{"id":586749,"date":"2026-08-25T23:24:41","date_gmt":"2026-08-25T23:24:41","guid":{"rendered":"https:\/\/www.esri.com\/en-us\/industries\/blog\/?post_type=blog&#038;p=586749"},"modified":"2026-09-02T14:46:30","modified_gmt":"2026-09-02T14:46:30","slug":"building-a-practical-water-utility-gis-program-one-project-at-a-time","status":"publish","type":"blog","link":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/building-a-practical-water-utility-gis-program-one-project-at-a-time","title":{"rendered":"From Zero to Value: Building a Practical Water Utility GIS Program One Project at a Time"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><em>Written by Albany Zavarce and Chris Reagan, Spalding County Water Authority<\/em><\/p>\n\n<h2 class=\"wp-block-heading\" id=\"h-introduction\"><strong>Introduction<\/strong><\/h2>\n\n<p class=\"wp-block-paragraph\">The <a href=\"https:\/\/www.scwa.us\/\">Spalding County Water Authority<\/a> (SCWA) serves more than 16,000 customers throughout Spalding County, Georgia. Its water distribution system includes over 531 miles of water mains, multiple pressure zones, 3,829 valves, and 3,286 fire hydrants. SCWA works closely with the City of <a href=\"https:\/\/en.wikipedia.org\/wiki\/Griffin,_Georgia\">Griffin<\/a>, which supplies treated water to SCWA through its reservoir and treatment infrastructure. As SCWA continues expanding its services, it is currently constructing its first lift station and developing its wastewater collection and treatment facilities. Recognizing that these new responsibilities require greater operational efficiency, SCWA identified the modernization of its business processes as a critical step in supporting future operations and long-term growth.<\/p>\n\n<p class=\"wp-block-paragraph\">As recently as 2024, SCWA had limited geographic information system (GIS) capabilities, relying mainly on the use of information scattered across paper forms, spreadsheets, and disconnected processes, maximizing the cost, and limiting informed decision-making and collaboration between field crews, office staff, and leadership. ArcGIS Online was implemented, but with no clear management processes, data was duplicated and outdated.<\/p>\n\n<p class=\"wp-block-paragraph\">Today, SCWA\u2019s GIS program is supported by two GIS analysts and a GIS manager, along with staff across multiple departments who bring GIS experience to their daily work. This collaborative approach allows teams to contribute and share data from different operational perspectives while maintaining a clear, centralized, and accessible system. The result is a streamlined workflow, improved data quality, and better coordination across the organization.<\/p>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1669\" src=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/GIS_Team-scaled.png\" alt=\"GIS Staff in parking lot, photo taken via drone\" class=\"wp-image-586752\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/GIS_Team-scaled.png 2560w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/GIS_Team-1536x1002.png 1536w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/GIS_Team-2048x1335.png 2048w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/GIS_Team-713x465.png 713w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/GIS_Team-1656x1080.png 1656w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><figcaption class=\"wp-element-caption\"><em><em>GIS Manager Chris Reagan and GIS Analysts Albany Zavarce and Matthew Gilchrist During a Drone Mission<\/em><\/em><\/figcaption><\/figure>\n<\/div>\n\n<h2 class=\"wp-block-heading\" id=\"h-the-challenge\">The Challenge<\/h2>\n\n<p class=\"wp-block-paragraph\">SCWA\u2019s goal was never to implement GIS technology. The objective was to improve how the organization operated and better serve its customers.<\/p>\n\n<p class=\"wp-block-paragraph\">Just about four years ago, SCWA hired a general manager, Joseph Johnson, who shifted the course to an independent water utility rather than a county department. New water service requests and other utility services relied heavily on paper forms and manual handoffs, making the process of decision-making and coordination inconsistent. Progress updates regarding new water services frequently required phone calls or emails, and reporting of status could take days to compile.<\/p>\n\n<p class=\"wp-block-paragraph\">Through the integration of GIS workflows, SCWA significantly improved operational efficiency by reducing processes that once took days to just a few clicks. <a href=\"https:\/\/www.esri.com\/en-us\/arcgis\/products\/arcgis-survey123\/overview\">ArcGIS Survey123<\/a>, <a href=\"https:\/\/www.esri.com\/en-us\/arcgis\/products\/arcgis-field-maps\/overview\">ArcGIS Field Maps<\/a>, and web applications such as <a href=\"https:\/\/www.esri.com\/en-us\/arcgis\/products\/arcgis-dashboards\/overview\">ArcGIS Dashboards<\/a> were implemented to streamline service updates, centralize data management, and enhance communication between office and field staff, resulting in faster, more accurate workflows.<\/p>\n\n<p class=\"wp-block-paragraph\">This led to a simple guiding principle:<\/p>\n\n<p class=\"has-text-align-center wp-block-paragraph\"><strong>Every GIS project should either improve decision-making or increase operational efficiency.