:height\" content=\"465\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/pw-gis-centric-permitting-arcgis-trimble-unity-permit-webinar\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/pw-gis-centric-permitting-arcgis-trimble-unity-permit-webinar\",\"name\":\"Your Community Can\u2019t Afford Inefficient Permitting: Let Esri and Trimble Show You What\u2019s Possible with GIS-Centric Permitting\",\"isPartOf\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/pw-gis-centric-permitting-arcgis-trimble-unity-permit-webinar#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/pw-gis-centric-permitting-arcgis-trimble-unity-permit-webinar#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/Thriving-Communities-Managing-Growth-with-GIS-Centric-Permitting-1.png\",\"datePublished\":\"2026-08-13T00:19:51+00:00\",\"dateModified\":\"2026-08-13T00:22:47+00:00\",\"description\":\"Inefficient permitting slows growth and frustrates stakeholders. Learn how Esri and Trimble\u2019s GIS-centric permitting solution helps modernize workflows, improve transparency, and accelerate development.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/pw-gis-centric-permitting-arcgis-trimble-unity-permit-webinar#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/pw-gis-centric-permitting-arcgis-trimble-unity-permit-webinar\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/pw-gis-centric-permitting-arcgis-trimble-unity-permit-webinar#primaryimage\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/Thriving-Communities-Managing-Growth-with-GIS-Centric-Permitting-1.png\",\"contentUrl\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/Thriving-Communities-Managing-Growth-with-GIS-Centric-Permitting-1.png\",\"width\":826,\"height\":465},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/pw-gis-centric-permitting-arcgis-trimble-unity-permit-webinar#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Your Community Can\u2019t Afford Inefficient Permitting: Let Esri and Trimble Show You What\u2019s Possible with GIS-Centric Permitting\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/\",\"name\":\"Industry Blogs\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/4ba99cebd3ac32bc3efc093f2c5931cb\",\"name\":\"Sergio Gutierrez\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/ee3b4a919bbf6b07b8e70fc358ebd3ffbe394880aa1a1c3340c6641d52447cbc?s=96&d=blank&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/ee3b4a919bbf6b07b8e70fc358ebd3ffbe394880aa1a1c3340c6641d52447cbc?s=96&d=blank&r=g\",\"caption\":\"Sergio Gutierrez\"},\"url\":\"\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Your Community Can\u2019t Afford Inefficient Permitting: Let Esri and Trimble Show You What\u2019s Possible with GIS-Centric Permitting","description":"Inefficient permitting slows growth and frustrates stakeholders. Learn how Esri and Trimble\u2019s GIS-centric permitting solution helps modernize workflows, improve transparency, and accelerate development.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/pw-gis-centric-permitting-arcgis-trimble-unity-permit-webinar","og_locale":"en_US","og_type":"article","og_title":"Your Community Can\u2019t Afford Inefficient Permitting: Let Esri and Trimble Show You What\u2019s Possible with GIS-Centric Permitting","og_description":"Inefficient permitting slows growth and frustrates stakeholders. Learn how Esri and Trimble\u2019s GIS-centric permitting solution helps modernize workflows, improve transparency, and accelerate development.","og_url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/pw-gis-centric-permitting-arcgis-trimble-unity-permit-webinar","og_site_name":"Industry Blogs","article_modified_time":"2026-08-13T00:22:47+00:00","og_image":[{"width":826,"height":465,"url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/Thriving-Communities-Managing-Growth-with-GIS-Centric-Permitting-1.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/pw-gis-centric-permitting-arcgis-trimble-unity-permit-webinar","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/pw-gis-centric-permitting-arcgis-trimble-unity-permit-webinar","name":"Your Community Can\u2019t Afford Inefficient Permitting: Let Esri and Trimble Show You What\u2019s Possible with GIS-Centric Permitting","isPartOf":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/pw-gis-centric-permitting-arcgis-trimble-unity-permit-webinar#primaryimage"},"image":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/pw-gis-centric-permitting-arcgis-trimble-unity-permit-webinar#primaryimage"},"thumbnailUrl":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/Thriving-Communities-Managing-Growth-with-GIS-Centric-Permitting-1.png","datePublished":"2026-08-13T00:19:51+00:00","dateModified":"2026-08-13T00:22:47+00:00","description":"Inefficient permitting slows growth and frustrates stakeholders. Learn how Esri and Trimble\u2019s GIS-centric permitting