<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\">Rather than trying to modernize every process simultaneously, SCWA focused on solving one meaningful operational problem at a time.<\/p>\n\n<h2 class=\"wp-block-heading\" id=\"h-building-a-practical-gis-strategy\">Building a Practical GIS Strategy<\/h2>\n\n<p class=\"wp-block-paragraph\">Instead of beginning with large, complex initiatives, SCWA\u2019s GIS manager, Chris Reagan, and general manager Joseph Johnson meet weekly during a GIS backlog grooming session to identify opportunities where GIS can improve existing workflows. Joseph, as SCWA representative stakeholder, brings forward operational needs and priorities based on his understanding of SCWA\u2019s challenges, while Chris facilitates GIS-based solutions to address those needs. Once a project is identified, Chris works with the GIS analyst team to further develop and implement the solution, with a focus on making processes more efficient for both office staff and field crews.<\/p>\n\n<p class=\"wp-block-paragraph\">Using a variety of Esri products such as <a href=\"https:\/\/www.esri.com\/en-us\/arcgis\/products\/arcgis-pro\/overview\">ArcGIS Pro<\/a>, <a href=\"https:\/\/www.esri.com\/en-us\/arcgis\/products\/arcgis-online\/overview\">ArcGIS Online<\/a>, ArcGIS Survey123, ArcGIS Field Maps, ArcGIS Dashboards, and <a href=\"https:\/\/www.microsoft.com\/en\/power-platform\/products\/power-automate?market=af\">Microsoft Power Automate<\/a>, the GIS team was able to build practical workflows that were easy for staff to adopt and which provided immediate operational benefits.<\/p>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1674\" height=\"1095\" src=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/workflow_SCWA_GISBase.png\" alt=\"Data access and management workflow\" class=\"wp-image-586761\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/workflow_SCWA_GISBase.png 1674w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/workflow_SCWA_GISBase-1536x1005.png 1536w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/workflow_SCWA_GISBase-711x465.png 711w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/workflow_SCWA_GISBase-1651x1080.png 1651w\" sizes=\"auto, (max-width: 1674px) 100vw, 1674px\" \/><figcaption class=\"wp-element-caption\"><em>A workflow diagram illustrates how SCWA staff access and manage data from the field, the office, and remote locations using integrated GIS applications, allowing them to have centralized access to the same up-to-date data.<\/em><\/figcaption><\/figure>\n<\/div>\n\n<p class=\"wp-block-paragraph\">Each successful implementation created confidence in the next project. Employees experienced firsthand how GIS could simplify their daily work, while leadership gained better visibility into operations through real-time information and dashboards. This incremental approach allowed GIS adoption to grow naturally throughout the organization.<\/p>\n\n<p class=\"wp-block-paragraph\"><strong>\u201cWhen I started, everything revolved around paper. [Now] we spend less time looking for information and more time actually using it to solve problems and help our customers. That\u2019s a major win for our team. It is crazy when I think about pulling that huge map on antique paper out looking for water lines. It makes me giggle.\u201d<\/strong> <em>\u2014Charlie Hearn, Office Manager, Spalding County SCWA<\/em><\/p>\n\n<p class=\"wp-block-paragraph\"><strong>\u201cGIS is the way of life. I can\u2019t live without it. When you look at everything we do throughout the day, GIS is involved in so much of it. Before GIS, if we needed to find information, we might have to look through 100 different paper maps. Now, GIS makes everything so much easier because all of that information is in one place.\u201d<\/strong> <em>\u2014Danny Pryor, Water Superintendent, SCWA<\/em><\/p>\n\n<h2 class=\"wp-block-heading\" id=\"h-improving-the-new-water-service-process\"><strong>Improving the New Water Service Process<\/strong><\/h2>\n\n<p class=\"wp-block-paragraph\">SCWA also redesigned its new water service workflow, which processes approximately 250 service requests each year.<\/p>\n\n<p class=\"wp-block-paragraph\">The previous process relied heavily on paper-based methods and manual communication between the office and field staff, which included one to two office staff and two to four field operations staff. Customers would come into the office to complete a water service request form, which generated three carbon copies. The office kept the white copy, while the maintenance crew received the pink and yellow copies to take to the customer\u2019s property for meter installation. After completing the installation and recording the materials used, the crew kept the pink copy and returned the yellow copy to the office. Charlie Hearn, the office manager, would then scan the yellow copy along with the service contract and send the documents to the City of Griffin for billing. Once the City of Griffin entered the service into their records, they would contact Charlie to confirm that it had been processed.<\/p>\n\n<p class=\"wp-block-paragraph\">By integrating GIS technologies such as ArcGIS, SCWA created a digital workflow that connects office staff, field crews, and management. Requests now move through the process more efficiently, notifications are automated, and leadership can monitor project status without requesting updates from staff. The result is faster communication, better coordination, and improved customer service.<\/p>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1481\" height=\"1099\" src=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/Workflow_NewWaterService.png\" alt=\"The new water service workflow shows how ArcGIS technologies are employed to facilitate the process.\" class=\"wp-image-586760\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/Workflow_NewWaterService.png 1481w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/Workflow_NewWaterService-627x465.png 627w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/Workflow_NewWaterService-1455x1080.png 1455w\" sizes=\"auto, (max-width: 1481px) 100vw, 1481px\" \/><figcaption class=\"wp-element-caption\"><em>The new water service workflow shows how ArcGIS technologies are employed to facilitate the process.<\/em><\/figcaption><\/figure>\n<\/div>\n\n<p class=\"wp-block-paragraph\"><strong>\u201c[The] process has become more efficient with GIS because we can quickly verify the information needed to serve a customer. Today, GIS allows us to locate a property almost instantly and see the existing water infrastructure, parcel information, and nearby mains. That means we can answer questions more quickly, determine whether service is available, identify potential issues early, and provide better information to both customers and developers.\u201d<\/strong> <em>\u2014Charlie Hearn, Office Manager, SCWA<\/em><\/p>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1902\" height=\"941\" src=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/NewWaterService_Dashboard.png\" alt=\"The New Water Service Working Dashboard displays the status of water service installations from request to completion, giving staff real-time visibility into work assignments, project progress, and service updates through a centralized GIS platform. \" class=\"wp-image-586756\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/NewWaterService_Dashboard.png 1902w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/NewWaterService_Dashboard-1536x760.png 1536w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/NewWaterService_Dashboard-826x409.png 826w\" sizes=\"auto, (max-width: 1902px) 100vw, 1902px\" \/><figcaption class=\"wp-element-caption\"><em>The New Water Service Working Dashboard displays the status of water service installations from request to completion, giving staff real-time visibility into work assignments, project progress, and service updates through a centralized GIS platform. <\/em><\/figcaption><\/figure>\n<\/div>\n\n<p class=\"wp-block-paragraph\"><strong>\u201cThe new water service process is easier and faster. It\u2019s a game changer for us. Before, nothing was on the computer, so if we needed past information, we had to go through millions of papers in filing cabinets. Now, we mainly rely on GIS, and everything is right there.\u201d<\/strong> <em>\u2014Danny Pryor, Water Superintendent, SCWA<\/em><\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"513\" height=\"766\" data-id=\"586751\" src=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/ArchivedPaperUsed.png\" alt=\"Archived Paper Records Stored in Filing Cabinets\" class=\"wp-image-586751\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/ArchivedPaperUsed.png 513w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/ArchivedPaperUsed-311x465.png 311w\" sizes=\"auto, (max-width: 513px) 100vw, 513px\" \/><figcaption class=\"wp-element-caption\">Archived Paper Records Stored in Filing Cabinets<\/figcaption><\/figure>\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"688\" height=\"1024\" data-id=\"586750\" src=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/ArchivedPaperNew.png\" alt=\"\" class=\"wp-image-586750\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/ArchivedPaperNew.png 688w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/ArchivedPaperNew-312x465.png 312w\" sizes=\"auto, (max-width: 688px) 100vw, 688px\" \/><figcaption class=\"wp-element-caption\">Archived Paper Records Stored in Filing Cabinets<\/figcaption><\/figure>\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"493\" height=\"769\" data-id=\"586783\" src=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/ArchivedPaperYellow.png\" alt=\"\" class=\"wp-image-586783\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/ArchivedPaperYellow.png 493w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/ArchivedPaperYellow-192x300.png 192w\" sizes=\"auto, (max-width: 493px) 100vw, 493px\" \/><figcaption class=\"wp-element-caption\">Archived Paper Records Stored in Filing Cabinets<\/figcaption><\/figure>\n<\/figure>\n\n<p class=\"wp-block-paragraph\"><strong>\u201cWe can now evaluate and process new service requests much faster with greater accuracy, giving developers and customers quicker, more reliable answers.