solution helps modernize workflows, improve transparency, and accelerate development.","breadcrumb":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/pw-gis-centric-permitting-arcgis-trimble-unity-permit-webinar#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/pw-gis-centric-permitting-arcgis-trimble-unity-permit-webinar"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/pw-gis-centric-permitting-arcgis-trimble-unity-permit-webinar#primaryimage","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/Thriving-Communities-Managing-Growth-with-GIS-Centric-Permitting-1.png","contentUrl":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/Thriving-Communities-Managing-Growth-with-GIS-Centric-Permitting-1.png","width":826,"height":465},{"@type":"BreadcrumbList","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/pw-gis-centric-permitting-arcgis-trimble-unity-permit-webinar#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.esri.com\/en-us\/industries\/blog"},{"@type":"ListItem","position":2,"name":"Your Community Can\u2019t Afford Inefficient Permitting: Let Esri and Trimble Show You What\u2019s Possible with GIS-Centric Permitting"}]},{"@type":"WebSite","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/","name":"Industry Blogs","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.esri.com\/en-us\/industries\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/4ba99cebd3ac32bc3efc093f2c5931cb","name":"Sergio Gutierrez","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/ee3b4a919bbf6b07b8e70fc358ebd3ffbe394880aa1a1c3340c6641d52447cbc?s=96&d=blank&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ee3b4a919bbf6b07b8e70fc358ebd3ffbe394880aa1a1c3340c6641d52447cbc?s=96&d=blank&r=g","caption":"Sergio Gutierrez"},"url":""}]}},"text_date":"August 13, 2026","author_name":"Adam Carnow","author_page":"https:\/\/www.esri.com\/en-us\/industries\/blog\/author\/adam-carnow","custom_image":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/05\/permitting2.jpg","primary_product":"Public Works","tag_data":[{"term_id":6585,"name":"digital permitting","slug":"digital-permitting","term_group":0,"term_taxonomy_id":6585,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":6584,"name":"gis centric","slug":"gis-centric","term_group":0,"term_taxonomy_id":6584,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":6032,"name":"Local Government","slug":"local-government","term_group":0,"term_taxonomy_id":6032,"taxonomy":"post_tag","description":"","parent":0,"count":1,"filter":"raw"},{"term_id":6550,"name":"modernization","slug":"modernization","term_group":0,"term_taxonomy_id":6550,"taxonomy":"post_tag","description":"","parent":0,"count":2,"filter":"raw"},{"term_id":521,"name":"Partner","slug":"partner","term_group":0,"term_taxonomy_id":521,"taxonomy":"post_tag","description":"","parent":0,"count":3,"filter":"raw"},{"term_id":6553,"name":"Permitting","slug":"permitting","term_group":0,"term_taxonomy_id":6553,"taxonomy":"post_tag","description":"","parent":0,"count":3,"filter":"raw"},{"term_id":2462,"name":"Public Works","slug":"public-works","term_group":0,"term_taxonomy_id":2462,"taxonomy":"post_tag","description":"","parent":0,"count":30,"filter":"raw"},{"term_id":4702,"name":"Trimble","slug":"trimble","term_group":0,"term_taxonomy_id":4702,"taxonomy":"post_tag","description":"","parent":0,"count":4,"filter":"raw"},{"term_id":6567,"name":"Trimble Unity","slug":"trimble-unity","term_group":0,"term_taxonomy_id":6567,"taxonomy":"post_tag","description":"","parent":0,"count":2,"filter":"raw"}],"category_data":[{"term_id":2452,"name":"Public Works","slug":"public-works","term_group":0,"term_taxonomy_id":2452,"taxonomy":"category","description":"","parent":140,"count":28,"filter":"raw"}],"product_data":{"errors":{"invalid_taxonomy":["Invalid taxonomy."]},"error_data":[]},"primary_product_link":"https:\/\/www.esri.com\/en-us\/industries\/blog\/industry\/public-works","short_description":"See how Esri and Trimble are helping communities accelerate permitting with GIS-centric workflows and improved transparency.","image":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/Thriving-Communities-Managing-Growth-with-GIS-Centric-Permitting.png","_links":{"self":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article\/586244","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article"}],"about":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/types\/blog"}],"author":[{"embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/users\/1752"}],"version-history":[{"count":0,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article\/586244\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/media?parent=586244"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/categories?post=586244"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/tags?post=586244"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}