\u201d<\/strong> <em>\u2014Joseph Johnson, General Manager, SCWA<\/em><\/p>\n\n<h2 class=\"wp-block-heading\" id=\"h-modernizing-hydrant-inspections\"><strong>Modernizing Hydrant Inspections<\/strong><\/h2>\n\n<p class=\"wp-block-paragraph\">Hydrant inspections became one of SCWA\u2019s first major operational improvements because they offered significant value with a reasonable implementation effort. Previously, inspections relied on paper forms, requiring field crews to manually record data and re-enter it into office systems, making tracking, reporting, and management inefficient. By implementing ArcGIS Survey123 and ArcGIS Field Maps, inspectors can now complete and submit inspections directly from mobile devices, eliminating duplicate data entry and improving data accuracy. Inspection results are immediately available, allowing supervisors to monitor progress in real time through ArcGIS Dashboards instead of waiting days for manual reports. Because hydrant inspections are performed annually, the GIS-based workflow provides lasting value by creating a repeatable, efficient process that can continue to deliver operational benefits year after year.<\/p>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1897\" height=\"927\" src=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/Hydrant_Dashboard.png\" alt=\"A hydrant inspection dashboard displays real-time inspection progress, completed and pending inspections, and key metrics to help staff monitor maintenance activities and prioritize field operations. \" class=\"wp-image-586753\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/Hydrant_Dashboard.png 1897w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/Hydrant_Dashboard-1536x751.png 1536w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/Hydrant_Dashboard-826x404.png 826w\" sizes=\"auto, (max-width: 1897px) 100vw, 1897px\" \/><figcaption class=\"wp-element-caption\"><em>A hydrant inspection dashboard displays real-time inspection progress, completed and pending inspections, and key metrics to help staff monitor maintenance activities and prioritize field operations. <\/em><\/figcaption><\/figure>\n<\/div>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"2420\" height=\"1816\" data-id=\"586754\" src=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/hydrant_flushing_GIS1.png\" alt=\"SCWA utility system tech Greg Ballard conducts a routine hydrant inspection, documenting field conditions and collecting information to support accurate infrastructure records and maintenance activities.\" class=\"wp-image-586754\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/hydrant_flushing_GIS1.png 2420w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/hydrant_flushing_GIS1-1536x1153.png 1536w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/hydrant_flushing_GIS1-2048x1537.png 2048w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/hydrant_flushing_GIS1-620x465.png 620w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/hydrant_flushing_GIS1-1439x1080.png 1439w\" sizes=\"auto, (max-width: 2420px) 100vw, 2420px\" \/><\/figure>\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1816\" height=\"2420\" data-id=\"586755\" src=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/hydrant_flushing_gps.png\" alt=\"\" class=\"wp-image-586755\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/hydrant_flushing_gps.png 1816w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/hydrant_flushing_gps-1153x1536.png 1153w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/hydrant_flushing_gps-1537x2048.png 1537w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/hydrant_flushing_gps-349x465.png 349w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/hydrant_flushing_gps-810x1080.png 810w\" sizes=\"auto, (max-width: 1816px) 100vw, 1816px\" \/><\/figure>\n<\/figure>\n\n<p class=\"has-text-align-center wp-block-paragraph\"><em>SCWA utility system tech Greg Ballard conducts a routine hydrant inspection, documenting field conditions and collecting information to support accurate infrastructure records and maintenance activities.<\/em><\/p>\n\n<p class=\"wp-block-paragraph\"><strong>\u201cEsri and the apps Chris created using the GIS technology has been a great addition to our work environment. It not only pinpoints all of our assets but keeps track of all of our work so we can refer back for information. We can also review maps to keep up with our progress and keep track of what we have and haven\u2019t done. Plus, all the data from our assets is right at our fingertips. All this has made my job much easier.\u201d<\/strong> <em>\u2014Greg Ballard, Utility System Tech, SCWA<\/em><\/p>\n\n<p class=\"wp-block-paragraph\"><strong>\u201cIt\u2019s much easier to track, and it completely changed our whole hydrant maintenance system. Before, the workload was twice as much. We had to take paper copies to Excel from the fire department, but now everything is in one system that we can access in the field on our iPads. It\u2019s easier to manage and understand. We basically reinvented our own wheel with the tablets.\u201d<\/strong> <em>\u2014Danny Pryor, Water Superintendent, SCWA<\/em><\/p>\n\n<h2 class=\"wp-block-heading\" id=\"h-streamlining-lead-and-copper-rule-compliance\"><strong>Streamlining Lead and Copper Rule Compliance<\/strong><\/h2>\n\n<p class=\"wp-block-paragraph\">When the revised <a href=\"https:\/\/www.epa.gov\/dwreginfo\/lead-and-copper-rule\">Lead and Copper Rule<\/a> required utilities to inventory service line materials, SCWA saw the mandate as an opportunity to modernize another critical business process.<\/p>\n\n<p class=\"wp-block-paragraph\">Field crews used ArcGIS Field Maps and Survey123 to document service line materials during inspections conducted between April 2025 and June 2026. Over that period, crews inspected more than 8,000 service lines. Automated workflows updated GIS records and operational dashboards in real time, giving leadership immediate visibility into inspection progress and supporting more informed operational decision-making.<\/p>\n\n<p class=\"wp-block-paragraph\">By completing the project internally using ArcGIS technologies, SCWA developed a powerful and sustainable GIS solution that enables staff to efficiently manage the entire workflow in-house. The implementation of this system streamlined data collection, tracking, and updates, allowing employees to complete tasks more quickly while maintaining accurate records. SCWA estimates that completing the project internally avoided approximately $1 million in contractor costs. Although the organization invested time in training staff to use the new GIS tools, that investment has resulted in long-term operational savings, improved efficiency, and a scalable solution that continues to support daily operations and can evolve to meet future needs.<\/p>\n\n<p class=\"wp-block-paragraph\"><strong>\u201cInvesting in GIS gave us accurate, reliable data that improves decision-making, increases efficiency, and better prepares us for future growth.\u201d<\/strong> <em>\u2014Joseph Johnson, General Manager, SCWA<\/em><\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-3 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1905\" height=\"938\" data-id=\"586757\" src=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/ServiceLine_Dashboard.png\" alt=\"ServiceLine_Dashboard\" class=\"wp-image-586757\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/ServiceLine_Dashboard.png 1905w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/ServiceLine_Dashboard-1536x756.png 1536w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/ServiceLine_Dashboard-826x407.png 826w\" sizes=\"auto, (max-width: 1905px) 100vw, 1905px\" \/><\/figure>\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1862\" height=\"761\" data-id=\"586759\" src=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/ServiceLine_Survey123Results.png\" alt=\"ServiceLine_Survey123Results\" class=\"wp-image-586759\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/ServiceLine_Survey123Results.png 1862w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/ServiceLine_Survey123Results-1536x628.png 1536w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/ServiceLine_Survey123Results-826x338.png 826w\" sizes=\"auto, (max-width: 1862px) 100vw, 1862px\" \/><\/figure>\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"497\" height=\"801\" data-id=\"586758\" src=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/ServiceLine_Survey123_Form.png\" alt=\"ServiceLine_Survey123_Form\" class=\"wp-image-586758\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/ServiceLine_Survey123_Form.png 497w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/ServiceLine_Survey123_Form-289x465.png 289w\" sizes=\"auto, (max-width: 497px) 100vw, 497px\" \/><\/figure>\n<\/figure>\n\n<p class=\"has-text-align-center wp-block-paragraph\"><em>The current design of the dashboard and Survey 123 displays the service line inventory of the Lead and Copper Rule that provides stakeholders the ability to monitor progress in real time.<\/em><\/p>\n\n<h2 class=\"wp-block-heading\" id=\"h-results\">Results<\/h2>\n\n<p class=\"wp-block-paragraph\">Over the course of two years, GIS technology has become an essential component of SCWA\u2019s daily operations, transforming how the organization manages data and makes decisions. Rather than functioning as a stand-alone technology, GIS has become a core business strategy that supports every stage of the workflow. By integrating GIS into daily operations, SCWA has reduced processes that once took weeks to real-time updates, minimized paper-based workflows, improved data accuracy, reduced rework, and increased field productivity by enabling staff to complete more inspections and service activities efficiently.<\/p>\n\n<p class=\"wp-block-paragraph\"><strong>Perhaps the most significant achievement has been organizational adoption.<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\">Rather than asking employees to change everything at once, SCWA introduced practical solutions that addressed everyday challenges. As staff experienced the benefits firsthand, confidence in GIS grew naturally. Each successful project created momentum for the next, transforming GIS from a specialized mapping function into a trusted business system that supports decision-making across the utility.<\/p>\n\n<p class=\"wp-block-paragraph\"><strong>\u201cWhen Chris first told us he was going to implement an app for new water service requests, I\u2019ll admit I was nervous. I didn\u2019t know what to expect. It didn\u2019t take long to realize I had nothing to worry about. The app was intuitive, easy to learn, and whenever I suggested something that would make the process better, Chris made the improvements. That made a big difference because it felt like the app was being built with the people who actually use it every day in mind. I had spent so many years doing the process manually that efficiency almost felt wrong at first.\u201d<\/strong> <em>\u2014<\/em>Charlie Hearn, Office Manager, SCWA<\/p>\n\n<h2 class=\"wp-block-heading\" id=\"h-as-the-organization-evolves\"><strong>As the Organization Evolves<\/strong><\/h2>\n\n<p class=\"wp-block-paragraph\">Looking ahead, SCWA remains committed to strengthening its GIS foundation as it continues to expand both its technological capabilities and utility infrastructure. Future initiatives include implementing ArcGIS Enterprise and ArcGIS Utility Network to enhance outage management by identifying affected customers, safely isolating damaged infrastructure, and supporting the utility\u2019s new wastewater system, which is scheduled for completion by the end of 2026. Additional initiatives include expanding drone operations, integrating GIS with OpenGov, and continuing to enhance asset management workflows. As ArcGIS technologies continue to evolve, SCWA\u2019s approach remains consistent: identifying meaningful operational challenges, developing practical GIS solutions, and creating lasting organizational value through continuous innovation and improvement.<\/p>\n\n<p class=\"wp-block-paragraph\"><strong>\u201cWhen I look back at where we started, the biggest accomplishment isn\u2019t any one application, map, or dashboard. It\u2019s seeing people who once relied on paper and spreadsheets now asking, \u2018Can GIS do this?\u2019 That question tells me we\u2019ve changed the way people think about information. We didn\u2019t build GIS overnight. We built it one problem at a time, and along the way, it became part of the culture at SCWA.\u201d<\/strong> <em>\u2014Chris Reagan, GIS Manager, SCWA<\/em><\/p>\n\n<p class=\"wp-block-paragraph\"><strong>\u201cGIS has evolved from a simple mapping tool into a core business system that supports engineering, operations, planning, and customer service. GIS has transformed how we manage our infrastructure by turning data into actionable information that saves time, improves service, and supports smart growth.\u201d<\/strong> <em>\u2014Joseph Johnson, General Manager, SCWA<\/em><\/p>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1484\" height=\"900\" src=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/SCWA-Logo.png\" alt=\"SCWA Logo\" class=\"wp-image-586768\" style=\"aspect-ratio:1.6488973407355152;width:551px;height:auto\" srcset=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/SCWA-Logo.png 1484w, https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/SCWA-Logo-767x465.png 767w\" sizes=\"auto, (max-width: 1484px) 100vw, 1484px\" \/><\/figure>\n<\/div>\n\n<p class=\"has-text-align-left wp-block-paragraph\">For more information about SWCA, please visit: <a href=\"https:\/\/www.scwa.us\/\">https:\/\/www.scwa.us\/<\/a> <\/p>\n\n<h2 class=\"wp-block-heading\" id=\"h-stay-connected-with-esri-s-water-team\">Stay Connected with Esri&#8217;s Water Team<\/h2>\n\n<p class=\"wp-block-paragraph\">ArcGIS is an enterprise geospatial platform that enables modernization of workflows with easy-to-use applications for the field and office. Strengthen your organization with geospatial solutions that will increase efficiency and provide insight for decision-makers.<\/p>\n\n<p class=\"wp-block-paragraph\">Visit the&nbsp;<a href=\"https:\/\/www.esri.com\/en-us\/industries\/water-utilities\/overview\" target=\"_blank\" rel=\"noreferrer noopener\">Esri Water Utilities<\/a>&nbsp;web site for more information.<\/p>\n\n<p class=\"wp-block-paragraph\">Join the&nbsp;<a href=\"https:\/\/community.esri.com\/t5\/water-utilities\/ct-p\/water-utilities\" target=\"_blank\" rel=\"noreferrer noopener\">Water Utilities Community<\/a><\/p>\n\n<p class=\"wp-block-paragraph\">Follow #EsriWater on social media:&nbsp;<a href=\"https:\/\/twitter.com\/EsriWater\" target=\"_blank\" rel=\"noreferrer noopener\">X<\/a> |&nbsp;<a href=\"https:\/\/www.linkedin.com\/groups\/6533227\" target=\"_blank\" rel=\"noreferrer noopener\">LinkedIn<\/a><\/p>\n\n<p class=\"wp-block-paragraph\">Subscribe to the Water Industry newsletter \u201c<a href=\"https:\/\/www.esri.com\/en-us\/industries\/water\/water-news\" target=\"_blank\" rel=\"noreferrer noopener\">Esri News for Water Utilities and Water Resources<\/a>\u201c<\/p>","protected":false},"author":1854,"featured_media":0,"parent":0,"menu_order":0,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[1762,6132],"tags":[451,176,287,652,431],"class_list":["post-586749","blog","type-blog","status-publish","format-standard","hentry","category-water-utilities","category-water-utilities-2","tag-arcgis","tag-asset-management","tag-gis","tag-infrastructure","tag-water-utilities","industry-water","industry-water-utilities"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.9 (Yoast SEO v25.9) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>From Zero to Value: Building a Practical Water Utility GIS Program One Project at a Time<\/title>\n<meta name=\"description\" content=\"Discover how a Georgia water utility transformed paper-based processes into real-time operations using ArcGIS, dashboards, mobile apps, and GIS workflows.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/building-a-practical-water-utility-gis-program-one-project-at-a-time\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"From Zero to Value: Building a Practical Water Utility GIS Program One Project at a Time\" \/>\n<meta property=\"og:description\" content=\"Discover how a Georgia water utility transformed paper-based processes into real-time operations using ArcGIS, dashboards, mobile apps, and GIS workflows.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/building-a-practical-water-utility-gis-program-one-project-at-a-time\" \/>\n<meta property=\"og:site_name\" content=\"Industry Blogs\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-02T14:46:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/GIS_Team-scaled.png\" \/>\n\t<meta property=\"og:image:width\" content=\"640\" \/>\n\t<meta property=\"og:image:height\" content=\"417\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/building-a-practical-water-utility-gis-program-one-project-at-a-time\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/building-a-practical-water-utility-gis-program-one-project-at-a-time\",\"name\":\"From Zero to Value: Building a Practical Water Utility GIS Program One Project at a Time\",\"isPartOf\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/building-a-practical-water-utility-gis-program-one-project-at-a-time#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/building-a-practical-water-utility-gis-program-one-project-at-a-time#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/GIS_Team-scaled.png\",\"datePublished\":\"2026-08-25T23:24:41+00:00\",\"dateModified\":\"2026-09-02T14:46:30+00:00\",\"description\":\"Discover how a Georgia water utility transformed paper-based processes into real-time operations using ArcGIS, dashboards, mobile apps, and GIS workflows.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/building-a-practical-water-utility-gis-program-one-project-at-a-time#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/building-a-practical-water-utility-gis-program-one-project-at-a-time\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/building-a-practical-water-utility-gis-program-one-project-at-a-time#primaryimage\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/GIS_Team-scaled.png\",\"contentUrl\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/GIS_Team-scaled.png\",\"width\":2560,\"height\":1669,\"caption\":\"GIS Staff in parking lot, photo taken via drone.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/building-a-practical-water-utility-gis-program-one-project-at-a-time#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"From Zero to Value: Building a Practical Water Utility GIS Program One Project at a Time\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/\",\"name\":\"Industry Blogs\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/cb5ebf19f5610dcf02121096dbce2198\",\"name\":\"Miranda McBride\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/image3_McBride-150x150.jpg\",\"contentUrl\":\"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/image3_McBride-150x150.jpg\",\"caption\":\"Miranda McBride\"},\"description\":\"Miranda is a water industry professional with over 7 years of experience using geospatial technologies to help utilities improve operational efficiency and reduce risk. Her background includes the National Park Service, private GIS consulting, and a GIS leadership role within a large wastewater utility. She has supported drinking water, wastewater, and stormwater programs through asset management, floodplain and stormwater mapping, and strategic geospatial development. As an Industry Solutions Specialist, Miranda partners with water organizations to enable data-driven decision making and support long-term digital transformation.\",\"sameAs\":[\"https:\/\/www.linkedin.com\/in\/mirdmcbride\/\"],\"jobTitle\":\"Industry Solutions Specialist, Water\",\"worksFor\":\"Esri\",\"url\":\"\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"From Zero to Value: Building a Practical Water Utility GIS Program One Project at a Time","description":"Discover how a Georgia water utility transformed paper-based processes into real-time operations using ArcGIS, dashboards, mobile apps, and GIS workflows.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/building-a-practical-water-utility-gis-program-one-project-at-a-time","og_locale":"en_US","og_type":"article","og_title":"From Zero to Value: Building a Practical Water Utility GIS Program One Project at a Time","og_description":"Discover how a Georgia water utility transformed paper-based processes into real-time operations using ArcGIS, dashboards, mobile apps, and GIS workflows.","og_url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/building-a-practical-water-utility-gis-program-one-project-at-a-time","og_site_name":"Industry Blogs","article_modified_time":"2026-09-02T14:46:30+00:00","og_image":[{"url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/GIS_Team-scaled.png","width":640,"height":417,"type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/building-a-practical-water-utility-gis-program-one-project-at-a-time","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/building-a-practical-water-utility-gis-program-one-project-at-a-time","name":"From Zero to Value: Building a Practical Water Utility GIS Program One Project at a Time","isPartOf":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/building-a-practical-water-utility-gis-program-one-project-at-a-time#primaryimage"},"image":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/building-a-practical-water-utility-gis-program-one-project-at-a-time#primaryimage"},"thumbnailUrl":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/GIS_Team-scaled.png","datePublished":"2026-08-25T23:24:41+00:00","dateModified":"2026-09-02T14:46:30+00:00","description":"Discover how a Georgia water utility transformed paper-based processes into real-time operations using ArcGIS, dashboards, mobile apps, and GIS workflows.","breadcrumb":{"@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/building-a-practical-water-utility-gis-program-one-project-at-a-time#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/building-a-practical-water-utility-gis-program-one-project-at-a-time"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/building-a-practical-water-utility-gis-program-one-project-at-a-time#primaryimage","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/GIS_Team-scaled.png","contentUrl":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/GIS_Team-scaled.png","width":2560,"height":1669,"caption":"GIS Staff in parking lot, photo taken via drone."},{"@type":"BreadcrumbList","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/articles\/building-a-practical-water-utility-gis-program-one-project-at-a-time#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.esri.com\/en-us\/industries\/blog"},{"@type":"ListItem","position":2,"name":"From Zero to Value: Building a Practical Water Utility GIS Program One Project at a Time"}]},{"@type":"WebSite","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#website","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/","name":"Industry Blogs","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.esri.com\/en-us\/industries\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/cb5ebf19f5610dcf02121096dbce2198","name":"Miranda McBride","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esri.com\/en-us\/industries\/blog\/#\/schema\/person\/image\/","url":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/image3_McBride-150x150.jpg","contentUrl":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/image3_McBride-150x150.jpg","caption":"Miranda McBride"},"description":"Miranda is a water industry professional with over 7 years of experience using geospatial technologies to help utilities improve operational efficiency and reduce risk. Her background includes the National Park Service, private GIS consulting, and a GIS leadership role within a large wastewater utility. She has supported drinking water, wastewater, and stormwater programs through asset management, floodplain and stormwater mapping, and strategic geospatial development. As an Industry Solutions Specialist, Miranda partners with water organizations to enable data-driven decision making and support long-term digital transformation.","sameAs":["https:\/\/www.linkedin.com\/in\/mirdmcbride\/"],"jobTitle":"Industry Solutions Specialist, Water","worksFor":"Esri","url":""}]}},"text_date":"August 25, 2026","author_name":"Esri Water","author_page":false,"custom_image":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/WaterTower3.png","primary_product":"Water","tag_data":[{"term_id":451,"name":"ArcGIS","slug":"arcgis","term_group":0,"term_taxonomy_id":451,"taxonomy":"post_tag","description":"","parent":0,"count":106,"filter":"raw"},{"term_id":176,"name":"asset management","slug":"asset-management","term_group":0,"term_taxonomy_id":176,"taxonomy":"post_tag","description":"","parent":0,"count":29,"filter":"raw"},{"term_id":287,"name":"GIS","slug":"gis","term_group":0,"term_taxonomy_id":287,"taxonomy":"post_tag","description":"","parent":0,"count":203,"filter":"raw"},{"term_id":652,"name":"Infrastructure","slug":"infrastructure","term_group":0,"term_taxonomy_id":652,"taxonomy":"post_tag","description":"","parent":0,"count":54,"filter":"raw"},{"term_id":431,"name":"water utilities","slug":"water-utilities","term_group":0,"term_taxonomy_id":431,"taxonomy":"post_tag","description":"","parent":0,"count":52,"filter":"raw"}],"category_data":[{"term_id":1762,"name":"Water Utilities","slug":"water-utilities","term_group":0,"term_taxonomy_id":1762,"taxonomy":"category","description":"","parent":147,"count":57,"filter":"raw"},{"term_id":6132,"name":"Water Utilities","slug":"water-utilities-2","term_group":0,"term_taxonomy_id":6132,"taxonomy":"category","description":"","parent":0,"count":23,"filter":"raw"}],"product_data":{"errors":{"invalid_taxonomy":["Invalid taxonomy."]},"error_data":[]},"primary_product_link":"https:\/\/www.esri.com\/en-us\/industries\/blog\/industry\/water","short_description":"Spalding County Water Authority built a successful GIS program one project at a time, improving efficiency, data quality, and service.","image":"https:\/\/www.esri.com\/en-us\/industries\/blog\/app\/uploads\/2026\/08\/SCWA_Banner_resized3_CARD.jpg","_links":{"self":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article\/586749","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article"}],"about":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/types\/blog"}],"author":[{"embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/users\/1854"}],"version-history":[{"count":0,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/article\/586749\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/media?parent=586749"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/categories?post=586749"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.esri.com\/en-us\/industries\/blog\/wp-json\/wp\/v2\/tags?post=586749"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}